    TLDR: Labor costs in construction estimating are determined by factors such as crew size, productivity, and resources, and must be carefully considered to ensure profitability and efficiency.
    00:00 💡 Labor costs are the cost of installing or performing a task based on hourly rate and productivity, not including overhead costs.
    00:44 💡 Labor costs for estimates include hourly rates, crew size, productivity, and resources, which all contribute to the total overall cost of labor.
    01:16 💰 A journeyman can frame 150 linear feet of wall in 8 hours, costing $2.67 per linear foot, and labor resources have different hourly rates.
    01:53 💡 Labor costs are calculated based on the specific task and the number of resources required, resulting in a total hourly rate for the project.
    02:44 💡 Crew size and composition can impact profitability and efficiency in construction estimating, with some tasks requiring specific crew sizes and combinations of resources.
    03:20 👷‍♂ Balance the number of installers to avoid congestion and ensure proper installation.
    03:42 ⚒ Labor costs depend on crew size, time constraints, and work hours, all of which must be considered when estimating construction labor costs.