enjoyed watching both parts. was the tower crane in the foreground disabled ( why the mobile unit brought into service?) very impressive machine I've loved mobile cranes ever since I was a young lad never able to get close enough to one of these monsters to see how it's set up, I would love to see more videos like this- thank you!
Lon Shaffer pretty sure it was there to take down the tower cranes. You can see it removing counterweights from the tower crane that is mostly out of frame at the end of the video.
Very good job! Thanks a lot! At the end of video LTM1750-9.1 dismantles Terex Comedil CTT561. The other tower cranes seems like Yongmao. But what models?
Thank you very much for posting these awesome videos! I'd love to see a 750 with my own eyes! Just curious: is the exact configuration 49,1 m of main boom (92-92-92), 10,0 m V2, 5,0 m VE and 45,5 m of luffing jib (and of course the Y guide)?
Exactly my thoughts. An LTM1750 to disassemble a tower crane? Awesome! Than there's where I live: Use a four-axle crane to disassemble a tower crane :/
How much this full set weights? 1750 itself is 108 tonnes, maximum counterweight is little above 200 tonnes and boom extender also, so I think it is around 400 tonnes? How many hours you need to setup 1750 without boom extender as in part1?
Close.. The weight is prox. 390tn. The assembly time is, of course, connected the site. If the site is challenging, some 12 to 16 hours. If site is "empty" and everything go smoothly 8 hours.
The engineering that went into designing this. 😳
Good to know that $6,000,000 still buys something of value!
Impressive. Great music at the end to go with the lift.
Я давно работал на Terex CTT 721-40 hd83, очень хороший кран
This behemoth towered over the sky cranes. What an epic machine this is indeed. Extremely impressive.
Epic crane
Epic setup
Epic video
Well done
I have a similar video of a Ltm 1750 build but not as good as yours
Kudos
amazing video. Very good workers
WOOWWW!!! What an incredible crazy machine!! 😳😳😳😳
Nice video with cool background music
enjoyed watching both parts. was the tower crane in the foreground disabled ( why the mobile unit brought into service?) very impressive machine I've loved mobile cranes ever since I was a young lad never able to get close enough to one of these monsters to see how it's set up, I would love to see more videos like this- thank you!
Lon Shaffer pretty sure it was there to take down the tower cranes. You can see it removing counterweights from the tower crane that is mostly out of frame at the end of the video.
Awesome JOB.. WHAT A MACHINCE..
WHAT IS MACHINCE???????
the red elevator.... 0.00 - 13.30
Holy shit , that is amazing 🤦♀️
Very good job! Thanks a lot! At the end of video LTM1750-9.1 dismantles Terex Comedil CTT561. The other tower cranes seems like Yongmao. But what models?
Yongmao STT553
@@nostopalveluj.helaakoskioy5481 Thanks for answer!
Thank you very much for posting these awesome videos! I'd love to see a 750 with my own eyes! Just curious: is the exact configuration 49,1 m of main boom (92-92-92), 10,0 m V2, 5,0 m VE and 45,5 m of luffing jib (and of course the Y guide)?
73,5m jib
3:38 nice song
Very good upload. Thank you.
so wait a sec. That was to break down a tower crane? seems quite pricey.
Exactly my thoughts.
An LTM1750 to disassemble a tower crane? Awesome! Than there's where I live: Use a four-axle crane to disassemble a tower crane :/
@@Niidforseat Yes, but try to disassemble a tower crane this far away with a 100 - 200t crane...
This would not work
@@Nobdy77 Sure dude. I was certain they calculated their stuff before building up this giant.
Hey, If you can think of an better way to move two small boxes from one side of the site to the other, 12:50, I'd like to hear about it!
Counter weights from another tower crane, or were you trying to be funny.
@@MrJonah53 :)...Yeah, I was just breakin balls...We senior construction guys are allowed to...:)
How much this full set weights? 1750 itself is 108 tonnes, maximum counterweight is little above 200 tonnes and boom extender also, so I think it is around 400 tonnes?
How many hours you need to setup 1750 without boom extender as in part1?
Close.. The weight is prox. 390tn. The assembly time is, of course, connected the site.
If the site is challenging, some 12 to 16 hours. If site is "empty" and everything go smoothly 8 hours.
Очень круто! Супер :)
Nice
very good~!!!!!!!!
What's the charted capacity for the furthest lift and/or set radius? Just was curious.
I will buy one, one day inshalla
🔝
Top
I bet, the crane can not lift itself. lul