Melton level crossing removals final designs

Поділитися
Вставка
  • Опубліковано 13 січ 2025

КОМЕНТАРІ • 43

  • @JuliansTrainsandGames
    @JuliansTrainsandGames 3 місяці тому +4

    Are 4 platforms foreshadowing the Melton electrification.

  • @TurquoisechannelYT
    @TurquoisechannelYT 5 днів тому

    It’s a shame they’re not retaining the old 1898 Station building at Melton 😔

  • @फ़्लेमरोफ़ायरपॉपकॉर्नबम्बर्स

    I think the first 4 platform skyrail? 🌌 🚆 😊

  • @kirbyman6682
    @kirbyman6682 3 місяці тому +3

    4 platform skyrail 😮 Will you electrify it though?

    • @ChannelReuploads9451
      @ChannelReuploads9451 Місяць тому +1

      Apparently electrification comes after the opening of the Metro Tunnel. The first stage was Dual track, which was done

  • @mathewferstl7042
    @mathewferstl7042 3 місяці тому +3

    First 4 platfrom skyrail?

  • @yar1
    @yar1 3 місяці тому +3

    Needs grade separated terminations 😵‍💫

    • @GabrielBrady
      @GabrielBrady 3 місяці тому

      What I can't believe is a single lane in each direction on the Ferris Road bridge. I put it in as a public submission. With that being the main road from the new Melton Hospital to Melton itself, and with how large Atherston is becoming, a single lane either direction is going to result in someone dying in an Ambulance on the way to emergency or with someone dying because an Ambulance is stuck on the Ferris Road Bridge. At least they won't die because the level crossing was down I guess. Cobblebank Station should have been trenched to begin with. Extremely shortsighted planning going around this part of Melton. I'd give this bridge 15 years max before it has to be upgraded.

  • @TurquoisechannelshortsYT
    @TurquoisechannelshortsYT 3 місяці тому +4

    It’s disappointing that you guys didn’t keep the old station building (it was built back in the 1898 and should have some historical significance)

    • @aquacactuscheeseburger
      @aquacactuscheeseburger 3 місяці тому +1

      The original portable structure has had so many additions tacked on that its not really movable :(
      Theres one other like this out near the SA border but IIRC its not in good condition

    • @babyboomertwerkteam5662
      @babyboomertwerkteam5662 3 місяці тому +1

      The current station building doesn't have any historic significance at all, it's just a plain old weatherboard building. Remember when it used to have a small cafe inside it though?

    • @mathewho9796
      @mathewho9796 3 місяці тому

      Well, I assume they might move the building somewhere else (maybe within the station) just like they did with Clayton

    • @Hoponmyback1986
      @Hoponmyback1986 2 місяці тому

      No one cares

    • @TurquoisechannelYT
      @TurquoisechannelYT 5 днів тому

      @@Hoponmyback1986bro why are you hating?

  • @Gamer-zz7iq
    @Gamer-zz7iq 3 місяці тому

    After the melton line is level crossing free and melton station gets the extra tracks will electric trains finally come to the melton line?

    • @Hoponmyback1986
      @Hoponmyback1986 3 місяці тому

      NO😡

    • @Gamer-zz7iq
      @Gamer-zz7iq 3 місяці тому

      @@Hoponmyback1986 💀

    • @babyboomertwerkteam5662
      @babyboomertwerkteam5662 3 місяці тому

      No, but 9-carriage VLocity trains are in the plans, which address some of the overcrowding problem. Hopefully they run more than what Wyndham Vale gets, though.

  • @फ़्लेमरोफ़ायरपॉपकॉर्नबम्बर्स

    This will happen in 2026, I AM STILL WATING FOR 2026! SAY GOODBYE TO 4 Level crossing Coburns road Exford road Hopkins road Ferris road level crossing
    👇
    👇

  • @calspi7772
    @calspi7772 2 місяці тому

    Shame the government sidelined the electrification, would do wonders for capacity on Ballarat bound trains from the city. Hopefully the 4 track station means plans are in place to electrify still.

  • @Fireandicegamerx
    @Fireandicegamerx 3 місяці тому

    Are they starting works now? Or when are they?

    • @levelcrossings
      @levelcrossings  3 місяці тому

      Thanks for the question. You'll begin to see more construction workers and vehicles in the area as we move towards major construction starting this year. We'll provide more information ahead of any works beginning.
      If you haven't already, you can stay up to date on the project and construction announcements by signing up to email updates at levelcrossings.vic.gov.au/subscribe and selecting the Melton level crossings.

    • @Hoponmyback1986
      @Hoponmyback1986 2 місяці тому

      ​@@levelcrossingswhy can't they do it in 2026

  • @woodman981
    @woodman981 2 місяці тому +2

    Not a fan. Prefer the old building. You should be incorporating the 18th century building within the new station like with ballan and bacchus marsh. I understand the need for a new station, but i dont appreciate how you're willing to sacrifise the loss of a part (no matter how small) of Australian history in order to do this. Considering that the new building doesnt seem to match the spirit of the original.. could be worth having another think about your plan.

    • @TurquoisechannelYT
      @TurquoisechannelYT 5 днів тому

      Honestly can relate with this I don’t know why they didn’t retain it. The building is massive and very grand. In my opinion, I think it’s a massive loss. (although that’s probably just my train loving autism brain speaking)

  • @EbaadSyed
    @EbaadSyed 3 місяці тому +2

    VicGov will do this but won’t electrify it 😂😂😂