Total float - the float available for the whole path and free float is only for one activity ✔️. No formula to calculate free float. Thank you for the excellent explanation
Thank you for your feedback. You can explore our complete content of PMP (Project Management Professional) Based on PMBOK6 here: www.izenbridge.com/pmp/online-course/
Hi, If you are looking for some really good, Informational and fundamental Videos on of how to Calculate the Float in a easy to digest way, I strongly Recommend you to check out the below link, I promise you will learn something new, Thank you ua-cam.com/video/QD1bzTc5-s4/v-deo.html
Congratulations!! keep exploring. All the best for your future career goals. To know more Saket Training programs, please visit - www.izenbridge.com/landing/youtube/Saket-Bansal/
Thank you!! Texas for exploring and appreciating our content. In continuation to it, you can explore our video on Critical Path Method ua-cam.com/video/eZgv1BW1lCU/v-deo.html
Hi, If you are looking for some really good, Informational and fundamental Videos on of how to Calculate the Float in a easy to digest way, I strongly Recommend you to check out the below link, I promise you will learn something new, Thank you ua-cam.com/video/QD1bzTc5-s4/v-deo.html
Happy to know you liked the video!! Keep exploring iZenBridge UA-cam Channel. Also, you can explore iZenBridge PMP program here - www.izenbridge.com/pmp/online-course/ It is complete and comes with an end to end support.
Thanks for your kind words!! To know more about PMP program please visit - www.izenbridge.com/pmp/online-course/ It is complete and comes with an end to end support.
First of all thanks for all your free videos. I watched most of your. Videos and then studied PMBOK sixth edition book. I just got my PMP certificate in my first attempt and studied just for 10 weeks. Your videos were very good help for me, good explanation and short duration videos.
Thank you!! DJ for exploring our content. Good to know that our resources were useful to you and helped you in clearing your PMP Certification. Keep watching our content on Agile and Scrum. Connect with us at sales@izenbridge.com, if you want to renew your PMP credentials
Hi, If you are looking for some really good, Informational and fundamental Videos on of how to Calculate the Float in a easy to digest way, I strongly Recommend you to check out the below link, I promise you will learn something new, Thank you ua-cam.com/video/QD1bzTc5-s4/v-deo.html
Glad it was helpful! To know more iZenBridge PMP program, please visit - www.izenbridge.com/pmp/online-course/ It is complete and comes with an end to end support
Glad it was helpful! Saket does many trainings apart from PMP, he is the lead trainer for ICP-ACC, ICP-APM, ICP-BAF, SAFe, and many more. In case you need more details, please visit iZenBridge.com
Thanks for the explanation. i have a doubt. in case of parallel processing the total float of some activities may be negative? how? can you explain? or probably put a video on it
Thank you !! Subroto, for exploring and liking our content In Continuation to it, you can explore our video on Funding Limit Reconciliation & S-Curve ua-cam.com/video/pPDkUS-Uvvw/v-deo.html
Thank you!! Raed, for exploring and liking our content. Project float is the total float of the project. In continuation to it, you can explore our video on Critical Path Method ua-cam.com/video/eZgv1BW1lCU/v-deo.html
Hi, If you are looking for some really good, Informational and fundamental Videos on of how to Calculate the Float in a easy to digest way, I strongly Recommend you to check out the below link, I promise you will learn something new, Thank you ua-cam.com/video/QD1bzTc5-s4/v-deo.html
Glad you liked it. You can explore iZenBridge complete program here - www.izenbridge.com/pmp/online-course/ This is complete and comes with an end to end support.
Free float is considered in relation with its successor activity. It is the time for which we can delay an activity without delaying the early start date of any successor. So it does not impact predecessor activity.
Thank you!! Leszek, for exploring our video. Please elaborate your query. You can also join our exclusive discussion forum (forum.izenbridge.com) and post your queries there. You will find many similar discussions already going on.
Thank you!! for exploring and liking our content. In continuation to it, you can also explore the following video on "Critical Path Method" - ua-cam.com/video/eZgv1BW1lCU/v-deo.html
Hi, If you are looking for some really good, Informational and fundamental Videos on of how to Calculate the Float in a easy to digest way, I strongly Recommend you to check out the below link, I promise you will learn something new, Thank you ua-cam.com/video/QD1bzTc5-s4/v-deo.html
No, independent float and free float are different. Free Float - You have some flexibility to delay an activity. And, when you consume that flexibility even then, its successor activity can start at its early start. It does not need to begin at Late Start. Independent Float - In the case of the independent float of activity - The situation is even if its predecessor finishes at late finishes, the successor of that activity can begin at its Early Start. For example - Duration of an activity is 2 Its predecessor late finish is 4 It's successor Early start is 8 When predecessor finish on day 4 by it's Late Finish, the activity in question finishes by day 6, but you can finish it by day 8 as next activity early start is 8 So activity in question has an independent float. In the case of Free Float, we don't see when its predecessor finishes.
Hi Tonya, thank you for exploring our content. You can explore our complete content of PMP (Project Management Professional) Based on PMBOK6 here: www.izenbridge.com/pmp/online-course/
Hi, If you are looking for some really good, Informational and fundamental Videos on of how to Calculate the Float in a easy to digest way, I strongly Recommend you to check out the below link, I promise you will learn something new, Thank you ua-cam.com/video/QD1bzTc5-s4/v-deo.html
Thank you!! Zamella for exploring and liking our content. You can explore our complete content of PMP (Project Management Professional) Based on PMBOK6 here: www.izenbridge.com/pmp/online-course/
Hi, If you are looking for some really good, Informational and fundamental Videos on of how to Calculate the Float in a easy to digest way, I strongly Recommend you to check out the below link, I promise you will learn something new, Thank you ua-cam.com/video/QD1bzTc5-s4/v-deo.html
Thank you!! Bipin for exploring and liking our content. In continuation, you can also explore our video on " Critical Path Method" ua-cam.com/video/eZgv1BW1lCU/v-deo.html
Hi, If you are looking for some really good, Informational and fundamental Videos on of how to Calculate the Float in a easy to digest way, I strongly Recommend you to check out the below link, I promise you will learn something new, Thank you ua-cam.com/video/QD1bzTc5-s4/v-deo.html
Thank you !! Holt for exploring our PMP content. Good to know that it was helpful to you. In continuation to it, you can explore our video on Critical Path Method ua-cam.com/video/eZgv1BW1lCU/v-deo.html
Thank you!! Shipra, for exploring and appreciating our content. If you are preparing for the PMP Exam, you can also explore the video on "Do I need to memorize Inputs, Tools & Techniques and Outputs" ua-cam.com/video/3nK-2GV9ZOQ/v-deo.html
Glad you liked it!! To know more about PMP program, please visit - www.izenbridge.com/pmp/online-course/ It is complete and comes with an end to end support.
Thank you !! Adel, for exploring our content and appreciating Saket Sir. You can enrol to our online PMP course to watch all 82 videos as per PMBOK Guide sixth edition. www.izenbridge.com/pmp/online-course/
Thank you!! Binit, for exploring our content. Yes Free Float is the amount of time that a schedule activity can be delayed without delaying the early start date of any successor. So free float is the flexibility at activity level and total float is the flexibility at the path level.
Hi, If you are looking for some really good, Informational and fundamental Videos on of how to Calculate the Float in a easy to digest way, I strongly Recommend you to check out the below link, I promise you will learn something new, Thank you ua-cam.com/video/QD1bzTc5-s4/v-deo.html
How to identify the Total float, Free float & Negative float for given PDM. Start -- A -- Duration - 2days; A to B & A to D B -- Duration - 3days; B to C - C -- Duration - 1day; C to G - G -- Duration - 2days --> End A to D - D -- Duration - 4days; D to E - E -- Duration - 1 day; E to F - F -- Duration - 4days; F to G - G -- Duration - 2days; --> End
To calculate total float, understand the whole work complete date, and days that are needed to complete the critical path. If you have 25 days to finish work and the critical path will take 20 days, then you have 5 days of total float. You may have a negative float like you estimated to finish an activity in 10 days, but due to an upcoming festival, you have to finish it in five days. Here, you have a negative float of five days. The free float can be at any activity level if its successor start time is delayed, so it has some flexibility. For more details, please refer: www.izenbridge.com/blog/what-is-float-calculate-total-free-float/
Thank you, Noman for exploring content. In continuation to it, you can also explore our video on Critical Path Method ua-cam.com/video/eZgv1BW1lCU/v-deo.html
Total float - the float available for the whole path and free float is only for one activity ✔️. No formula to calculate free float. Thank you for the excellent explanation
I have already attended some classes, and the way you explain the concepts is fantastic
Thank you for your feedback. You can explore our complete content of PMP (Project Management Professional) Based on PMBOK6 here: www.izenbridge.com/pmp/online-course/
Hi, If you are looking for some really good, Informational and fundamental Videos on of how to Calculate the Float in a easy to digest way, I strongly Recommend you to check out the below link, I promise you will learn something new, Thank you
ua-cam.com/video/QD1bzTc5-s4/v-deo.html
I passed my PMP exams 3 days ago. Your videos were very helpful. Thanks
Congratulations!! Keep exploring iZenBridge UA-cam Channel.
I passed my PMP exam last month. Your videos were helpful. Thanks
Congratulations!! keep exploring. All the best for your future career goals. To know more Saket Training programs, please visit - www.izenbridge.com/landing/youtube/Saket-Bansal/
Exactly what I was looking for. Explaination was clear and concise.
Thanks for your kind words!! To know more about Saket training programs, please visit - www.izenbridge.com/landing/youtube/Saket-Bansal/
The way you are explaining is awesome and conceptual
glad you liked it, we also run complete program on PMP, you may want to explore
www.izenbridge.com/pmp/online-course/
Thank you! This is the best explanation yet.
Thank you!! Texas for exploring and appreciating our content. In continuation to it, you can explore our video on Critical Path Method
ua-cam.com/video/eZgv1BW1lCU/v-deo.html
Hi, If you are looking for some really good, Informational and fundamental Videos on of how to Calculate the Float in a easy to digest way, I strongly Recommend you to check out the below link, I promise you will learn something new, Thank you
ua-cam.com/video/QD1bzTc5-s4/v-deo.html
Amazing explanation with no PPT but a simple board and marker. Thank you very much sir.
Happy to know you liked the video!! Keep exploring iZenBridge UA-cam Channel. Also, you can explore iZenBridge PMP program here - www.izenbridge.com/pmp/online-course/
It is complete and comes with an end to end support.
Your, sir, are a gifted teacher. Thank you.
Thanks for your kind words!! To know more about PMP program please visit - www.izenbridge.com/pmp/online-course/
It is complete and comes with an end to end support.
You always explain with examples. Understood. Thank you so much sir.
Thanks for watching video, keep exploring iZenBridge UA-cam Channel.
First of all thanks for all your free videos. I watched most of your. Videos and then studied PMBOK sixth edition book. I just got my PMP certificate in my first attempt and studied just for 10 weeks. Your videos were very good help for me, good explanation and short duration videos.
Thank you!! DJ for exploring our content. Good to know that our resources were useful to you and helped you in clearing your PMP Certification. Keep watching our content on Agile and Scrum.
Connect with us at sales@izenbridge.com, if you want to renew your PMP credentials
Hi, If you are looking for some really good, Informational and fundamental Videos on of how to Calculate the Float in a easy to digest way, I strongly Recommend you to check out the below link, I promise you will learn something new, Thank you
ua-cam.com/video/QD1bzTc5-s4/v-deo.html
This guy has amazing explaination skills
Thank you
Wonderful lecture ever
Wow... Concept felt like crystal clear... Thankyou very much sir...🙌
Glad to hear that
simply put, clear to understand. thank you sir.
Glad to hear that
Thanks soo much for the wonderful explanation. You are an awesome teacher.
Glad it was helpful! To know more iZenBridge PMP program, please visit - www.izenbridge.com/pmp/online-course/
It is complete and comes with an end to end support
Hello Sir, thank you so much for sharing videos. You are doing a great work. I passed my PMP and would like to personally meet and thank you!
Congratulations!! It is encouraging that iZenBridge videos played a role in your success.
Amazing..thank you for verifying these concepts..very helpful!
Glad it was helpful!
Fantastic explanation.
Thanks for your kind words!! Keep exploring iZenBridge UA-cam Channel.
Thank you so much
I wanna know how to deal with lags if I found any
Specially if the act. which has lag depends on to activities
Thank you for your clear and excellent description
Thanks for your kind words, to know more about Saket training programs, please visit - www.izenbridge.com/landing/youtube/Saket-Bansal/
nice explanation sir
Excellent 👍
Thank you.
You did extremely GOOD job sir! Thanks for the explanation
Glad it was helpful! Saket does many trainings apart from PMP, he is the lead trainer for ICP-ACC, ICP-APM, ICP-BAF, SAFe, and many more. In case you need more details, please visit iZenBridge.com
Thanks for the explanation. i have a doubt.
in case of parallel processing the total float of some activities may be negative? how? can you explain? or probably put a video on it
Thank you Saket Sir. This was a great example. And explanation using diagrams is a great way for us to remember.
Thank you !! Subroto, for exploring and liking our content
In Continuation to it, you can explore our video on Funding Limit Reconciliation & S-Curve
ua-cam.com/video/pPDkUS-Uvvw/v-deo.html
On the second example there is a SS relation so you can’t delay activity C
Good explanation
Thanks for liking
Excellent!
Thank you! Cheers! In case you wish to explore, we also run Live sessions for PMP preparations:
www.izenbridge.com/pmp/online-course/
Best explanation. But what about the Project float?
Thank you!! Raed, for exploring and liking our content. Project float is the total float of the project.
In continuation to it, you can explore our video on Critical Path Method
ua-cam.com/video/eZgv1BW1lCU/v-deo.html
Thank you very much, your video is pretty good and useful. I learned so much. Hope you be safe ♥️♥️
Hi, If you are looking for some really good, Informational and fundamental Videos on of how to Calculate the Float in a easy to digest way, I strongly Recommend you to check out the below link, I promise you will learn something new, Thank you
ua-cam.com/video/QD1bzTc5-s4/v-deo.html
Well explained thanks!
Glad you liked it. You can explore iZenBridge complete program here - www.izenbridge.com/pmp/online-course/
This is complete and comes with an end to end support.
This is exceptional!
Thanks for your kind words Lilia. To know more about complete PMP program, please visit - www.izenbridge.com/pmp/online-course/
perfect video
Glad it helped!! To know more Saket complete PMP program, please visit - www.izenbridge.com/pmp/online-course/
How come you're so awesome sirr 😊🙏🙏
Thank you so much 😀
Can free float affects the predessor activity
Free float is considered in relation with its successor activity. It is the time for which we can delay an activity without delaying the early start date of any successor. So it does not impact predecessor activity.
FF = minimum ES of Successors - ES of the activity - duration of the activity in question
Thank you!! Leszek, for exploring our video. Please elaborate your query.
You can also join our exclusive discussion forum (forum.izenbridge.com) and post your queries there. You will find many similar discussions already going on.
Free Float =Early Start of Successor Activity - Early Start of Predecessor Activity -Project Duration
Nicely explained
Thanks for tour kind words!! Keep an eye to see more PMBOK6 videos, we publish them on regular basis.
Well done, good explanation.
Thank you!! for exploring and liking our content. In continuation to it, you can also explore the following video
on "Critical Path Method" -
ua-cam.com/video/eZgv1BW1lCU/v-deo.html
Again found you quite helpful
Happy to know Ehan that you liked the video. Keep exploring iZenBridge UA-cam Channel.
Hi, If you are looking for some really good, Informational and fundamental Videos on of how to Calculate the Float in a easy to digest way, I strongly Recommend you to check out the below link, I promise you will learn something new, Thank you
ua-cam.com/video/QD1bzTc5-s4/v-deo.html
Is negative float and independent float the same sir?
No, independent float and free float are different.
Free Float - You have some flexibility to delay an activity. And, when you consume that flexibility even then, its successor activity can start at its early start. It does not need to begin at Late Start.
Independent Float - In the case of the independent float of activity - The situation is even if its predecessor finishes at late finishes, the successor of that activity can begin at its Early Start.
For example -
Duration of an activity is 2
Its predecessor late finish is 4
It's successor Early start is 8
When predecessor finish on day 4 by it's Late Finish, the activity in question finishes by day 6, but you can finish it by day 8 as next activity early start is 8
So activity in question has an independent float.
In the case of Free Float, we don't see when its predecessor finishes.
@@izenbridge thanks a lot sir!!!understood
@@anandhakrishnanh9802 Great!!
Good explanation. Thanks.
Hi Tonya, thank you for exploring our content. You can explore our complete content of PMP (Project Management Professional) Based on PMBOK6 here: www.izenbridge.com/pmp/online-course/
E
Hi, If you are looking for some really good, Informational and fundamental Videos on of how to Calculate the Float in a easy to digest way, I strongly Recommend you to check out the below link, I promise you will learn something new, Thank you
ua-cam.com/video/QD1bzTc5-s4/v-deo.html
Thank you helping me a lot.
Thank you!! Zamella for exploring and liking our content.
You can explore our complete content of PMP (Project Management Professional) Based on PMBOK6 here: www.izenbridge.com/pmp/online-course/
Formula of Free Float: ES of next Activity - EF of current Activity
Good explanation 👍🔥
Thank you for your kind words, keep exploring iZenBridge UA-cam Channel.
Hi, If you are looking for some really good, Informational and fundamental Videos on of how to Calculate the Float in a easy to digest way, I strongly Recommend you to check out the below link, I promise you will learn something new, Thank you
ua-cam.com/video/QD1bzTc5-s4/v-deo.html
I hope you solve some ex.
thanks a lot for making this video
Thank you!! Bipin for exploring and liking our content. In continuation, you can also explore our video on " Critical Path Method"
ua-cam.com/video/eZgv1BW1lCU/v-deo.html
Hi, If you are looking for some really good, Informational and fundamental Videos on of how to Calculate the Float in a easy to digest way, I strongly Recommend you to check out the below link, I promise you will learn something new, Thank you
ua-cam.com/video/QD1bzTc5-s4/v-deo.html
Free float effects preceding activity
Great explanation Sir.. Thanks. love you sir as i found all your tutorials excellent.
So nice of you!! To know more about Saket training programs, please visit - www.izenbridge.com/landing/youtube/Saket-Bansal/
Thanks for the clarification
Thank you !! Holt for exploring our PMP content. Good to know that it was helpful to you.
In continuation to it, you can explore our video on Critical Path Method
ua-cam.com/video/eZgv1BW1lCU/v-deo.html
Too good sir
Thank you!! Shipra, for exploring and appreciating our content. If you are preparing for the PMP Exam, you can also explore the video on "Do I need to memorize Inputs, Tools & Techniques and Outputs"
ua-cam.com/video/3nK-2GV9ZOQ/v-deo.html
Nice
Glad you liked it!! To know more about PMP program, please visit - www.izenbridge.com/pmp/online-course/
It is complete and comes with an end to end support.
Man, u r genius, how can i find all your videos
Thank you !! Adel, for exploring our content and appreciating Saket Sir.
You can enrol to our online PMP course to watch all 82 videos as per PMBOK Guide sixth edition.
www.izenbridge.com/pmp/online-course/
Fee float is time period for any activity can be delayed without affecting Early start of successor activity.
Thank you!! Binit, for exploring our content.
Yes Free Float is the amount of time that a schedule activity can be delayed without delaying the early start date of any successor. So free float is the flexibility at activity level and total float is the flexibility at the path level.
Hi, If you are looking for some really good, Informational and fundamental Videos on of how to Calculate the Float in a easy to digest way, I strongly Recommend you to check out the below link, I promise you will learn something new, Thank you
ua-cam.com/video/QD1bzTc5-s4/v-deo.html
awesome
How to identify the Total float, Free float & Negative float for given PDM.
Start -- A -- Duration - 2days; A to B & A to D
B -- Duration - 3days;
B to C - C -- Duration - 1day;
C to G - G -- Duration - 2days --> End
A to D - D -- Duration - 4days;
D to E - E -- Duration - 1 day;
E to F - F -- Duration - 4days;
F to G - G -- Duration - 2days; --> End
To calculate total float, understand the whole work complete date, and days that are needed to complete the critical path. If you have 25 days to finish work and the critical path will take 20 days, then you have 5 days of total float. You may have a negative float like you estimated to finish an activity in 10 days, but due to an upcoming festival, you have to finish it in five days. Here, you have a negative float of five days. The free float can be at any activity level if its successor start time is delayed, so it has some flexibility. For more details, please refer: www.izenbridge.com/blog/what-is-float-calculate-total-free-float/
my god i thought it was a programming class...
Thank you, Noman for exploring content. In continuation to it, you can also explore our video on Critical Path Method
ua-cam.com/video/eZgv1BW1lCU/v-deo.html