Jupiter US 1 Bridge Replacement Project - Smart Work Zone

Поділитися
Вставка
  • Опубліковано 8 вер 2024
  • To prepare for the 20-month closure of the Jupiter US 1 Bridge while the bridge is being replaced, Intelligent Transportation System (ITS) devices are being placed along the detour route to allow 24/7 monitoring and active traffic management by the Florida Department of Transportation and Palm Beach County. These enhancements will improve travel times, alleviate congestion, allow real-time adjustments of traffic signal timing and allow advance notification to the public of traffic delays. A system that allows emergency vehicles to receive green lights at signalized intersections also will be deployed to reduce emergency response times.

КОМЕНТАРІ •