HV GIS Termination Installation

Поділитися
Вставка
  • Опубліковано 21 січ 2025

КОМЕНТАРІ • 25

  • @kennyg1358
    @kennyg1358 3 роки тому +3

    Ten times more engineering and work than I would have guessed.

  • @douro20
    @douro20 4 роки тому +1

    I'm guessing that the heating step is to ensure that the core is completely dry before installing the termination.

    • @VienDuHoang
      @VienDuHoang  4 роки тому +2

      It might be one of the reasons, but the main reason is to make the cable straight and even, before installation.

  • @Ljacobs221
    @Ljacobs221 5 годин тому

    under water connection 400kv ?

  • @moondog7862
    @moondog7862 2 роки тому +2

    Shocking cable preparation, crossed screenwriters, scored the conductor with a knife too😂😂

  • @zizizizi1709
    @zizizizi1709 3 роки тому +1

    110кV? What type is that termination? connex5? connex6s?

  • @bluesignal2334
    @bluesignal2334 2 роки тому +1

    How much hours it takes for one termination

  • @hkvlog4143
    @hkvlog4143 4 роки тому +1

    Im a asistent cable jointer and have a experience of six years on 132kv, 220kv,400kv. i worked in qatar for six years. If you need asistent cable jointer then i would be much happy to work with you

    • @VienDuHoang
      @VienDuHoang  4 роки тому +2

      Thank Khadka. Actually, I'm in Viet Nam. But should I have any job, I would let you know. Thank you.

    • @hkvlog4143
      @hkvlog4143 4 роки тому

      @@VienDuHoang Thankyou sir , this is my email id = Harikhadka414@gmail.com

  • @aqibbajwa2003
    @aqibbajwa2003 4 роки тому

    Which accessory this one?

    • @VienDuHoang
      @VienDuHoang  4 роки тому

      3M my friend, it is HV cable accessories.

  • @mahendrangm4706
    @mahendrangm4706 5 років тому +1

    Wow super...

  • @Jim1Guo
    @Jim1Guo 2 роки тому

    Looks like dry type plug-in termination

  • @hkvlog4143
    @hkvlog4143 4 роки тому

    Round cuter no have

  • @aqibbajwa2003
    @aqibbajwa2003 4 роки тому

    Hi guys way not use cable streping machine to save time

    • @VienDuHoang
      @VienDuHoang  4 роки тому +1

      the semi-con bonded to XLPE layer, no cutting machine could remove it evenly, and might make the XLPE thinner by removing too much of the insulation. Glass cutting is the safest way, but time consuming.

  • @zaitonyahya4768
    @zaitonyahya4768 Рік тому

    3m❤3m❤3❤3❤

  • @zaitonyahya4768
    @zaitonyahya4768 Рік тому

    Mitsubishi