TIS PV ISOTEST - Solar PV Multifunction Performance Tester

Поділитися
Вставка
  • Опубліковано 4 січ 2025

КОМЕНТАРІ • 2

  • @jlaowens
    @jlaowens 8 місяців тому +1

    I’m testing harness’s on a PV system and my problem is when down loading data for 10 test only 4 or 5 show up being available on the ladder to the right. Rebooted the equipment and retried and then 8 show up. Is there a solution to this issue?

    • @testinstrumentsolutions
      @testinstrumentsolutions  8 місяців тому

      This came back from technical at HT Italia
      We can try to reduce the latency time of the COM port. To do so, with C2006 cable connected to PC and disconnected from the instrument:
      Device management --> COM and LPT ports -->Right button --> Properties --> Port settings --> Advanced
      image001.gif
      - Set the latency time to 1ms and press OK. Remove and replace the C2006 cable from the USB and try connecting to the instrument via topview .
      - If the setting fails, repeat the previous step by setting the latency time to 8ms
      Let us know if this works!