Scary heights Engineering video

Поділитися
Вставка
  • Опубліковано 5 вер 2024
  • I am level 2 RAT. I am working in London uk abseiling building in my orange suit.
    The building is 70 meters tall.
    The repair is a standard splice procedure to make sure the expansion joint is in the right place - otherwise bricks pop off when the building wobbles.
    An expansion joint allows the building to naturally wiggle and not crumble . However this building was poor constructed so we will have to repair every single incorrect expansion joint.
    I am using a Pretzl harness, descender, back up ASAP.
    This is a look at what it’s like to do rope access in London.

КОМЕНТАРІ • 12

  • @julianhawkins4281
    @julianhawkins4281 4 місяці тому +3

    Great abseiling skills
    Nice repair too
    I like the early commentary

  • @jefflewis2304
    @jefflewis2304 4 місяці тому

    Wow, coming from a low populated area I never even thought about this kind of work. You are evidently a very skillful professional, really cool stuff!

    • @Grasscutter69
      @Grasscutter69  4 місяці тому +1

      This kind of work isn’t really a thing where I come from unless you work on trees

    • @stevewascher6866
      @stevewascher6866 4 місяці тому +1

      @@Grasscutter69 entertainment rigging could be an option. I’m certain that’s the reason the algorithm brought me here.

  • @silly_G33se
    @silly_G33se 4 місяці тому +1

    Can't wait for you guys to do the brickwork next!

    • @Grasscutter69
      @Grasscutter69  4 місяці тому +1

      Won’t be long , bricks are in the compound

  • @isaacmiletic
    @isaacmiletic 4 місяці тому

    This is crazy what a huge mistake someone made and i have to say you have got some balls my man to just hang there and work like its nothing amazing job.

  • @josh4856
    @josh4856 4 місяці тому

    no barrier below was giving me the fear, ik you weren't directly over foot path dw lol, much different safety regs to oil and gas industry I'm used to. great and interesting work on the ropes though, cool to see how these buildings are made.

  • @adriengallet1831
    @adriengallet1831 4 місяці тому +1

    Love the content! Can't believe the amount of work that is required just to move an expansion joint. By the looks of it, the expansion joint was 10cm too low? Or was the initial gap in the steel channel for something else?

  • @garybrown8593
    @garybrown8593 4 місяці тому

    Come on guys you know you need a exclusion zone below 🙊1 m for every 3m if possible any of that material fall your in trouble we can see it’s a public walkway below

  • @_KRH11_
    @_KRH11_ 4 місяці тому

    I am thinking of doing my IRATA level 1 is it hard to get work?

    • @Grasscutter69
      @Grasscutter69  3 місяці тому

      Summer time is here and there is lots of work going on- it will be worth joining a firm and get your hours up