Greetings from Richmond, Virginia! Salamat kaayo sa update, Sir! Good job! Sayon na jud ang pagtabok tabok diha puhon makauli mi December. Thanks a lot!
Buti pa itong panguil bay bridge bihirang mabalita na meron pala project dto at parang isang kislap lng malapit na palang matapos,pro yung sa samal island noong q pa naririnig na itatayo grade 1 pa lng aq noon ngayon nagka apo na aq nasa grade 3 na yung apo q hanggang ngayon drawing pa rin ang tulay sa samal island dvo del norte😂
Bkit isang straight line lang gawa ang panguil tulay , sana denisign nag curve naman , imagine 3 km ang haba , walang trill at ecxitement, hindi pinaghirapan , hoy mga filipino engineers bkit di kyo nah oppose o nagsuggest....
Dont be stupid. Kaya simple lang ang design nyan ay para cost effective at iwas gastos. Ang importante sa design of structures ay safe, reliable, durable at cost effective. Appearance is NOT a priority.
Dont be stupid. Kaya simple lang ang design nyan ay para cost effective at iwas gastos. Ang importante sa design of structures ay safe, reliable, durable at cost effective. Appearance is NOT a priority.
Salamat sa upload sir
Ur welcome
Greetings from Richmond, Virginia! Salamat kaayo sa update, Sir! Good job! Sayon na jud ang pagtabok tabok diha puhon makauli mi December. Thanks a lot!
Thank you sir...❤❤❤❤
Salamat sa upload brad.
Salamat sir
Almost there
Thank you
Buti pa itong panguil bay bridge bihirang mabalita na meron pala project dto at parang isang kislap lng malapit na palang matapos,pro yung sa samal island noong q pa naririnig na itatayo grade 1 pa lng aq noon ngayon nagka apo na aq nasa grade 3 na yung apo q hanggang ngayon drawing pa rin ang tulay sa samal island dvo del norte😂
Salamat at unti unti na rin natatapos tong project
Daghana tagalog sa mindanao, katong mga bisaya nga naka kawarta na..😂😂😂😆🇵🇭❤️🇨🇳
Admin, just an inquiry, What are the names of the companyies of contractors and subcontractors?
The contractors are koreans, Namkwang Engineering- Kukdong & Gumwang Joint Venture
@@jeddabs7383 Thank you for the information
hapit na jud mahuman gamay nlangpag antus.
Hapit na jud ma sumpay
Iyan SA baba resort beach villa god blesd
Hindi po beach
Naa ney side walk?
Yes merun po
24 cable?
Only 12 cables, it was continuous cable not individual cable
Admin, Is this Road just 2 lanes or 4 lanes traffic?
6 lanes
Four lanes po yan sir 2 lanes per way
2 lanes only
nope, 2 lanes only
hindi po 6 lanes, 2 lanes lang
Saan po yan?
Mindanao po
anf pahnget the BRIDGE. WALA MAN LANG KA-DRIP DRIP. very ordinary
Yes simple design but cost effective...
function over form
AH THE SAME STORY HISTORY. THE CONTRACTORS LACKING IN PREPARATION. BIG PROBLEM FOR FABRICATING MODEL ?
Puro ka reklamo back to work and be thankful
Wala ka namang naitulong..just shut up!!!!
Kung china puro chinese trabahador walang pilipino ugok
Typical DDS reply.😂😂😂@@aldinpelena3642
@@jeddabs7383ano ang punto mo barahin ang mag comment sa content mo? 😂😂😂😆🇵🇭❤️🇨🇳
Bkit isang straight line lang gawa ang panguil tulay , sana denisign nag curve naman , imagine 3 km ang haba , walang trill at ecxitement, hindi pinaghirapan , hoy mga filipino engineers bkit di kyo nah oppose o nagsuggest....
Dont be stupid. Kaya simple lang ang design nyan ay para cost effective at iwas gastos. Ang importante sa design of structures ay safe, reliable, durable at cost effective. Appearance is NOT a priority.
Dont be stupid. Kaya simple lang ang design nyan ay para cost effective at iwas gastos. Ang importante sa design of structures ay safe, reliable, durable at cost effective. Appearance is NOT a priority.
Ok sana boss kung ikaw ang magbigay ng budget...loan pa nga to ng pinas sa korea
yung curved bridges d dinedesign for the sake of looks, most likely needed yung curves dahil sa foundation constraints
Tàtàk dútérte yàn bàkà àñgkíñiñ namàñ sa mgà tambaloslos nàkaúpó íbabàlíta ñg mgà bàyas bàyaran medíà sà luzóñ😂😂😂😂😂😂😂
Hahahhaa anyway thanks
Admin, Is this Road just 2 lanes or 4 lanes traffic?
Only 2 lanes sir
The contractors are koreans, Namkwang Engineering- Kukdong & Gumwang Joint Venture
@@jeddabs7383 This will be a problem if only 2 lanes. Standard modern highway bridges will be at least 4 lanes.
@@biboyumandar1538 our dpwh dont have budget to make it 4 lanes...this is already loan project to korean bank
@@jeddabs7383 That is a very sad and unacceptable reason.
Is this part of the Build Build Build program?