Tunnel 33. 13 years of undying effort It took to build one tunnel of 5.3 km. And it was the biggest stumbling block in the entire USBRL project. Because it cuts through the Main Boundary Thrust which in seismic terms is a fault line. Highly unstable and filled with water and prone to slippages. Building that tunnel which repeatedly collapsed during construction and flooded with water was the biggest challenge of the entire project. And we pulled it off. Kudos Konkan Railway Engineering. A grateful nation bows to you in sheer respect.
USBRL ke poore hi project me sabse jyada time to "construction ke liye kiye gye construction" me invest karna pda hai. Means, for each and every bridge, tunnel and station, first a road to site was constructed, then big land filling for factory shades done, then huge work-shops were set up. Also, workers quarters, canteens, management offices, officers' chambers and rest houses were made. Big fields for raw materials, equipment and machines were prepared. Simultaneously, power lines and mobile connectivity were established. Facilities for security and medical support were also prepared. All types of work force were hired and trained on site and off site and even at other places (like Konkan region) all along this time. After all these huge works done, then the very first step towards "main construction" was initiated. Just imagine how gigantic this whole project has been.
And we don't need Chinese help to do these high tech engineering projects 😉... Salute to our scientists, engineers and of course our workers who make these kind of projects a reality 🙏🇮🇳
Please react to W.i.S.H Boom Boom Song. W.i.S.H. is an Indian pop girl group. The group consists of four members: Ri (Riya Duggal), Sim (Simran Duggal), Zo (Zoe Siddharth) and Suchi (Suchita Shirk)
We pay tax happily when we find that our hardearned money is honestly utilized for our country's development. Jai Hind.
Yes
Tunnel 33. 13 years of undying effort It took to build one tunnel of 5.3 km. And it was the biggest stumbling block in the entire USBRL project. Because it cuts through the Main Boundary Thrust which in seismic terms is a fault line. Highly unstable and filled with water and prone to slippages. Building that tunnel which repeatedly collapsed during construction and flooded with water was the biggest challenge of the entire project. And we pulled it off. Kudos Konkan Railway Engineering. A grateful nation bows to you in sheer respect.
Great info 👍
USBRL ke poore hi project me sabse jyada time to "construction ke liye kiye gye construction" me invest karna pda hai.
Means, for each and every bridge, tunnel and station, first a road to site was constructed, then big land filling for factory shades done, then huge work-shops were set up. Also, workers quarters, canteens, management offices, officers' chambers and rest houses were made. Big fields for raw materials, equipment and machines were prepared. Simultaneously, power lines and mobile connectivity were established. Facilities for security and medical support were also prepared. All types of work force were hired and trained on site and off site and even at other places (like Konkan region) all along this time.
After all these huge works done, then the very first step towards "main construction" was initiated.
Just imagine how gigantic this whole project has been.
Nice video aap ki video dekh kar acha lagta hai kyuki aaki Jayda video knowledge base hoti hai
Bilal Sir ji aur Mona madam ji ko mera Dil se Assalamu alaikum wa rahmatullahi wa barakatuhu
Walaikam Salaam ❤❤
And we don't need Chinese help to do these high tech engineering projects 😉... Salute to our scientists, engineers and of course our workers who make these kind of projects a reality 🙏🇮🇳
We do acknowledge that in our every video.
Engineering marvel bhai
oh yes , by all means 👍
Please react to W.i.S.H Boom Boom Song. W.i.S.H. is an Indian pop girl group. The group consists of four members: Ri (Riya Duggal), Sim (Simran Duggal), Zo (Zoe Siddharth) and Suchi (Suchita Shirk)