  • @jonorth3160
    @jonorth3160 5 років тому +2

    Hello John this video saved us a $1m bearing replacement on a wind turbine as not enough grease was being pumped into the bearing.
    I owe you a beer!
    Cheers 😘

  • @strohsrawls
    @strohsrawls Місяць тому

    Low level light doesn't come on anymore after I let it stay low for about 1.5 months. Bulb blown or needs calibrated?

  • @waynesimpson2040
    @waynesimpson2040 4 роки тому +2

    That's a nice video explaining the technical aspects and perimeters of this pump on a design level but what about explaining to the average operator how to program it for normal operation. Thank you for your consideration of my suggestion. The video seems to be directed toward fellow engineers and not the general public

    • @lincolnindustrial
      @lincolnindustrial  4 роки тому

      Normal operation varies based on the configuration of each P653s unit and the application it is used. Their are multiple variations with different feature combinations. This video was produced to show every feature available and the process to program each feature.
      ~ John

    • @miguelcervantesmc
      @miguelcervantesmc 2 роки тому

      That’s when you call a technician like me to set it up for for. We get paid the big bucks for a reason

  • @shamunamahamudu679
    @shamunamahamudu679 2 місяці тому

    What type and how many pumping elements can be used?

  • @akeelahmad9748
    @akeelahmad9748 4 роки тому +1

    Good .. job Sir

  • @christianvargas1671
    @christianvargas1671 6 років тому +1

    Hi John do you have video for Pump P401-SSVDV12 on how to install the metering screw?, it looks different from SSVD. The pump arrive with separate metering screw.

    • @lincolnindustrial
      @lincolnindustrial  6 років тому

      Hi Christian, according to the manuals and catalogs, the same metering screws are used between the standard SSVD and the SSVDV divider units. The metering screw is installed on one side center threaded ports to control an outlet pair, the other side must be plugged. We would be happy to send you manuals if needed. for further assistance we would ask that you have any unit part numbers or photos available so we may be able to see what you are seeing. feel free to give our tech group a call at 1-844-772-1341 or email at lincoln.tech.service@skf.com.
      Regards, John L.

    • @christianvargas1671
      @christianvargas1671 6 років тому

      Hi John thanks for the info, maybe my team did it right, they just remove the white plastic cover and put 6 pcs of metering screw (in case of SSVDV12) I ordered 12 pcs I thought it needed for both sides. The exact model is 650-41262-7. The new manual is a bit confusing (951-171-003
      Version 09 14.3 Metering screws for SSVDV metering devices ) compared to old one.

  • @vivekkumardohel9168
    @vivekkumardohel9168 3 роки тому

    Can you explain how we are setting run time for this pump..

    • @lincolnindustrial
      @lincolnindustrial  3 роки тому

      The only time setting manually entered is the pause time. Run time duration is dependent on how long the system takes to build pressure to trip the pressure sensor or transducer.
      ~ John

  • @kenlau4706
    @kenlau4706 5 років тому +1

    Hi John, how about p603s

    • @lincolnindustrial
      @lincolnindustrial  5 років тому +1

      Programming is the same when P603s is configured for timer controller. The 603s has the additional feature of triggering a cycle from a pulse signal rather than a timer. The board would need to have the jumper set to the correct pin setting for this. P1 and P2 screens in this case would set the number of pulses required before board triggers another lubrication cycle.
      ~John

    • @kenlau4706
      @kenlau4706 5 років тому

      @@lincolnindustrial John how to do the additional feature for p603s. What should I do on that trigerring part of the pump. I'm from Philippines and this is a huge help for my project. Thank you John this will be a big help.

    • @lincolnindustrial
      @lincolnindustrial  5 років тому

      Jumper pins will need to be moved on the board itself to activate the pulse feature. This will change P1 to pulse count factor x100 and P2 will be pulse count factor x1.
      Please send us an email at Lincoln.Tech.Service@skf.com. We can discuss further and provide the manuals necessary to set up the P603s.
      ~John

  • @akeelahmad9748
    @akeelahmad9748 4 роки тому +2

    Sir please Lubrication System QLS 401 Programming movie send me .Sir Thanks

  • @yonatansernarodriguez793
    @yonatansernarodriguez793 4 роки тому

    Your video is very good but you should post one translated into Spanish. Outside of the one you have in your language. So I think you would have many more followers or at least more views on youtube