Water curing of concrete roof slab
Вставка
- Опубліковано 8 вер 2024
- It should be cured at least for 7 days. the more frequently you cure it daily the more reduction in heat of hydration process avoiding micro cracks inside cement sand particles. if the surrounding temperature is low then it will require less curing if the plaster work is done in hot climate area then it should be cured frequently every day.
Normally small grid portion are made with the help of sand and water is filled inside these grid portion to insure longer curing.
plz tell acc gold cement slab ki kitne din water curing kare …bcoz cement is waterproof????
Drowining in water for 24 hr or once in the day
After concrete when will water fill on
Next day... Before that we can spray water
Thank you