The studies are still ongoing; they have fallen behind because of the pandemic. The Somport International Tunnel, the most complex because the railway tunnel and the road tunnel are each to serve as a backup to the other, should be completed in early 2024. This will be followed by a public utility survey on the French side. According to the latest information, the reopening would take place in 2027.
is there any news about, the railway south of bedous ? did they start the work there ?
very nice videos !!
The studies are still ongoing; they have fallen behind because of the pandemic. The Somport International Tunnel, the most complex because the railway tunnel and the road tunnel are each to serve as a backup to the other, should be completed in early 2024. This will be followed by a public utility survey on the French side. According to the latest information, the reopening would take place in 2027.