Turnaround: Spring cleaning at the Schwechat Refinery 2016

Поділитися
Вставка
  • Опубліковано 21 сер 2016
  • OMV Blog: blog.omv.com/en/inspection-sch...
    The Schwechat Refinery turned 58 in April, making it a plant in the prime of its life. It goes without saying that regular medical check-ups are always a good idea; for refineries a so-called “turnaround” is mandatory once every six years. It also has enormous dimensions: 3,180 people joined in to dismantle, clean, maintain, repair and then rebuild it all back together in the end.
    In the past people used to refer to the inspection weeks as a standstill, but this term doesn’t quite seem to fit when you look at today’s agenda: In these four weeks more than 306 tonnes of steel will be processed and inspections carried out on 480 heat exchangers, 16 furnaces, 510 containers and 2,677 valves, in addition to replacing more than 12,6 kilometers of pipes. The greatest challenge this time around is on the distillation plant.
    One down, one to go - and so the preparations for the next round are already underway in the Schwechat Refinery. After all, only half of the refinery was inspected this year, namely the part that is responsible for producing fuels - the petrochemicals units will follow in 2017.
    --- Note: As of June 13, 2017 Petrol Ofisi A.S. is no longer part of OMV Group.
    ------------------------------------------------------------
    Subscribe to the OMV UA-cam Channel: / omv
    Follow our Blog: blog.omv.com
    Follow us on LinkedIn: / omv
    Follow us on Twitter: / omv
    Follow us on XING: www.xing.com/company/omv
    Follow us on Facebook: www.omv.com/portal/01/com/face...
  • Наука та технологія

КОМЕНТАРІ • 8

  • @purnimakashyap3129
    @purnimakashyap3129 11 місяців тому +1

    EOT cranes and hoists are a big surprises in Turnarounds. Many are not (or cannot be) operated during the regular plant operation and when required after 5-7years of inoperation.. are discovered just konked off...(broken or siezed)....
    Best way is to
    -have an audit and rehearsal of all the hoists..(atleast 6months to 1 years in advance)
    - greasing & minimum operation (required to keep healthy)
    -keep all the spares for
    1- minimum 2- maximum overhaul

  • @flailios
    @flailios 6 років тому

    What a high-paced shut!

  • @Faizu-pb3te
    @Faizu-pb3te 3 роки тому

    Plz provide English captions

    • @omv
      @omv  3 роки тому

      Hello, thank you for your comment. The text in the video all have English subtitles.

    • @abdusameaksheer2124
      @abdusameaksheer2124 3 роки тому

      @@omv contractors name pls

    • @mckessa17
      @mckessa17 Рік тому

      Canada has very few refineries left, they closed most of them.