    Method Statement for laying of BC DBM BM and SDBM for main carriageway and service roads
    Method Statement For Laying of Binder Coarse (BC), Dense Bituminous Macadam (DBM), Bituminous Macadam (BM) for the main carriageway and Semi Dense Bituminous Macadam (SDBM) for the service roads


    Scope of Work
    The works generally consist of laying, spreading and compacting of Bituminous Bound Macadam (BBM) for the main carriageway on prepared road base (WMM) which primed previously with prime coat and in accordance to the requirement and specification given (Clause 507).
    Materials
    Approved source of crushed stone aggregates of 40MM, 20 MM, Key Aggregate of 12 MM and the binder material 60/70 grade Bitumen.
    Machinery & Equipment
    The equipment to be used for laying and spreading of BBM shall be Tippers, Motar Grader, vibration tandem roller, pneumatic tyre roller, Bitumen boozer and water truck as and when necessary.

    Sequence of work

    The surface of the must clear of leaves, or inferior material etc. on WMM which are coated with tack coat , vehicle are not allow to travel on the surface other than trucks and boozer. Before carrying out actual paving operation ensure that the following to be checked on the site.
    The transverse cold joint to be vertically cut, cleaned and tack coat to its face.
    Transporting of Aggregate.
    Number of truck and cycle time, adequacy, start time, Truck cleanliness
    Preparation of the base.
    The base on which the Bituminous bound macadam course is to be laid shall be prepared ,shaped, and compacted to specified lines, grades. Prime coat shall be over the base as per MORTH Cl.502-4.3