Brisbane's $7BN Cross River Rail FAILURES and SUCCESSES

Поділитися
Вставка
  • Опубліковано 24 січ 2025

КОМЕНТАРІ • 7

  • @pipsasqeak820
    @pipsasqeak820 Місяць тому +1

    Most projects in Brisbane aren't actually being done on time due to the CMFEU debuckle, things like the Metro/Victoria Bridge, Cross River Rail etc have been delayed because of that

  • @forthecreators4604
    @forthecreators4604 25 днів тому

    “Rock-lee, pim pa ma”

  • @electro_sykes
    @electro_sykes 2 місяці тому

    i live there

  • @thevannmann
    @thevannmann 15 днів тому

    So much misinformation lol. Brisbane's population isn't 3.5M it's 2.5M, it's not going to double in 11 years, and Perth is the fastest growing city atm.

  • @theyoutube7696
    @theyoutube7696 Місяць тому +1

    Project over budget and over time. Thank the lazy cnts at the cmfeu