Papa ji your video are very informative please request you to give a detailed video on progress and current status of works like benching and lining works status. Also drainage work has commenced or not. Also when will track laying signaling and electrical work will begin in sequence
The Qingshuihe Railway Bridge has a total length of 360 meters, a maximum pier of 100 meters, and a maximum span of 128 meters. The operating speed is 310-330 kilometers.
Ek dam badhiya vedio
Jay hind 🇮🇳👳JK India🇮🇳 रेलवे from DaUsA Rajasthan
Zabardust😊😊😊
Papa ji your video are very informative please request you to give a detailed video on progress and current status of works like benching and lining works status. Also drainage work has commenced or not.
Also when will track laying signaling and electrical work will begin in sequence
People want khat Khat money not development. 😂😂😂😂
Amravathi future mega project work firse shuru ho gaya hai toh uspar detail video banaiye.
Ho gya kya start bhaii
We should be alert about peacefuls
Katra se Kb tk railseva shuru ho skti h?
Sir please ek video banao na Delhi me slums ke uper
The Qingshuihe Railway Bridge has a total length of 360 meters, a maximum pier of 100 meters, and a maximum span of 128 meters. The operating speed is 310-330 kilometers.
Bhai Manali tak railway ka kya hua uska video banao na
chla h kaam
जय श्री राम 🚩
The bridge should be named as Asikni Setu ie the original name of river rather than fake name which means Chinese Water.
chinese nahi chenab river
Modiji jindabad
PAPPU will use railway to transfer khata khata funds to terrorists in J&K😂😂