Case IH Pro 600 700 Combine Yield and Moisture Calibration - ADVANCED WALKTHROUGH | FOR SOYBEANS

Поділитися
Вставка
  • Опубліковано 22 сер 2024
  • In this video with the Red Power Team we go over how to run a yield and moisture calibration in your Case IH combine prior to going into the field for harvest. It is recommended that you do each calibration 3 times to get an accurate look at the data in your field. This technique uses the Advanced calibration method inside the Pro 6/700 monitor.
    Be sure to subscribe to our channel as we cover more of the Case IH Combine with various heads and AFS pro 700 monitor.
    www.redpowerteam.com

КОМЕНТАРІ • 6

  • @farmertim5381
    @farmertim5381 3 роки тому +2

    This is the BEST and easiest to understand video on this topic I've learned from. Thank you, thank you, thank you. I will look for more.

  • @timnichols9015
    @timnichols9015 3 роки тому

    Thanks, just got a 8010 with a Pro 600. Good info so I can Calibrate this fall! Had a 2188 with Ag Leader PF Advantage before. It was very accurate, I see this combine has much the same sensor system.

  • @cgritter7095
    @cgritter7095 2 роки тому

    Good explanation! Tks

  • @louwrenspotgieter9038
    @louwrenspotgieter9038 2 роки тому

    Thanks for a great tutorial. I don’t have a way to weigh the load in the field. Have to send a load to weigh it when delivered. It can take up to 2 hours to get the load from the field to the delivery point. Can I just create a new task in the meantime and continue to harvest while waiting for the weight info of the load after it has been delivered and use that info for the “Yield 1” task for calibration?

  • @EagleMiles
    @EagleMiles 11 місяців тому

    Intriguing

  • @user-qt8zt6zg6w
    @user-qt8zt6zg6w 3 роки тому +1

    Off means on?! What? This is why everyone hates the 700