Tug Washington transverse arresting maneuver with NACC Argonaut

Поділитися
Вставка
  • Опубліковано 16 січ 2025

КОМЕНТАРІ • 3

  • @larrythomas1065
    @larrythomas1065 5 років тому +1

    Great information. Thanks

  • @bubbafudpucker397
    @bubbafudpucker397 5 років тому +1

    How do they get the cement into the holds? It looks like the hatch covers are inaccessible.

    • @MrWlbblw
      @MrWlbblw  5 років тому +1

      Bubba Fudpucker It’s dropped in thru the loading pipes & equipment on deck from a dockside rig that overhangs the hold at the loading wharf.