Trains at Stapleton Road 31/12/18

Поділитися
Вставка
  • Опубліковано 15 гру 2024

КОМЕНТАРІ • 9

  • @stevehallam0850
    @stevehallam0850 6 років тому

    Good use of the restored four track layout. I assume some of these were diverted trains when Parkway was closed.

    • @fgwHST43009
      @fgwHST43009  6 років тому

      Steve Hallam when Bristol Parkway was shut all that was diverted was CrossCountry and the Paddington to South Wales services. In this video the GWR HST and IETs were working Paddington to Bristol via Bristol Parkway due to Severn Tunnel Junction being closed.

    • @stevehallam0850
      @stevehallam0850 6 років тому

      @@fgwHST43009 thanks for clarification. Certainly shows the value of the new tracks.

  • @OliverTrueman
    @OliverTrueman 6 років тому +2

    Nice one mate. Can’t wait to see more in the new year.

    • @fgwHST43009
      @fgwHST43009  6 років тому +1

      It IS the new year already. 😉😂

  • @Bristoltwingo
    @Bristoltwingo 5 років тому

    I challenge you to film four trains (one per track) at once by Stapleton Road

    • @fgwHST43009
      @fgwHST43009  5 років тому

      For that you need 4 trains to turn up at once. That will be very difficult because there isn't anywhere on the 4 track section where there are 2 up and 2 down trains scheduled to pass each other in the same place.

    • @Bristoltwingo
      @Bristoltwingo 5 років тому

      @@fgwHST43009 Even including goods trains?

  • @grahamrawlings7327
    @grahamrawlings7327 6 років тому

    Looking more like a station now.