Pipe and Auger Installation Instructions | EZ Dock Installation

Поділитися
Вставка
  • Опубліковано 27 сер 2024
  • In this instructional video on pipe and auger installation, you will learn more about the dock assembly process and how to secure your floating dock using pipe augers. Pipe augers from EZ Dock are designed specifically for penetrating the seafloor.
    In this video, you will learn how to assemble your dock from EZ Dock and ensure it is secure to the lake, ocean or river floor using our pipe augers. The first step in the installation process is to insert the dock sections into the water. Use the coupler set to attach each section. A driver tool will help you tighten these couplers for greater stability and durability. Be sure to pry the dock apart and use the in-water coupler installation tool before torquing the couplers to 15 foot-pounds with the driver. Always make sure not to over-tighten them.
    When you’ve secured your dock sections together, you can prepare the auger kit and O.D. pipe to go into the water. Install the pipe bracket kit into the side of the dock, and secure it with couplers. Again, torque the couplers to 15 foot-pounds without over-tightening them. Carefully screw the auger pipe into the soil bed at least 2 feet deep or 1/3 of the water’s depth.
    Once the auger pipe is secure, you can attach your polyethylene gangways, insert your pocket filler and install the dock bumpers and cleats. And you’re done!
    Timestamps:
    [00:05] Put the dock sections into the water
    [00:12] Attach each section using the coupler set
    [00:20] Secure the coupler with a drive tool with a socket adapter for composite
    [00:26] Pry the dock apart to allow space for the coupler installation tool
    [00:32] Use the in-water coupler installation tool
    [00:45] Torque coupler to 15 foot-pounds
    [00:55] Prepare auger kit and O.D. pipe
    [01:00] Install pipe bracket kit onto the dock with couplers
    [01:09] Torque coupler to 15 foot-pounds
    [01:15] Screw the pipe into the soil bed
    [01:28] Prepare hinge kit for polyethylene gangways
    [01:33] Apply anti-seize to nuts and bolts
    [01:37] Attach bottom male connectors
    [01:55] Tighten nuts
    [02:10] Attach 3 angle brackets from the hinge kit
    [02:22] Thread bar to attach the sections and secure with a pin
    [02:32] Insert pocket filler
    [02:38] Install dock bumper kit
    [02:45] Attach nylon cleat with bolts
    Browse anchoring products from EZ Dock today: www.ez-dock.co...
    Subscribe to Our Channel: www.youtube.co...
    Follow Us:
    Instagram: / ez_dock
    Twitter: / ezdock
    Facebook: / ezdockinc
    Pinterest: / ez_dock
    LinkedIn: / ez-dock

КОМЕНТАРІ •