Is test se pile ka pura kaam honeke baad pile ka steel,liner, concrete kitna depth gaya hai and concrete konsa grade hai, pata chalega kya? Agar nahi to uske liye konsa test ya check karaane ka tarika hai?Pls reply
The PIT should be performed no sooner than 7 days after casting or after concrete strength achieves at least 3/4 of its design strength, whichever occurs earlier.
No, pile integrity testing (PIT) cannot directly measure the depth of a pile. PIT is a non-destructive testing method that is used to assess the integrity of a pile by analyzing its response to an impact or vibration. The information obtained from a PIT can provide useful information about the structural integrity of the pile, such as the presence of cracks, voids, or other defects. However, to determine the depth of a pile, other methods such as sonic logging or borehole drilling may be required. These methods involve the use of specialized equipment to measure the depth of the pile and the soil conditions surrounding it.
Sir!! The reason I am asking is that Pilling work has already done but I have some doubt about the depth of the pilling work. What should I do to make sure about the depth??
@@utkalkeshariparida1470 if it is very important to check the depth of casted pile at your site then use the method such as sonic logging or borehole drilling as I have already told.
@@AmanSingh-ql3le To PIT ko aap pehle acche se samjh le agar aap test karne jaate hai...Aap PIT se related sabhi question k answer ko prepare kar le...fhir confidence se client ko samjhate.
Extra knowledge: we use PIT-W SOFTWARE to ease the graph, then lab analyst prepare report
Hi, you may make a video on the Topic Why CSL is better over PIT method of Non Destructive Pile Load Testing...
Good work
Very nice explanation, a very good site. Thanks sir
Agar pile kajer khobor nai sir
What is the frequency of the integrity test?
How could the cracking develop before the load application??
Good 👍👍keep uploading & keep sharing such beneficial info with us
Thanx😊
Excellent sir
Thanks
Is test se pile ka pura kaam honeke baad pile ka steel,liner, concrete kitna depth gaya hai and concrete konsa grade hai, pata chalega kya? Agar nahi to uske liye konsa test ya check karaane ka tarika hai?Pls reply
Where u know is pile is buldging... Surface also did not give clear... Just put and test...
Har ek pile ko karana padega ki ek avg. Nos test karana hai?
Sabhi pile test karna hota....high rise building me risk nahi le sakte hai.
Agar pile kajer khobor nai sir
Pile depth integrity test limitations percentage?
Nice sir
Thanx
Please submit the graphics riding of damage pile,neck pile and sound pile.
Agar pile kajer khobor nai sir
Tanks for the upload! :)
Ye global mr Patel hai na
Es test ka equipment lene me kya price aata hai sir
Contact me if you want to buy !!
@@gauravsoni1943 contact number.
Sir ye test ko sikhne ka koi upay hai kya sir aapke pass plz tell me
Isko aap UA-cam ki videos se seekh sakte hai...or acche se seekhne k liye aapko practical karna padega
Sonic logging test ke bare m bhi btaiye
Sure
After the casting of pile kitne din baad ye test krskte hai sir
The PIT should be performed no sooner than 7 days after casting or after concrete strength achieves at least 3/4 of its design strength, whichever occurs earlier.
@@CivilAddaa sir PIT karegato pile mey reinforcement kitna tak geya karke Patachalege kya
Pile kese toda jata he?
hello sir , can this PIT test measure the depth of the pile ?
No, pile integrity testing (PIT) cannot directly measure the depth of a pile. PIT is a non-destructive testing method that is used to assess the integrity of a pile by analyzing its response to an impact or vibration.
The information obtained from a PIT can provide useful information about the structural integrity of the pile, such as the presence of cracks, voids, or other defects. However, to determine the depth of a pile, other methods such as sonic logging or borehole drilling may be required. These methods involve the use of specialized equipment to measure the depth of the pile and the soil conditions surrounding it.
@@CivilAddaa sir , is there any simple method to know the depth of the pile after construction ?
@@utkalkeshariparida1470 No, There is not any simple method in my knowledge to check the depth.
Sir!! The reason I am asking is that Pilling work has already done but I have some doubt about the depth of the pilling work. What should I do to make sure about the depth??
@@utkalkeshariparida1470 if it is very important to check the depth of casted pile at your site then use the method such as sonic logging or borehole drilling as I have already told.
What is the IS code for this?
IS 14893 : 2001
@@CivilAddaa Hi, Can you also tell me the code for GPR (Ground Penetrating radar) Test?
Shoring pile k lye koi test krte h kya sir?
No
Shore pilling is a measure to prevent ground subsidence while excavating for deep foundation of super structure.
@@CivilAddaa ok thanks sir
Sir claint ko handle kaysey kare plz help me sir 🙏🙏🙏
Kis kaam k regarding client ko handle karna chate hai aap??
Sir pit test ke liye claint sabal puchtey hai na satisfied ke liye Mai abhi ak side per pit test ke liye aaya hu
@@AmanSingh-ql3le To PIT ko aap pehle acche se samjh le agar aap test karne jaate hai...Aap PIT se related sabhi question k answer ko prepare kar le...fhir confidence se client ko samjhate.
Sir ak video pit machine ka setting ke uper video banaye Jo pile ka graph bhahut aache se aaye plzz sir .. 🙏🙏
@@AmanSingh-ql3le Ok jaldi hi upload karunga
Please can I have the video in English please
Sure....I'll upload soon.
Kitne ka average lete h...
Minimum 15 baar hammer marna hai woh konse standard me likha
Agar pile kajer khobor nai sir
Please ask in English or Hindi.
@@CivilAddaa tumhara pass koi pile ka karj hai
What is Karj ??