For inside plastering for passage portion, u have taken length as 2.4 instead of 1.8. That might be an error because u have already covered the outer faces of passage portion as inside faces of bedroom and kitchen.
DOUBT 🙋♂ : why the front portion breadth is added, and the rear portion the breadth is substracted in long walls? kindly explain it. Otherwise the content was so great. Thank you!
is there a video for roof work? I am pleased with your work.
Why didn't deduction for internal plastering
There should be deduction in internal plastering
Thank you mam,kindly also make video on rate analysis and septik tank estimate
Thank you so much for this. I'd like you to do for us a more complex plan with many outer corners
Thank you so much mam, a good topic I ever watch
Most welcome, keep watching and sharing
For inside plastering for passage portion, u have taken length as 2.4 instead of 1.8. That might be an error because u have already covered the outer faces of passage portion as inside faces of bedroom and kitchen.
Please upload the estimation of two storey building
Thank u madam it is a full detailed information
Welcome 😊 keep watching and sharing
Heya can you give me the full detailed estimate of single storey building
Good content..
Thank you, keep watching and sharing
Why You are not calculated short wall for earthwork excavation
Thanks madam 💕🥰
missing the inside plastering detection
Please tell me about refilling of foundation?!
Thank you so much Ma'am
DOUBT 🙋♂ : why the front portion breadth is added, and the rear portion the breadth is substracted in long walls? kindly explain it. Otherwise the content was so great. Thank you!
Thanks mam👍
Thank you mam❤️
Thanks for watching, all the best
Can anyone tell me, how many t - junction's in this plan?
If we are solving by Center line method ?
Total 8 t joints if m not wrong
54.5 chainage length and 10 no of joint
Ma'am in last one wood work work Is that a mistake that height value is inserted in breadth column?
Thank You Mam
Most welcome 😊
Very good explain madam thank you madam create more videos of civil engineering videos
Thank you for watching, we will come up with more videos on civil engineering
why beam is not included in the calculation
Please why is it that some of the long walls are been added and other been substrated
can i download with your permission and if so how am i to do so
Madam by centre line method
How many junction can I get ?
9 or 10
10
This is not centre line methodc.yvr caculating by adding 0.3/2 which i think it shold .3 because we talk outer to outer distance .
Maim centre line method pe ak video please 😢
It is already uploaded
mam are you volunteer to share the excel sheet you are using to do this example?
Name of book please?
There are 6 passages..y the no of passages was given 1 in sand filling part
Back bancher's r watching before es&c exam in 2021
Keep supporting by watching and sharing
I'm first bench but I'm watching now, tomorrow is my exam
@@bujjikanna6992 Same 😂
Watching in 2023...we r ultra back benchers
Thank u mam
Awesome ❤️
Thank you so much, keep watching and sharing
I don't understand how you get 4.704 after adding 3, 9.8, 0.8, 0.2 on the main building long wall
its not adding its multiplication, 3*9.8*0.8*0.2 as you are finding qty in volume so why will u add?
Presentation is superrrrrrbbbbb. But explanation could have been more elaborate.
Solve the centre line method
A good one
Lintel nhi hoga mam
Can use thiw in exams Karnataka Diploma
Yes, definitely
Inside plaster deduction not done
Steel calculation???
Steel calculation is not shown
Maim mujhe bhi class online karna he
Super informative but for finding long wall length we should add always with breadth but you are subtracting with breadth why?
We are excavating inside short wall
In the problem they have given ratios 1:4, 1:6
Where we have to use them
Super 👌👌
Thank you, keep watching and supporting
👌🏻
Ventilater 😂😂😂
👏👍