Normal Concrete Mix Design based on DOE Method - Unrestricted Design

Поділитися
Вставка
  • Опубліковано 2 лис 2024

КОМЕНТАРІ • 15

  • @odysseusrobert6615
    @odysseusrobert6615 3 роки тому +2

    Hi miss, may I know if there is any possible way for me to get this complete standards of the book Design of normal concrete 2nd edition?

  • @theotema2053
    @theotema2053 Рік тому

    What if we have both uncrushed and crushed aggregate in 1.6? Do we assume 2.65 or just take 2.6/2.7?

  • @dineshedirisooriya1992
    @dineshedirisooriya1992 3 роки тому

    Thank you. Very important sharing.

  • @acaphesmes3079
    @acaphesmes3079 2 роки тому

    macam kenal suara ni hehehe Dr. ajar subject structure design

  • @khalidali3141
    @khalidali3141 2 роки тому

    Mam what if, maximum size of coarse aggregate is 13mm rather than 20 mm, then how can we determine the free content ,as in the maximum size of caorse aggregates are 10mm,20mm,40mm, plz guide me i'm so confused 😕

  • @izmihaikal1898
    @izmihaikal1898 3 роки тому

    what if the cement content is larger than both maximum and minimum? 17:57

    • @structureandmaterialincivi5611
      @structureandmaterialincivi5611  3 роки тому

      If the cement content calculated using equation C3 is larger than maximum cement content and minimum cement content, it is thus impossible to continue the mix design. Amendment need to be done by change the type of cement or cement strength class or both.

  • @16jaaroudmeisje19
    @16jaaroudmeisje19 3 роки тому

    bien hecho

  • @fahmieffendi2901
    @fahmieffendi2901 3 роки тому

    what does mean of unrestricted design?

  • @enghassan1405
    @enghassan1405 3 роки тому

    Thank you

  • @aziemullahumar6511
    @aziemullahumar6511 3 роки тому

    what if data didn't give the min cement data and the 3.1 is larger

    • @structureandmaterialincivi5611
      @structureandmaterialincivi5611  3 роки тому

      1. If cement content in 3.1 larger than maximum cement content (item 3.2), you can't proceed the design.
      2. If cement content in 3.1 less than minimum cement content (item 3.3)., use 3.3
      3. If there is no data for item 3.3, you may proceed with calculated cement content as in 3.1