Bro listen there are lots of people on UA-cam and tweeter and other social media platforms who says lot's of things just don't pay attention to them. Cuz paying attention proves their point.
Agar mla aur mp bjp ke honge jidhar yeh kaam ho raha hai , toh speed bahut fast hogi kyunki permission leni nhi padegi kisi bhi cheez ki . Aur state mai khaas karke maharashtra mai sarkar nhi badalni chahie, ho sake toh bjp ko majority mai lao mh mai . Tab jaake 2028 tak pura kaam ho sakta hai, my request to voter pls vote to bjp for development. Mai bjp ka supporter nhi hu , bas practically bol raha hu
@@AJAYKUMARSingh-hx7wysurat se billimora ke bich viaduct complete ho gya h . Thoda sa eh gya h .. dono station almost complete hone ko h . Baki track ka kam start ho gya h . Surat maintenance depo ka kam piche h .
मजा तो इस बात का है कि ये रूट की बुलेट ट्रेन में सबसे ज्यादा गुजरात के लोग ही आने जाने वाले हैं!!! ये ही वजह हे की ये रूट सब से पहले चुना गया हे। गुजरात की जनता सफर करने को सबसे ज्यादा तैयार होती हे।
There should east west corridor as well with expressway n bullet train starts from dwarka-rajkot-ahm-dahod-godhra-indore-bhopal-jabalpur-ranchi-jamshedpur-kharagpur-kolkata also name as capitals expressway/bullettrain imagine connectivity of both ports to central india
@@ridhamgandhi8135 US Amtrak running 230 km/hr from 1986.. German bullet train(deutchbahn ICE) use American made transformer, filter, most traction equipment invented and designed by US scientist .. it just sad their petrol & aviation lobby didn't want hsr to happen .. while German(siemens) France(Alstom) Spain UK researching on Bullet train US was building Fighterjet like madman and literally playing with all type of supersonic & stealth airframe design Meanwhile We Indians using 1960 made Alcos and all our Disel Engines are us made EMD design and Gaaanddu dehati Indians laughing on US while we don't invent any of this shiiyt
In the next phases, it’s Better to go for: 1. At grade tracks in rural/ sparsely populated areas and; 2. Overhead/ underground tracks in cities. This is too slow & too expensive!
at grade level here ???? not possible even in rural areas. its out of the question so dont even mention such things. its always going to be overhead or underground. too many risks at grade levels.
Bullet trains need very flat ground to operate properly. Earthwork alone in challenging terrains will cost more than building piers not to mention entire line has to be fenced at grade tracks
Mujhe lga Ahmedabad me to ab tk ban bhi gya hoga sb at least 2 station complete krke to start kr dena tha ab tk jgh jgh patches me bna kr ky hi mtlb ho rha h
Nah itna jaldi nahi hota covid aya ush vajese nahi chalu kar paye fir maharastra ki government land aquizition nahi karne diya. Lekin ab sab kuch hochuka he aur sirf kam peh focus karna he😊
Cheapest #third AC fare between Mumbai - Ahmedabad - ₹825, #Second AC - ₹1155. #Sinkansen standard class fare should be 2X of #third AC of IR that is ₹1650 & Executive class fare should be 2.5X of #Second AC that is ₹2888. Fare is se jaada hua toh #Success muskil hai
Most metro running in losses ..but can you deny its importance ? nobody measures success of mass transportation infra project on shear basis of profit loss..
They should start other routes as well atleast land acquisition n hope next line be mumbai-pune-kolhapur-belgavi-(*if add panji it would be great)-hubbali-mysore-bangalore-chennai and second ahm-himmatnagar-udaipur-jaipur-delhi
Good for middle class as it will be easier for them to move from one place to other and they won't have to leave their home as they can go and come back from duty .We should have more high speed trains.Working class will be benefitted a lot.We should have high sowed trains as many as possible.
Kindly make the gujrat stretch 1st as if there is change in maharashtra govt. Thy will definitely stop the progressive work. 269 km is in Gujrat only. Or agar inhone waha roki to saaf Sandesh jayega jnta ko ki kaam kon rokta hai.
Ha but abhi nhi Kyoki bullet train ki technology hmare engineers ke liye puri alien technology h jese vande Bharat thi phle ke liye Jb ekbar bn jayega TB yh km time lega@@Maratha382
Bullet train project is not a halua , we have to study about the feasibility of the route and this route is not feasible and also it is also very costly, if profit is not gained by the route it will have a major effect on the country's economy
We don't require such projects....Instead this money should be used in Maintenance money for Unemployed graduates !! Soon BJ party will be thrown out in Maharashtra also and these insance projects would be stopped ...Money should be spent where it is required !!
LOL! Check how slow "developed" country USA is working on its California High speed rail. They do not even have a deadline because they do not know where the funds are going to come from.
Our HSR corridor is on 100% viaduct and is 100% ballast less with J-Slab tracks. Completely different from China which is using ballasts and convention tracks. Our HSR would have higher frequency than China because less requirement of maintenance and Inspection. We have also build 1000+ KM of DFC using conventional tracks and ballast base. Therefore understand the difference first. If we had build this the way china have build this corridor would be opened in couple of years.
All my taxes going to NorthIndia... How long Tamilnadu gonna feed this NorthIndia? I don't know. Don't you guys feel ashamed of using our money? Earn and eat. You guys are eating our sweat. the reason I'm angry, Tamilnadu gets zero development from Central.
In which year construction started? Around 2021-22, so dear this project will at least take 7-8 years for completion. If you have some magic wand, our country will be delighted to have it. Plus you know more than top class engineers who have more knowledge about Indian climate, geography and technical knowledge. Why are you here, go there and help show your extraordinary skills buddy😊
Proud to be part Of this project
Eagerly waiting yar..
Lucky generation witnessing great revolution..❤ jay hind jay Maharashtra..
can bjp win mahararastra state elections?
@@praneethjayasimha5943 yes as of for now bjp seems strong in maharashtra
@@praneethjayasimha5943 yeah BJP most probably will win
Jarman shepherd - Do we really need this
I think there is not stop at kheda
Bro listen there are lots of people on UA-cam and tweeter and other social media platforms who says lot's of things just don't pay attention to them. Cuz paying attention proves their point.
Bihar mein bridge gir gaya ye bhi na gir jaaye.
@@djpgbcollection Bhai Nitish Kumar Nahi Hai Gujarat Mei Garibo!
He be like- do we actually need developments in your country 😂😂😂
Was eagerly waiting for the update
Good hard work National High Speed Rail Corporation Ltd ❤😊❤2026
New India will look good with bullet train.
Agar mla aur mp bjp ke honge jidhar yeh kaam ho raha hai , toh speed bahut fast hogi kyunki permission leni nhi padegi kisi bhi cheez ki . Aur state mai khaas karke maharashtra mai sarkar nhi badalni chahie, ho sake toh bjp ko majority mai lao mh mai . Tab jaake 2028 tak pura kaam ho sakta hai, my request to voter pls vote to bjp for development.
Mai bjp ka supporter nhi hu , bas practically bol raha hu
Yes you are right
But pehle bjp yuvayo ko rojgar de aur paper leaks na kare jisse youth bhi bjp ko vote karenge, jo ki sabse jayada taadaat mai hai
No more delays please
convince congress voters in your area to support bjp and bullet train.
Its already 4 yrs when work started, but still constr speed is slow. How we will construct 2000-3000km more lines in 5-10yrs
Wow two new FSLG nice 👍👍
Ab lagta hai 2027 k deadline tak mein ban jayega .
29 se pehle koi haal mein nahi bnega
@@AJAYKUMARSingh-hx7wyYeh dekho, aa gaya kutta bhoukne
@@AJAYKUMARSingh-hx7wyNo 50% of the work is already completed so 2027-28 timeline is very realistic
@@AJAYKUMARSingh-hx7wysurat se billimora ke bich viaduct complete ho gya h . Thoda sa eh gya h .. dono station almost complete hone ko h . Baki track ka kam start ho gya h . Surat maintenance depo ka kam piche h .
@@AJAYKUMARSingh-hx7wy vapi to Ahemdabad ban jayega Bhai
Connectivity is key to success . Congress should have brought bullet train in 1990 but they did nothing.No plan
Jahapar japan mein 1960s me aagaya tha
मजा तो इस बात का है कि ये रूट की बुलेट ट्रेन में सबसे ज्यादा गुजरात के लोग ही आने जाने वाले हैं!!! ये ही वजह हे की ये रूट सब से पहले चुना गया हे। गुजरात की जनता सफर करने को सबसे ज्यादा तैयार होती हे।
Keep it up Team Bullet Train .... very soon in 2026 i will be travelling in bullet Train
Proud to be part of this💪
Great work
Ahmedabad to delhi
Bhi
Now work should be done
Ground level
They are fooling people only
@@AJAYKUMARSingh-hx7wyHow??
@@UtkarshThakur-bx4oj By not listening to dhruv rathee and not making mumbai to delhi cycling tracks.
@@shreyasbinjrajka7220 lol
@@shreyasbinjrajka7220😂😂😂
WE SHOULD COMPLETE BULLET TRAIN WORK ON MISSION MODE IF WE WANT TO BE SUPER POWER UP TO 2047
Please complete this full stretch before upcoming Assembly Elections of Maharashtra 😢😢😢😢
Udhavan ayega to stop karega
Land acquisition is done, they can't stop it now
Great bharat great infrastructure 🙏🙏🙏🇮🇳🇮🇳
Thanks 😍
There should east west corridor as well with expressway n bullet train starts from dwarka-rajkot-ahm-dahod-godhra-indore-bhopal-jabalpur-ranchi-jamshedpur-kharagpur-kolkata also name as capitals expressway/bullettrain imagine connectivity of both ports to central india
Take notice that this is India, not the United States of America.. Hats off to you India.....
Bro they don't even have a bullet train😂 don't over estimate usa
Usa is so 20th century....21st century pinnacle of infrastructure is china,
@@ridhamgandhi8135 and where do you think this project is? No!! Not the United States. It's India!!!
@@ridhamgandhi8135 US Amtrak running 230 km/hr from 1986.. German bullet train(deutchbahn ICE) use American made transformer, filter, most traction equipment invented and designed by US scientist .. it just sad their petrol & aviation lobby didn't want hsr to happen .. while German(siemens) France(Alstom) Spain UK researching on Bullet train US was building Fighterjet like madman and literally playing with all type of supersonic & stealth airframe design
Meanwhile We Indians using 1960 made Alcos and all our Disel Engines are us made EMD design and Gaaanddu dehati Indians laughing on US while we don't invent any of this shiiyt
Jaldi jaldi work complete karo 😊❤
2030
Paisa hai jeb mein
@@djpgbcollection Ky puch liye use paisa rahe na rahe uska bare friend ke liye hai 😂
@@djpgbcollectionBilkul hai 😊
Next line should be from Delhi to Ahmedabad
Bhai kanpur metro per detailed video kab la rahe ho aap
What about trainsets contract??
👏👏👏👏👏
😍😍
Surath to billimora section bullet train construction track bed how many kmph completed pls update sir
How much viaduct&Piers uptill 31st june
Congratulations gujarati people for your bullet train ❤
Maharashtra also
🙏🙏
All over India full speed mein bullet train banao
Koi toh hai jo apna progress update de rha hai?? Isi mai mai khush hu
more than 2 years
Nice Nhsrcl
❤❤
Jaldi banaiye bullet train me baitne ka sapna hai
2026 meh tuh beth payega wait kar 😊
In the next phases, it’s Better to go for:
1. At grade tracks in rural/ sparsely populated areas and;
2. Overhead/ underground tracks in cities.
This is too slow & too expensive!
at grade level here ???? not possible even in rural areas. its out of the question so dont even mention such things. its always going to be overhead or underground. too many risks at grade levels.
We are going to work on some tough terrains after this project and also tough states like UP BIhar with non existent civic sense. Its not possible.
Bullet trains need very flat ground to operate properly.
Earthwork alone in challenging terrains will cost more than building piers not to mention entire line has to be fenced at grade tracks
How much % of total work done?
kab tk completehoga ye
Mujhe lga Ahmedabad me to ab tk ban bhi gya hoga sb at least 2 station complete krke to start kr dena tha ab tk jgh jgh patches me bna kr ky hi mtlb ho rha h
Connect city like Chennai banglore delhi Kolkata indore
Abhi aur kitna time lagega?
Takareeban 8 saal to ho gaya
Agar ye china mein ban raha hota to Kabhi ka ban gaya hota
Nah itna jaldi nahi hota covid aya ush vajese nahi chalu kar paye fir maharastra ki government land aquizition nahi karne diya. Lekin ab sab kuch hochuka he aur sirf kam peh focus karna he😊
bhai yeh japan aur china aur USA main bahut cheeze bahut pehle se ban rahi hai . toh har baat pe yeh china aur japan ka gyaan mat do plz
Cheapest #third AC fare between Mumbai - Ahmedabad - ₹825, #Second AC - ₹1155.
#Sinkansen standard class fare should be 2X of #third AC of IR that is ₹1650 & Executive class fare should be 2.5X of #Second AC that is ₹2888. Fare is se jaada hua toh #Success muskil hai
Kuch farak nhi padta India Wale kahi bhi ghus jayenge ticket ho ya na ho desh ki vikas ke saath logo ka vikas hona bhi jaruri hai
@@Xenomorph6 abe india wale metro mein nahi ghus sakte plane mein nhi ghus sakte, bullet train mein kya ghanta ghusenge kuch bhi mat bak
@@Xenomorph6vai ticket checking system rahega
Tension na lo
Most metro running in losses ..but can you deny its importance ? nobody measures success of mass transportation infra project on shear basis of profit loss..
Very fast work ❤❤
Diamond industry wale me apna office hi bana liye Gujrat me... Mumbai se dependence khtm karne ke liye...
would be nice if you just showed the picture in mumbai. you don't see anything having it move around like this.
Navi Mumbai me koi station nhi hai toh route me Navi Mumbai kyu likha hua hai??
They will be extending to nehru port I presume
Kab tak chalegi ye to bta do 😂
Expensive usless but hope wwe can horn technology and get technology transfer
Extend it to Delhi
It's going to be cheaper than flight ticket or not. That's what matters. Because flight reaches early
chita mat kar jab tak banegi tab tak percapita income india ki bad jaegi kafi
Flights reach early from airport to airport. But what about the time spent getting to airport and inside the airport.
Pls upload dedicated video of adit tunnel and track progress
should they build or keep shooting videos?
Kab chalu hogi
Varsh 2026 ke 15 August sambhaavit woh bhi Surat se Bilimora ke madhya mein.
Aur tezi lao.. jaldi jaldi banana hoga hame,
They should start other routes as well atleast land acquisition n hope next line be mumbai-pune-kolhapur-belgavi-(*if add panji it would be great)-hubbali-mysore-bangalore-chennai and second ahm-himmatnagar-udaipur-jaipur-delhi
mumbai pune ka mushkil hai due to terrain.
Good for middle class as it will be easier for them to move from one place to other and they won't have to leave their home as they can go and come back from duty .We should have more high speed trains.Working class will be benefitted a lot.We should have high sowed trains as many as possible.
Wtf, joke of the year ( good for middle class) 😅. You don't know how costly it will be as compare to normal or vande Bharat train.
@@mr_kishan7822 it may costs more but saves time
Good but speed is very slow
How much time they need to complete
By 2026 for sure go and search why it was delayed and certainly there is no delay now as only construction will be focused
How long of rail has been completed?
~180 km
Sara kaam gujrat me hi ho rha h.
It will be completed after 2028
These trains should travel upwards of 350 kmph atleast then only it's of some use.
Japan max speed 320
Any plan to build cycle track?
Where??
@@tesla9917 someone said we need to build cycle track between Delhi to Mumbai
@@movieclipshindi6515 wtf
2024 main daudegi train
No
Train was supposed to start in 2023 , god knows when total track will be completed. Too much delay.
That delay was because of land acquisition challenges and Covid 19
Work thoda fast karo sir Maharashtra main gov change hote ho ye new government Natak karne lag jani hai
I hope this does not become a boondoggle / white elephant !
Leakage bullet train project coming soon😂😂😂
Is this unidirectional or bidirectional?
Bidirectional
Of course bidirectional why would be it be just one direction?
Aise hi bnega to 5000 km hi banane me 2050 tak ka time lgega
Kindly make the gujrat stretch 1st as if there is change in maharashtra govt. Thy will definitely stop the progressive work. 269 km is in Gujrat only. Or agar inhone waha roki to saaf Sandesh jayega jnta ko ki kaam kon rokta hai.
One line from Mumbai to Kanyakumari via Mangalore and Kochi pls
Impossible. It would required 100 billion dollars and 20 years to complete that route.
@@atharvzemse6599 nothing is impossible
Ha but abhi nhi
Kyoki bullet train ki technology hmare engineers ke liye puri alien technology h jese vande Bharat thi phle ke liye
Jb ekbar bn jayega TB yh km time lega@@Maratha382
Bullet train project is not a halua , we have to study about the feasibility of the route and this route is not feasible and also it is also very costly, if profit is not gained by the route it will have a major effect on the country's economy
@@SumitSingh-kh1xp it is feasible. Western ghats is a high income area with densely populated cities.
Man what is hurry??.....Plz upload slower and longer vidoes . ..❤
インドはムンバイからアーメダバードを5分で飛ぶこの謎ドローンを使うべきだよ😀
Haha 😂
It is a shame as China and Japan have bullet train but we do not have any.BJP IS DOING GREAT WORK
bullet trains will be stopped by kangrez
Delhi to Kolkata
Kolkata to Chennai
Chennai to Bangalore
Bangalore to Mumbai
Thank god BJP has come to power.
This is not right. Build cycling tracks from ahmedabad to mumbai.
BJP means progress and development and startup India
Still can vote Sonia sena
Atleast GUJRAT SECTION should hav been completed by now/
2030 only
@@AJAYKUMARSingh-hx7wy no, before that ho jayega most probably.
@@jaguarunleashed4935 ache speed se 2029 usse pehle nhi honw wala hai
@@AJAYKUMARSingh-hx7wy GJ section ki baat kar raha hu main. 350 kms chalu ho jaigi 2-3 years main. MH section thoda aur time lag sakta hai.
@@AJAYKUMARSingh-hx7wyIn Gujarat 90% of the foundation work is done 60% of the viaduct is also done with stations also being done so 2026 be it
Same video every month
We don't require such projects....Instead this money should be used in Maintenance money for Unemployed graduates !! Soon BJ party will be thrown out in Maharashtra also and these insance projects would be stopped ...Money should be spent where it is required !!
Pov: You are a German shepherd fan or pappu supporter
Not enough tbh
Bhai kon videographer and editor hai, kitna bekar video banaya hai, isse accha @droneman ya @powertrain ko bol dena tha vo accha video nikal dete
Haan droneman and detox traveller are good with videos
272 km viaduct completed.
Bhag😂 last month 170 tha , 272 kese ho gaya
it's slow, not like developed countries, will take another 2 or more to complete
LOL your so called developed countries coudnt even finish their high speed rail projects.
LOL! Check how slow "developed" country USA is working on its California High speed rail. They do not even have a deadline because they do not know where the funds are going to come from.
UK ka high speed 2 2017 se ban raha abhi tak bana nahi hai sayad 2029 mai banega deadline k hisab se so called developed country mein
Lol are we a fking developed country? Or a one party state like China? 😀
@@arpan9937none we are india similar to Japan from 60s
Slow work
Slow hai kam chaina 10 sal me 10 hajar kilomiter bana rahe hai hamare des me koi technology ka use hi nai karte slow hi use kar rahe hai
Only if this project started 20 years ago..ham v aaj bullet train technology me master kar
Iiye hote
china me land acquisition nhi krna padta
Our HSR corridor is on 100% viaduct and is 100% ballast less with J-Slab tracks. Completely different from China which is using ballasts and convention tracks. Our HSR would have higher frequency than China because less requirement of maintenance and Inspection. We have also build 1000+ KM of DFC using conventional tracks and ballast base. Therefore understand the difference first. If we had build this the way china have build this corridor would be opened in couple of years.
@@atharvzemse6599 dont try Explaining these things to such people. Unke samaj se bahar hai yeh sab technical cheeze.
hamare desh ke log apni jammen aasani se nahi dete, jayada time is liye lagta hai
Very slow on the bridges. Pathetic. Waiting for 2029 now
200-500YRS लागतिल प्रोजेक्ट ओपनिंग 😂😂😂🤣🤣🤣😡😡😡🤮🤮🤮👎👎👎
कितना कर्ज लिया है । जापान से ये ड्रामा बाजि के लिये 🤔
Tereko kya? Tu toh hamare tax ke paise par pal raha hai
Chinese can complete these type of projects in 1 year😂.
No progress
All my taxes going to NorthIndia... How long Tamilnadu gonna feed this NorthIndia? I don't know. Don't you guys feel ashamed of using our money? Earn and eat. You guys are eating our sweat. the reason I'm angry, Tamilnadu gets zero development from Central.
stfu abdul .. maharashtra pays 4 times more tax than any state
Calm down Abdul you aren't paying taxes
Average Indi alliance supporter 😁
2035 tak complete ho jayeg Kya
2030 मैं जाकर पूरा होगा 😂
Aisa aapko kyu lagta hain
@@parthkatkhede7772 इसलिए क्योंकि काम बहुत धीरे हो रहा है
2028
@@chandanmishra82112029 at high speed otherwise 2030
In which year construction started? Around 2021-22, so dear this project will at least take 7-8 years for completion. If you have some magic wand, our country will be delighted to have it. Plus you know more than top class engineers who have more knowledge about Indian climate, geography and technical knowledge. Why are you here, go there and help show your extraordinary skills buddy😊