According to IEC 62305 Part 3, Clause E.7, electrical testing of the lightning protection system, including the thunder arrestor, should be performed annually. For structures with explosion risks, visual inspections are recommended every 6 months. This ensures the continued functionality and safety of the installation. For detailed guidance watch this video: ua-cam.com/video/KtSl9dhtxdA/v-deo.htmlsi=nk7YOnKQ7HAe3dsK
How do one check the functionality of the thunder Arrestor after installation
According to IEC 62305 Part 3, Clause E.7, electrical testing of the lightning protection system, including the thunder arrestor, should be performed annually.
For structures with explosion risks, visual inspections are recommended every 6 months. This ensures the continued functionality and safety of the installation.
For detailed guidance watch this video:
ua-cam.com/video/KtSl9dhtxdA/v-deo.htmlsi=nk7YOnKQ7HAe3dsK
I have some problem in earth rod for adhersion test how much size I am setting the steel block
Gap between plate = (Earth Rod DIA) - 1 mm
Nice explaination❤
Thanks!
I am glad you liked it Keshav!