Radio Quarry Hunslet

Поділитися
Вставка
  • Опубліковано 12 вер 2024
  • An Accucraft 7/8s Quarry Hunslet was having problems with moving itself let alone a load. It was collected and given the once over. After resetting the eccentrics, replacing the split O ring in the safety valve and a few other jobs it was given our usual 'load 10 + water' to pull today. The regulator is less than half open and pressure was just nudging 30 psi. The results aren't too bad....

КОМЕНТАРІ • 1

  • @johnvine5731
    @johnvine5731 2 роки тому

    The railway fits nicely in it's surroundings. The civil engineering is superb!