Politics aside, do not underestimate the amount of engineering that has gone into building this airport. Hats off to all the engineers involved in making this possible. This was not a typical location for an airport, and the project management and engineers overcame many challenges to get this done. I salute the engineers for their hard work on this project. Thany you droneman for such iconic videos.
@@darbanmaul3605political support ke bina wp engineers projects site pe entry pe nahi mar sakte hai. Thanks to Deva Bahu for making this project possible.
Well Captured. Waiting for it. I captured Sukhoi - 30 from my Bungalow Terrace. It was roaring. I thought some Passenger plane is passing at lower altitude. So is the sound. Because every morning around 7.30am passenger planes pass by for landing. As my house comes on the path of descending. Later on when went on to terrace to check, as it was sounding continuously, to find out that it was Fighter Jet Sukhoi - 30. Though i thought it is MiG 21. But thanx to you who updated me with right name of Fighter Jet.
Devendra fadnvis the man of developing महाराष्ट्र.. truely we Maharashtrians are blessed to have visionary leadership like Deva Bhau 💥.. Maharashtra will be first developed state in INDIA in upcoming 5 year's if Deva Bhau's vision will take Maharashtra.. Jay hind Jay Maharashtra 🚩
People can easily download this video without logo and claim it to be theirs. It is necessary for him to have his logo on the video because it is his hard work and credits for this video should go to him.
Thanks BJP and Thanks Eknath ji, MVA, guys please ensure you convince everyone around you to vote for Maha Yuti only, citing the development taken place and disastrous MVA rule .
Waiting fir mumbai metro series and smaruddhi amne connector.. Yeh baki landing aur baki hota rahega bhai.. Tumhara fan base kya chahta he ye bhi dekho jara
Guwahati City Should Get Second Airport Like Navi Mumbai Airport Reason Guwahati Have Single RunWay Like Mumbai Airport Accident Can Happen In Future With Single RunWay So Guwahati Second Airport Have Double RunWay
Flying past does not add anything at all. Tell us more about what is happening and what new inventions are made to solve problems as they arise. That would be more educative and can show our engineers are dealing with problems competitively.
It won't happen by March 2025. Even a simple metro station (elevated or underground) takes over 1 year for interior work, finishing, electricals and electronics after the civil construction is completed. And this is an international airport terminal - far more complex with multiple layers of construction - underground, on the ground and elevated - with plumbing, electricals, HVAC, fire and safety, electronics, security and tech systems besides avionics and technical equipment necessary for a fully functioning airport. It will take at least 1 to 2 years for all the work to get completed, audited, tested, QA certified and checked before opening it for any kind of air service - cargo or commercial. Even if civil work gets completed by March or December 2025, interior, systems and installation of all equipment necessary for a fully functioning airport terminal will take at least 2026 to 2027 even if they work 24/7. Don't believe the govt jumlas on the inauguration by March 2025, and you won't get disappointed.
Hello all its private airport not govt, government stake is near to 3% 😅 please don't call government project, land aslo not government owners, government role only release the different approval, even no any income will go into government mony box except GST, why tu tagging it government project 😅
@@amplify564 Mumbai is getting ready for 3 rd airport announcement at. Dapchari, Dahanu location. Since there are 2 major ports ( Vadhavan + murbe ) lined up to support for cargo and ever growing tourism in the region . Air and flight traffic diversion ✈️
We Indians are smart when it comes to loyalty. We try to clinch every facility from BJP Government and vote for other Government and show our real character. Example Karnataka and Jammu and Kashmir.
Politics aside, do not underestimate the amount of engineering that has gone into building this airport. Hats off to all the engineers involved in making this possible. This was not a typical location for an airport, and the project management and engineers overcame many challenges to get this done. I salute the engineers for their hard work on this project.
Thany you droneman for such iconic videos.
Absolutely Number One Video ❤😍😍😍
सुखोई विमान को उडता हुआ देखकर गर्व से सीना चौड़ा हो गया। Devendra fadnavis is the visionary leader of Maharashtra
All credit goes to engineers and labours not to politicians
@@darbanmaul3605political support ke bina wp engineers projects site pe entry pe nahi mar sakte hai. Thanks to Deva Bahu for making this project possible.
@@libshastra kuch lena dena nahi hai unpadh deva bhau ka isme aviation ministry ka role hai
@@darbanmaul3605ha to fir uddhav ki govt me stay kyu laga diya tha( even before COVID)
@@darbanmaul3605 आपकी बात बहस के लिए एक हद तक ठीक है लेकिन अच्छे विजनरी लीडर ही नहीं होंगे सिर्फ अच्छे इंजीनियर क्या कर सकते हैं?
Sukhoi short is to good 😍😍
After years of long wait
It is finally happening ❤
Well Captured. Waiting for it.
I captured Sukhoi - 30 from my Bungalow Terrace. It was roaring. I thought some Passenger plane is passing at lower altitude. So is the sound. Because every morning around 7.30am passenger planes pass by for landing. As my house comes on the path of descending.
Later on when went on to terrace to check, as it was sounding continuously, to find out that it was Fighter Jet Sukhoi - 30. Though i thought it is MiG 21. But thanx to you who updated me with right name of Fighter Jet.
Woahhh that's great, btw SuMki 30 sounds more deafening than Mig21 (which I guess we have decommissioned them)
Devendra fadnvis the man of developing महाराष्ट्र.. truely we Maharashtrians are blessed to have visionary leadership like Deva Bhau 💥.. Maharashtra will be first developed state in INDIA in upcoming 5 year's if Deva Bhau's vision will take Maharashtra.. Jay hind Jay Maharashtra 🚩
Fir bi majority nahi milti Maharashtra mai bjp ko
UBT. Congress and NCP meanwhile famous for stalling projects with anti development agenda
टरबुज्या काही कामाचा नाही 🍉🍉🍉
Achha baki sb ghas chhil rhe hai😂😂
Very true. He must be the next CM with support from all.
Drone Bhai ❤
D.B.Patil International Airport
Mention
Ratan Tata International Airport 🔥🔥 We want this name.
@@shan25873 do you know dinkar Balu patil
@@shan25873D B patil is legally sanctioned now its tough to change ahead of election in maharashtra.
@@shan25873 Aaaja try karle... only D B patil hi naam rahey ga.
@@shan25873 Well more than 20 years ago DP patel had vision for the land we call as Navi Mumbai. I think his name on the airport is quite fitting.
I saw this fighter jet (sukhoi 30) fly above my terrace and my god it was really loud 🥶
GOOSEBUMPS 😍
1:05 You can see, an Iegall dargh has been built over the hill
Name the new airport in the name of RATAN TATA
No. It is already decided to name it D B Patil Navi Mumbai International Airport.
Better Option is to name Pune Airport.
Don't worry. Mumbai Metropolitan Region will soon need a third international airport.
Name that one as Ratan Tata International Airport.
where u you from ?????????
As always beautiful visuals 😊
When its going to start for Normal people... Domestic as well as International Flights?
March 2025
@@harshh._ Thats Great!
That your logo on screen is distracting video content..just one observation..otherwise video is awesome 🙌
People can easily download this video without logo and claim it to be theirs. It is necessary for him to have his logo on the video because it is his hard work and credits for this video should go to him.
@@mayanktaksande3693yes.
Thanks BJP and Thanks Eknath ji, MVA, guys please ensure you convince everyone around you to vote for Maha Yuti only, citing the development taken place and disastrous MVA rule .
Thanks to Deva Bhau
गद्दारांना क्षमा नाही
Congratulations 👏👏
Waiting fir mumbai metro series and smaruddhi amne connector.. Yeh baki landing aur baki hota rahega bhai.. Tumhara fan base kya chahta he ye bhi dekho jara
hi, can i share this video link on my real estate project website ?
Sir please cover Pune metro
why sukhoi flying with landing gear open ???
Wo 😃😃😃😃🎉
Ready to production C-295 at vadodara
Droneman whenever you upload video regarding this airport please mention full name of airport i.e D.B.Patil international airport 🙏
Don't put your logo in middle of the screen. Move it.
Sir ratan tata new mumbai international airport ✈️
The government already agreed to name it D.B Patil international airport
D B patil Navi Mumbai international airport..
droneman
Mai rafael utarunga apna is runway pr
Purandar airport ka update ...🙏
Today not "Droneman" but "Groundman"
:P
No fly zone ban jayega ye area soon.
Guwahati City Should Get Second Airport Like Navi Mumbai Airport Reason Guwahati Have Single RunWay Like Mumbai Airport Accident Can Happen In Future With Single RunWay So Guwahati Second Airport Have Double RunWay
Flying past does not add anything at all. Tell us more about what is happening and what new inventions are made to solve problems as they arise. That would be more educative and can show our engineers are dealing with problems competitively.
❤
Supposed to open February or March 2025 according to articles i read but it still looks like this how can it open in 4 months?
It won't happen by March 2025.
Even a simple metro station (elevated or underground) takes over 1 year for interior work, finishing, electricals and electronics after the civil construction is completed.
And this is an international airport terminal - far more complex with multiple layers of construction - underground, on the ground and elevated - with plumbing, electricals, HVAC, fire and safety, electronics, security and tech systems besides avionics and technical equipment necessary for a fully functioning airport. It will take at least 1 to 2 years for all the work to get completed, audited, tested, QA certified and checked before opening it for any kind of air service - cargo or commercial.
Even if civil work gets completed by March or December 2025, interior, systems and installation of all equipment necessary for a fully functioning airport terminal will take at least 2026 to 2027 even if they work 24/7.
Don't believe the govt jumlas on the inauguration by March 2025, and you won't get disappointed.
Kalyan already have airstrip of world war but no airport
Whats the point of this landing? The airport seems to still be at least 1 year away from completion, which means 3 years by maharashtra standards.
Testings maybe , protocols maybe, to give feedback
march 2025 it will start
We would have loved the original sound than the stupid music in the background!
Maharashtra ka kayal kalp ho raha hai
This video is a waste of time. No worthwhile information
Hello all its private airport not govt, government stake is near to 3% 😅 please don't call government project, land aslo not government owners, government role only release the different approval, even no any income will go into government mony box except GST, why tu tagging it government project 😅
26% stake is owed by Cidco
@@amplify564
Mumbai is getting ready for 3 rd airport announcement at. Dapchari, Dahanu location.
Since there are 2 major ports ( Vadhavan + murbe ) lined up to support for cargo and ever growing tourism in the region .
Air and flight traffic diversion ✈️
We Indians are smart when it comes to loyalty. We try to clinch every facility from BJP Government and vote for other Government and show our real character. Example Karnataka and Jammu and Kashmir.