Concrete Stem Wall Foundation

Поділитися
Вставка
  • Опубліковано 8 тра 2017
  • Some "odds and ends" shots taken while forming and pouring a residential raised floor foundation, as opposed to a slab on grade.
    Dave and his sons build residential in California....

КОМЕНТАРІ • 219

  • @johnjacobs3643
    @johnjacobs3643 6 років тому +44

    Hey Dave. Just wanted to say thanks for your stem wall instructional videos. I just poured the foundation for our cabin using your methods. Worked perfect! The concrete company commented over and over again about how well the forms were built, calling it "old school" and the way they used to be built.He said, "you just don't see this type of craftsmanship and attention to detail anymore". When he found out that it was the first time that we had built forms, he asked how I learned to build them this way...I told him that I learned by watching your videos. He was shocked! Again, thanks.

    • @davidosland1440
      @davidosland1440 6 років тому +5

      Love to hear it! I make these videos on the fly during construction.
      Maybe I'll be able to slow down and get some more details/better videos.
      Congrats on the good pour!!
      Dave

  • @juniormorgan7458
    @juniormorgan7458 3 роки тому +1

    Love watching things being built. There is a lot to be said for those who build things that last and bring a lot of joy and benefit to their users. As a lawyer I do as much tearing down as I do building so I love getting into the garage and building or repairing things. Its great therapy.

  • @dianewomble527
    @dianewomble527 6 років тому +1

    Very nice. A king stands out in front of the field when his craft is very good. Very good work.

  • @andrebaranov7652
    @andrebaranov7652 4 роки тому +1

    Dave,
    Thanks so much for posting this video. It really helps our design staff to see how foundations are set up and formed. Huge blessing.

  • @twenge189
    @twenge189 5 років тому

    This was great and very informative! Thanks for the video and sharing your knowledge!
    -Jake (your neighbor up in Oregon!)

  • @Ungtartog
    @Ungtartog 6 років тому +1

    Thanks you so much! I've done lots of work above the concrete, but in the last 12 months I'm getting lots of foundation jobs that I barely know how to do... It's really wonderful to be able to watch skilled tradesman practice their craft... you learn a lot just from watching tools and bodies move, and the explanations and details are highly appreciated!

    • @daveosland3199
      @daveosland3199  6 років тому +2

      I've built over a hundred homes from the ground up, plus numerous foundations, etc..and STILL learn tons every time I do a new job!! If we aren't learning every day, something isn't right....

    • @arkansas1336
      @arkansas1336 6 років тому +1

      Glass Menagerie --- I'm old and retired but I built a lot of this type of construction. There is always something to learn on each house/project.....and we all learn by doing (aka experience). Concrete form work was a lot of fun for me as you never knew what the next forming job would be like and I enjoyed the variety.
      Good luck in your career!

  • @valoruniversity
    @valoruniversity 6 років тому +5

    this was very helpful! I am making a 16'x18' perimeter 16 inches high and I can follow this video. Thank you!

  • @xzytqweo3538
    @xzytqweo3538 3 роки тому

    Excellent tips and tricks...mighty fine crew you have there.

  • @MohammedAslamtit-bitsoflife
    @MohammedAslamtit-bitsoflife 6 років тому

    Excellent Mr Dave you are good example for others..God bless you n yr family ..amen

  • @angeloacosta9411
    @angeloacosta9411 3 роки тому +1

    You guys do great work ! Keep it up gents !!!

  • @chrisdgough
    @chrisdgough 4 роки тому +1

    super helpful... I think I will do this myself... you just saved me thousands!

  • @juanconde5392
    @juanconde5392 5 років тому

    I've been doing concrete work for 43 years and I always appreciate seeing really good work, and I must say your formwork was done in a very efficient and easy way. I like the 12x12 blocks to hold the CBs in place. Gotta try that next time. Very well done sir

  • @fordguyfordguy
    @fordguyfordguy 7 років тому +1

    Extremely helpful, and well made video!!!

    • @daveosland3199
      @daveosland3199  7 років тому

      Glad you got something out of it!
      Raised stem walls are less common now, but I appreciate the access to plumbing, etc, and the feel and warmth of a raised wood floor.
      With increased costs of concrete slab foundations due to design/engineering, etc. the stem wall foundation is a competitively priced construction method, especially when the forms can be reused for another foundation or incorporated into the structure.-
      Dave

  • @masonzheng9738
    @masonzheng9738 4 роки тому

    great in detail video. very educational.

  • @sandercurtis1847
    @sandercurtis1847 6 років тому

    Excellent video.

  • @Daynaleo1
    @Daynaleo1 6 років тому

    HEAR YE HEAR YE!!! IMMEDIATELY SUB!!! This crew shares some awesome tips and tricks in this video. I immediately subbed after watching this (the first) video and can’t wait to see what else I can learn here.

  • @windygorge1
    @windygorge1 5 років тому +2

    I love the precast block trick.

  • @danielpadilla7500
    @danielpadilla7500 5 років тому +1

    Muy bueno video my friend you are very professional

  • @arkansas1336
    @arkansas1336 7 років тому +1

    Excellent, well done!
    ....13

  • @snappybabby4646
    @snappybabby4646 Рік тому

    Excellent job

  • @blakeamartin07
    @blakeamartin07 Рік тому

    Nice touch with the proverb at the end. :)

  • @mattka5354
    @mattka5354 6 років тому

    Thank you for posting. I'm having a guest house built and foundation is built the same way. Originally went with slab on grade but architect recommended a raised Foundation to make plumbing and eletrical repairs easier. It cost more but I think in the long run is better.

    • @davidosland1440
      @davidosland1440 6 років тому +1

      Slab-on-grade used to be the "poor man's" foundation, but with the engineering standards, etc., the cost is not very different. A lot of slabs are now "post tension".
      Ask anyone who's had to jack hammer into a slab to repair plumbing if they would prefer it to a raised foundation. There's also a different feel and warmth to a raised wood floor......

  • @butopiatoo
    @butopiatoo 4 роки тому

    Great example!!

  • @beaubromley942
    @beaubromley942 10 місяців тому

    I know this posting is older but I was wondering what all is coming up through the stem wall. Not including the sleeve for plumbing, I see ufer ground, and electrical. What are the other two. Com and water? What’s the black thing all the way to the right? This is the best video on stem wall foundations, thanks for sharing your forming secrets.

  • @outdoorcrazy
    @outdoorcrazy 7 років тому

    Nice clean work!

    • @daveosland3199
      @daveosland3199  7 років тому

      Thanks! It sure makes the subfloor frame easier.....

  • @AllAccessConstruction
    @AllAccessConstruction 2 роки тому

    Good point of the form oil... We still put it on day before we add rebar gives it time to dry...

  • @marcbachman4987
    @marcbachman4987 6 років тому +6

    I might suggest excavating the crawl space area for trades working under the subfloor.

    • @davidosland1440
      @davidosland1440 6 років тому +3

      You're correct on the need for the crawl space. The 18' high stem wall creates the space without having to excavate a below grade area. I prefer this over the excavated method, to have the home sitting above adjoining grade to allow for sloped finish grade and to eliminate potential water/moisture infiltration into a lowered grade area.-
      Dave

  • @MasterCivilEngineering
    @MasterCivilEngineering 3 роки тому +1

    Expertise in engineering here

  • @dhilton3697
    @dhilton3697 6 років тому

    Good stuff man

  • @donsmith9081
    @donsmith9081 Рік тому

    Thank You!

    • @daveosland3199
      @daveosland3199  Рік тому

      You Bet!
      hope there are a few tips to help forming...! Dave

  • @johnperkins8895
    @johnperkins8895 4 роки тому

    Nice work sir

  • @LaSouthernGemini
    @LaSouthernGemini 7 років тому +1

    Very nice. For wet southern Louisiana I had a test compaction/consistency test performed saying I need to be 30-36 inches below grade to have 3000 psi soil though my engineer said I can go as low at 1500psi.. Base Flood Elevation is 36ft which happens to be 1.5 ft above grade. I am building at 37.5ft b/c BFE is the MIN allowed by building code and I want to higher. That puts the top of stem wall at 3 ft above grade which means my wall is 6ft total top to bottom and 16 inches wide. Lots of concrete. Although I like the idea of 2x12s running around the perimeter inside and out, that is a lot of boards and could leave a lot of lines to be finished the next day once the form boards are removed. Still not sure on my route to take.

    • @davidosland1440
      @davidosland1440 7 років тому +2

      Let me understand this- Your stem wall will be 16" thick and 6' high off the footing??? That would hold up a bank. I've done 6' high stem walls, but 8" wide is rated for 2 stories. Anyway, unless you can reuse the form lumber in the frame, I would use concrete block for the stemwall, but again, if it really is 16" thick, a plywood formed wall using whalers is another method used.

    • @LaSouthernGemini
      @LaSouthernGemini 7 років тому +1

      Hello David. Yes you are correct. From the bottom of the footing approx 36" inches down from grade extending out of the ground 36" above grade to reach 1.5 feet higher than BFE of 36 feet above sea level for my area. The footing/stem wall plans were drawn originally 12 inches wide by the engineer who is confident about it being enough support but both concrete 'guides' that I interviewed stated how difficult it would be to run 14 #5 rebar in such a tight area. After some discussion with them and the engineer I voted to make the width 4 inches wider to 16 inches. The cost of the concrete is not that much more for the speed to do what needs to get done. A rough calc has it about $5k more. One reason why so massive is the peak of the roof is 36 feet high, building is all steel AND the entire second story is (lightweight) concrete flooring 3-4 inches thick. So yes, in a way will hold up a bank but I stayed during Katrina and I plan to stay again in a much stronger domicile. For kicks I will be happy to send you the drawings. It borders commercial grade. In the meantime I will look up 'plywood formed wall using whalers'. Thank you for the lead.

    • @davidosland1440
      @davidosland1440 7 років тому +2

      and i thought i built burly......

    • @bigonprivacy2708
      @bigonprivacy2708 Рік тому

      @@davidosland1440 LOL

  • @mmmmm1937
    @mmmmm1937 5 років тому

    We use sds screws. Helps so much.

    • @daveosland3199
      @daveosland3199  5 років тому +1

      SDS screrws?? Thats expense when you use hundreds/thousands in a foundation. The drywall screws won't (usually)
      split the form stakes... But I love SDS screws for structural applications!

  • @trek4554
    @trek4554 6 років тому

    Hey Dave, not sure if you miss my question below, but I'm just wondering if you could let me know full size of the building (width and length) , then you have the load bearing wall line up at interior garage foundation is that located half way of the width of the building.

  • @chukobuko
    @chukobuko 6 років тому +1

    Nice video- this is exactly how I was planning on pouring my footers and foundation wall. Is the footer formed by the trench, poured to the bottom of the stem wall? How soon do you pour the stem wall over the footing? Can you use the lumber in the construction or is too messy with concrete?

    • @daveosland3199
      @daveosland3199  6 років тому +5

      The footing is formed by the trench itself- no form boards. I use an 18" bucket for a 15" footing (2 story) or 12" bucket for a single story, unless plans dictate other wise.
      The footing is pumped up to the bottom of the stem wall, so as to seal it for the wetter mix going into the stem wall.
      Usually by the time the footing is poured, the stem can be started on the first poured areas where the footing was started. I try to pour the footing on the stiff side so as to prevent blow-outs when using the wetter mud in the stem. You can generally start pumping the stems 20-30 minutes after the footings have been poured. You don't want to wait very long as having formed stakes anchored in a solid footing is no fun!
      After everything is poured and striked off, I go around with a hose and spray off everything I can so i have relatively clean lumber to put back into the subfloor in a couple of days. (i have a video showing the sub-floor being installed just a couple of days after the pour with the forming material.) ua-cam.com/video/4xMSep0uiRs/v-deo.html
      Designing most of the homes we build, I plan on subfloor joisting that is compatable with the form material. It never has to leave the job and is a very cost efficient design/build technique-
      Dave

  • @bobbytech9966
    @bobbytech9966 6 років тому

    Hi Dave, What is the full size of the building, then you have the load bearing wall line up at interior garage foundation is that located half way of the width of the building.

  • @mikekohn869
    @mikekohn869 6 років тому

    Hello Dave Osland. I would like to let you know that your excellent video inspired me to do my very own stem wall for my new garage and breezeway! I am a Window and Siding installer by trade but consider myself an all around carpenter who is not afraid to try and learn new things...I mean who doesn’t like to save money on labor 😃. I would love the chance to pick your brain on my stem wall construction as well...I’m about 35% completed by now...

    • @daveosland3199
      @daveosland3199  6 років тому

      send any questions!
      dave

    • @mikekohn869
      @mikekohn869 6 років тому

      Dave Osland when putting the form ties on do you screw them on or nail those? Or just rely on the wedges to hold them in place? I figured nails or screws would possibly get in the way when stacking the 2x

    • @mikekohn869
      @mikekohn869 6 років тому

      Dave Osland also I’m in Michigan so in my city of livonia I have to go 42” from grade with footing. How many rows of rebar will I need?

    • @daveosland3199
      @daveosland3199  6 років тому +1

      So your footings are 42" in the earth??? Not knowing what codes you use, I would have to assume your plans call it out. In general, a minimum of two horizontal rebar 3" off the bottom of the footing is standard, with a single horizontal run every 18" as you go up in a stem wall. Out yonder here in Calif., we are usually adding vertical bar also, say, every 18" or so, extending from the top runs down to and hooking under the bottom runs. The engineering requirements generally are more than the minimum code requires.
      If I understand, you have a 42" deep footing, I would probably consider pouring only the required footing depth, say, 15"?, and then use concrete block, like a opened ended speed block, to come up to stem wall height.
      Someone who builds out there may have some more insight than I do to your particular situation-
      Dave

    • @daveosland3199
      @daveosland3199  6 років тому

      Use the wedges supplied by the form tie maker, that's all you need. Be sure and use an 1/8" spacer between form board runs, to allow the insert of the tie. If not, you'll have to drop a saw blade in a lot of spots for the tie.

  • @SmittyFan
    @SmittyFan 6 років тому

    Great video. Quick question. Going to DIY a 30x40 3 car detached garage with garage doors on east and west sides enabling me to drive through. Should I stem wall the slab or just monolithic style. Pretty high dry area and hard.
    I’d rather mono it just because it’s easier but wanted your opinion.
    Best regards,
    Jon

    • @davidosland1440
      @davidosland1440 6 років тому +1

      Good question. Unless it's a design issue, I would try a monolith slab pour. if your on a sloped area, a slab-on-grade would be more difficult....
      Dave

    • @SmittyFan
      @SmittyFan 6 років тому

      David Osland thankyou for the quick response and info.

  • @jessesanchez2203
    @jessesanchez2203 5 років тому

    Hi just check out this video and I want to find out if there was a continuation video where it shows how you pour the slab out. We are constructing a house and they put the blocks in before pouring the foundation. I wanted to know if this is a commonly used method and if this will make my house stronger. Thanks

  • @yefrym1638
    @yefrym1638 4 роки тому +2

    Thanks Dave, I mostly had jobs after pouring the concrete but lately I’ve been doing jobs where I have to pour the foundation. This was a great example for first timers like me. I showed my boss and he said that’s a old school way to do it and he found it very cool. I juts have one question that maybe you could answer it’s #3: What are your thoughts on the organized system used to do the forming and its finished look?

    • @daveosland3199
      @daveosland3199  4 роки тому

      I'm not sure what you mean by "organized system".. The exposed concrete after the house is done can be left as is, painted to the ground or even veneered with stucco stone, brick, etc...
      Dave

    • @MasterCivilEngineering
      @MasterCivilEngineering 3 роки тому

      Good luck

  • @farealwitit7947
    @farealwitit7947 2 роки тому

    gr8 vid! luv the bible quote!!!

  • @Ramdodge582
    @Ramdodge582 5 років тому +1

    if your bolts are set prior to pouring put a piece of tin foil to keep concrete off them.. or you can wet set.

  • @offgridpirates7400
    @offgridpirates7400 6 років тому

    Awesome

  • @Axerinathena
    @Axerinathena 6 років тому

    Excelente

    • @z1lla4
      @z1lla4 5 років тому +1

      Eres muy sexy

  • @johnlewis7736
    @johnlewis7736 3 роки тому

    Skills!

  • @hcneakok
    @hcneakok 3 роки тому

    Thank you, another great video. How and when do you set the abs for the drain?

    • @daveosland3199
      @daveosland3199  3 роки тому

      The abs for plumbing is installed after the subfloor has been framed.
      See my subfloor framing vid here-
      ua-cam.com/video/4xMSep0uiRs/v-deo.html
      I always put a section of 4" ABS in the stem wall to pass the waste line thru and out of the house...
      Dave

  • @jeffkusman2179
    @jeffkusman2179 6 років тому

    Thanks for the video, a great help for me in my planning to build a 28x40 garage that regional building requires to have a stem wall foundation here in Col-Spgs. What slump do you request for the pumped concrete? How long before you start putting sill plates down and framing with a winter time pour?

    • @daveosland3199
      @daveosland3199  6 років тому

      Hi Jeff-
      A stiffer mix is used to fill the footings up to the bottom of the stem forms- say a 4" slump? But a 3/8" pea gravel mix will settle different than a 1/2"or 3/4"- Anyway, a stiff but pumpable mix is used first, then wet it up some so the mud leaves little or no voids in the visible stem wall sticking up out of the ground. Running a vibrator or tapping the forms with a hammer is good practice. Nothing like a smooth clean surface when you strip those forms!! If a wetter mix is used first, you stand the chance of the mud blowing out of the bottom of the stem portion. I'll often put plates down the next day, but you might want to wait a day or two in cold weather, as concrete cures very slowly at low temps....
      Dave

  • @adamjosh4134
    @adamjosh4134 5 років тому

    Hi Dave, thank you for your amazing video. I also start constructing my new project and it will be my first project :). It is 2 story unit. As you mentioned below, footing width is 15'' and stem wall width is 8''. The depth for the exterior walls are min 24'' deep and footing depth is 12''. I have excavated the soil exactly 15'' width. But i am wondering how to nail stakes to the wood which is blow the ground level? Can you give me any advice?

    • @davidosland1440
      @davidosland1440 5 років тому +1

      Hi Adam-
      Tough question! Generally, the forms are not hung below grade, because of access to fastening. The best i could think of is to use a 2x12 to extend down below grade, but have the top edge close enough to the trench lip to get a screw into the top edge to hold it.
      on other foundations where I've had to go below grade, I've used a concrete block stem wall rather than wood forms..

  • @jamiechurchill3065
    @jamiechurchill3065 3 роки тому

    Hey Dave, Great video. I was hoping you could answer a couple questions for me. I was wondering how you secure your vertical rebar? And when dealing with a sloped lot, how would you step up when doing a single pour? Thank you

    • @daveosland3199
      @daveosland3199  3 роки тому

      Vertical rebar is tied with pre-made 6" wire ties (they come in rolls of 500). The vertical ties have a short bend on the bottoms, which are tied to the bottom member as well as being tied to the horizontal runs. See the set up in this video-
      ua-cam.com/video/9gC9BwwVjo4/v-deo.html
      On a sloped lot, the footings are cut in steps as well as the forms stepped up the lot.
      Start the pour at the lowest point and pour the footings, to be followed by topping off the stem walls after all the footings are poured. There's usually enough time to prevent the stem wall mud from blowing out the footings when poured 1/2 an hour to 45 minutes later after the footings are poured ...
      Dave

  • @randalusa
    @randalusa 6 років тому

    Psst: A 2x10 is 9 1/4. Used to be anyway. Everything above 2x6 drops from a half to a quarter (unless that has changed or I learned wrong way back). Nice video.

    • @daveosland3199
      @daveosland3199  6 років тому

      a 2x 10 is still 9.5" here in Cal.. Framing lumber is still green Doug fir, not kiln dried like elsewhere....

    • @randalusa
      @randalusa 6 років тому

      I just went next-door where they finished pouring a slab last week. Mostly only 2x6 material there sitting around. But one 2x8 treated. It measured out a wee bit less than 7 1/4. There was an old carpenter unloading stuff at the time here on Sunday morning. He looked toward me with that, 'What do you want on my lot' expression. So I explained the story. Right then he assured me that they are all 1/2, this coming 60 seconds after my measuring his own board and finding different.
      Then I looked online at maybe 3 sites to verify. See link below for one of them. Seems like I win the bar discussion thus far. Old carpenters who are far better at their trade than my couple years as a trainee framer and some time as a finish carpenter are apparently unaware of this weird matter done in the lumber industry for whatever reason.
      You owe me a beer (maybe).
      www.thesprucecrafts.com/understanding-wood-sizes-in-softwood-lumber-3536905

  • @totiduka5474
    @totiduka5474 6 років тому

    Nice job

  • @eddygoodwin7089
    @eddygoodwin7089 2 роки тому

    Hey Dave awesome foundation, they make a coupler for abs or plastic in 6 inch or 8 for sewer to glue into pretty slick makes for a nice tight pass through with no foam. Hope you can use them you seem like the type that would appreciate them.

  • @theclassytrio1510
    @theclassytrio1510 4 роки тому +3

    What material did you use to form the foundation, and then how will you use this material next?

    • @daveosland3199
      @daveosland3199  4 роки тому

      2x Douglas Fir will be used in the framing of the subfloor. I have a video on subfloor framing showing this...
      Dave

  • @Ramdodge582
    @Ramdodge582 5 років тому +1

    time to buy some form boards

  • @terrymiller5028
    @terrymiller5028 5 років тому

    Hi Dave. I’ve watched a lot of videos about forming in prep for me to repair my garage. I’m planning to add a stem wall above an existing foundation.The previous owner had raised the landscaping about 8” above the top of the slab, so the bottom of the 2x4 walls (true 2x4’s and 1x6 exterior cladding inside Vinyl siding)
    My plan was to cut a groove into the foundation,drill holes for the anchor bolts, then add a 2’ high stem wall on top at 6” thickness
    Any advice is appreciated.Thanks

    • @daveosland3199
      @daveosland3199  4 роки тому

      Sorry for the delayed response! Cutting a groove sounds ugly.
      You might consider drilling into, cleaning and epoxying vertical rebar dowels at say16"o.c. and forming.
      The dowels will anchor the stem to the existing concrete. They make nifty double barrel epoxy guns and tubes!

  • @dennismcgehee2984
    @dennismcgehee2984 5 років тому

    Excellent and very informative video but I didn't see any foundation vents. Did I miss something? Or aren't they required where you poured this?

    • @daveosland3199
      @daveosland3199  5 років тому +1

      They'll be in the framed sub floor rim.
      you can see them on my "sub floor framing" video... Dave

  • @GeneFlygene
    @GeneFlygene 2 роки тому

    Thanks for the talent and skill you shared with us, totally agree with the scripture. I have a question, I’m building a post frame house 32’x32’ , it’s on a slope, slopes down from almost 6” at high point down to about 30” on the other end low point. So I’m not drilling posts here, can I build a foundation wall 16” wide and level out from the low side up to the high point , then anchor my posts 8’ apart just as if I drilled a post for each post?
    Thanks for the impute, blessings. Larry

    • @daveosland3199
      @daveosland3199  2 роки тому

      Hi Larry-
      I'm trying to visualize exactly what you are asking here...
      A foundation as in the video, can be done, everything level, with no step up or downs.
      Obviously, the stem wall will be higher as the site elevation drops.
      A complete perimeter foundation, 16" wide, with a concrete slab floor spanning the interior section?
      If I'm understanding, I would pour an 8 " wide stem wall as in the video, and form 16"x16" wide pilasters where each post will sit.
      You'll want a significant drift pin or other way to anchor the posts in place.
      Dave

  • @parkermichael620
    @parkermichael620 4 роки тому

    what do you do about ventilation i didnt see any vent holes formed in your wall our code requires us to have vents with in 3' of each corner? i am building my own house and wondering if i should do this or lay block i enjoy carpentry work more than block so im leaning to stem walls all the way around what do you think?

    • @daveosland3199
      @daveosland3199  4 роки тому

      The foundation vents are put in the wooden subfloor framing- easy-peasy.
      Should you need to put the vents in the concrete itself, I like to uses a CMU (concrete block), lay it on it's side, leaving it open from inside to outside and then install durable screening to prevent critter infiltration!!
      See my video on subfloors... Dave

  • @carpetgalleria1977
    @carpetgalleria1977 4 роки тому

    maybe you could show an overview with the actual plan of the project so that people see how the actual project looks like before zooming on different areas and describe details.
    Thanks

  • @tinajustme1655
    @tinajustme1655 7 років тому

    Daniel Alcock LOOKY!

  • @Nttt739
    @Nttt739 9 місяців тому

    Sir, i see this is five years ago, i have a question . I have to do a similar 2 foot high stem wall for an addition. This is the only stem wall footer combo ive seen .so, you guys formed slightly below grade and let the bottom partially fill trench. You poured bottom to base of forms first . Did you have a cold joint or did you come behind and make it into one?????

    • @daveosland3199
      @daveosland3199  Місяць тому

      Sorry for the late reply-
      As soon as the footing is poured to the bottom of the formed stem wall, you can generally go back to the starting point of the pour and top off the stem, as the concrete has had several minutes to stiffen up enough to support the wet mud in the stem forms. Dave

  • @bigbankhank1337
    @bigbankhank1337 Рік тому

    Curious, is it a big deal if the wall shifts a little while pouring? I mean maintaining level height and corners I’m sure are most important but what if one of the sides bows a little? Building a footing for my shop in the woods now and trying to figure this out. Thanks sir

    • @daveosland3199
      @daveosland3199  Рік тому

      Hey, Hank!
      if 45 degree "kickers" (diagonal braces) are placed every 3-4', on both sides of the forms, movement should be nil..
      Dave

  • @stephenwhite6437
    @stephenwhite6437 6 років тому

    thak you the did jues but jues bee good god jues for now thak you thak you

  • @glhfsport4682
    @glhfsport4682 4 роки тому

    do you think it would be possible to pour a stem wall, fill the inside with dirt, and then pour an elevated slab to the height of the stem wall?

    • @daveosland3199
      @daveosland3199  4 роки тому +1

      Good question!
      Yep!! Done it numerous times. If I do one in the future, I'll post a video of it!
      Dave

  • @MooreProCrete
    @MooreProCrete 6 років тому

    Nice video. I'm assuming being in Calli your local codes only require 12" or 18" footing? Must be Nice! Here in Jersey everything is 32" to 36" minimum. Anyway, Nice form work!

    • @daveosland3199
      @daveosland3199  6 років тому +2

      Yep, 12x12" for a single story,15x15" 2 story and 18x18" 3 story footings, unless soils reports dictate otherwise.
      6", 8" stem wall thickness for 1 and 2 story, generally. With so much engineering nowadays, we get all manner of foundations. Pre-stressed slabs seem to be gaining popularity as a way to avoid "engineering" of the soils- excavation/recompaction in lifts, importing soils, etc...
      Unless your up in the high elevations, heaving soils due to "frost line" isn't a worry, hence shallower footings.
      Basements? Almost unheard of round' here!!
      Dave

    • @daveosland3199
      @daveosland3199  6 років тому +1

      Oops! Brain Fart!! 2 story is 15" wide x 18 deep. 3 story is 23" min. width. Although footing depths will vary, it is curious that in many cases only a 6" concrete footing thickness may be required at the bottom of those depths (as opposed to filling the whole footing with concrete)! Where it gets crazy is the amount of steel that can be required. The latest plans I've worked on include 5"x5" plate "washers"on the mud sill!!!
      Dave

  • @AraP24
    @AraP24 Рік тому

    Are kickers required to be on both sides of the board? My concrete contractor wants to charge extra because my plumbing contractor disturbed the boards when trenching for plumbing but he only had kickers on one side to begin with.

    • @daveosland3199
      @daveosland3199  Рік тому +1

      Good question!
      Kickers should be on both sides, so as to resist movement from both sides or directions.
      Dave

  • @scottH18370
    @scottH18370 3 роки тому

    The form boards now would be close to three $3000

    • @daveosland3199
      @daveosland3199  3 роки тому

      Yea, someone is making some $$$.
      I would think about using concrete block now ( i posted a video on the plan details for that). As for the form boards, I always try to design the house so as to use the form boards in the floor framing. You're going to have to spend the bucks on them any way or pour a concrete floor/slab foundation. Concrete ain't cheap anymore either-Dave

  • @troycarpenter3675
    @troycarpenter3675 8 місяців тому

    Nice

  • @kevinbarron310
    @kevinbarron310 4 роки тому +2

    Why do you poured the first nine yards of concrete all the way around the bottom of the form first instead of filling the form to the top as they went along?

    • @daveosland3199
      @daveosland3199  4 роки тому

      Good question!
      The footing mud needs to stiffen up for a while to prevent the pressure from the stem wall mud blowing the footing out and allowing the stem mud to billow down into the footing...
      I'll bring the mud up to the bottom of the stem wall with the 1st truck (generally 9 yards). By the time the 2nd truck arrives and we start pumping, the concrete where we 1st started has set up enough to allow the 2nd lift to top off the stem wall without blowing out...
      Dave

    • @lumberjackdreamer6267
      @lumberjackdreamer6267 3 роки тому

      @@daveosland3199
      Do you vibrate the concrete?

    • @daveosland3199
      @daveosland3199  3 роки тому +1

      @@lumberjackdreamer6267 We use different methods to "settle" the concrete.-
      Can be as simple as tapping the forms with a hammer, often using a 1x2 stake to rod the mud, or in places that are tight or suspect, quickly plunging a vibrator into the mud. Notice the word quickly- a few seconds too long can send the concrete billowing out of the bottom of the forms....

    • @lumberjackdreamer6267
      @lumberjackdreamer6267 3 роки тому

      @@daveosland3199
      Thanks. I have been using a vibrator on sono tube piers (dug with auger, 48” deep by 10” wide). I kept with vibrator for a long time, maybe too long? But my mud was also maybe too thick, didn’t flow well. It’s my first time doing concrete.

    • @lumberjackdreamer6267
      @lumberjackdreamer6267 3 роки тому

      @@daveosland3199
      Your videos are very informative. Thanks.

  • @brendabickerstaff1008
    @brendabickerstaff1008 4 роки тому

    That looks really good!
    Just wondering what state was that garage and house?

  • @mlarle
    @mlarle 6 років тому

    can you wait a day , to pour the the rest of the stem wall after you fill the bottom '?

    • @daveosland3199
      @daveosland3199  6 років тому

      "Concrete waits for no man" The vertical stakes would be locked in place if the pour was dragged out, with this method.
      Other forming methods might allow for staged pours- Concrete block, ply forms with snap ties, etc...

    • @Steven-wm9vu
      @Steven-wm9vu 3 роки тому

      @@daveosland3199 Actually this video is super misleading stem wall and monolithic are TWO ENTIRELY DIFFERENT types of slabs...... Stem wall foundations are very much done in TWO pours.

  • @kam3410
    @kam3410 5 років тому

    Whats the pros and cons on a stem wall vs a post tensioned slab?

    • @daveosland3199
      @daveosland3199  4 роки тому

      Good question!
      i like raised wood floors (stem wall foundation)- Easy access to underfloor plumbing/mechanical for servicing/remodeling, can insulate (warm floors), can be less moisture infiltration as can happen thru concrete slabs.
      Traditionally, slab construction has been cheaper than stem walls, but the additional engineering in modern slabs seems to make it a wash in many circumstances...

  • @cagaleched3459
    @cagaleched3459 Рік тому

    In California, theres no competicion, theres lots of work for everyone..

  • @garryladner1063
    @garryladner1063 7 років тому

    how about a gore on 26 inch.round duct. can you show me how to do that?

    • @daveosland3199
      @daveosland3199  7 років тому

      A 26" gore?? I've laid out smaller ones on paper for templates, but you probably can lay it out on a 4x sheet of metal. I like a dry erase pen for easy cleaning up of mistakes when laying out...
      Let us know what worked for you- Dave

  • @mikeso5963
    @mikeso5963 7 років тому +5

    how long do you wait to take the vertical stakes out after pouring?

    • @daveosland3199
      @daveosland3199  7 років тому

      As soon as possible! As soon as the forms have been topped off and screened, I usually start pulling! It gets really ugly if you wait too long....

    • @pacquetman
      @pacquetman 7 років тому

      So you rely on the form ties to hold the shape of the stem wall ... the stakes are only to locate the form. Will the voids left by the stakes fill themselves or do you have to fill them individually?

    • @daveosland3199
      @daveosland3199  7 років тому

      Yep, the form ties and lumber hold the concrete in place. We don't fill the 1x2 voids left by the stakes, the backfill grading against the stem wall takes care of that.

    • @davidosland1440
      @davidosland1440 6 років тому

      Not very long, usually just after we top and screed the stem. A couple of hours, tops.You can't wait too long or you'll have to break off the stakes rather than pull them.....

    • @Cormack88
      @Cormack88 6 років тому

      At first I thought what the heck why use a screw gun but the way you guys did it actually was nice to learn :)
      Out of curiosity how do you guys charge someone to do a job like this? Is it done by the sqft of the foot print of the structure or outer surface area of the walls?

  • @jayvirk8589
    @jayvirk8589 4 роки тому

    men where in california i live in california what city i wana do a foundation with u i like how u explain things never did one before i wana learn

  • @stephenwhite6437
    @stephenwhite6437 6 років тому +1

    thak you good jues but for we was bee jues now thak you thak you thak you and jues

  • @stflat4667
    @stflat4667 5 років тому

    Dave, how long between footing pour and stem wall pour? Thanks

    • @daveosland3199
      @daveosland3199  4 роки тому

      Usually by the time the footing is poured (usually 30-45 minutes) you just continue on up with the stem walls.

    • @regw8322
      @regw8322 4 роки тому

      @@daveosland3199 Thanks for the great video Mr Osland. I'm curious though, and maybe I missed the reason why,.but you didn't need to form up a footing. You just let it flow out the bottom when you pour the stem wall? (I ask because I'd rather do that than form a footing for my 24'x24' cabin tin the PNW.)

    • @daveosland3199
      @daveosland3199  4 роки тому +1

      @@regw8322 The walls of the dug footing themselves are the "form"....

    • @daveosland3199
      @daveosland3199  4 роки тому

      @@regw8322 Yep- It just flows into the footing, and then up into the formed stem wall.
      The trench (18x18") forms the footing- no need for any forming. Generally hang the stem wall boards about even or a couple of inches below/into the footing trench.

  • @iflytango
    @iflytango 4 роки тому

    Dave, do you know how high a stem wall can be poured before it needs engineering

    • @daveosland3199
      @daveosland3199  4 роки тому

      Code section 404 shows up to 9' tall with a 12" thickness, but every application can be different and often engineering is required on walls much less than that depending on each circumstance.
      For the past several years nearly any project I've done (in bureaucratic California) required engineering.

    • @iflytango
      @iflytango 4 роки тому

      @@daveosland3199 yes I'm in northern California someone told me 6 feet without engineering then just build a 4 foot pony wall on top of that. This is for a daylight basement foundation. Thanks for getting back

  • @whatchinmewatchu7031
    @whatchinmewatchu7031 5 років тому +1

    No vibrating? Top of your mix looks rough . Vibrating will bring the cream up for a better surface to build on

    • @davidosland1440
      @davidosland1440 5 років тому +2

      we do vibrate, hammer tap the forms and vertically rod the mud. Only so much is shown on the video, as I'm busy on the pour and not trying to make a "groomed" video...Dave

  • @gregswhier2850
    @gregswhier2850 6 років тому

    Didn't see exterior drainage outside and below the foundation.

    • @davidosland1440
      @davidosland1440 6 років тому

      You're right! The soil there was extremely well drained sandy loam, and no need for any drainage. Finish grade is sloped away from foundation to eliminate any pooling adjacent to the house-

    • @davidosland1440
      @davidosland1440 6 років тому

      A finish grade is done after the foundation is complete, generally a 2-5% grade away from the foundation, usually for at least 5'. Since I generally don't excavate on the interior area, and we aren't in clay, no drainage is needed below the foundation or structure.- Dave

  • @smallnuts2
    @smallnuts2 2 роки тому

    I'm just learning about this. I was wondering, are the wood footers saved for future jobs? Or does a lot of it get thrown out do to holes, weathering etc?

    • @daveosland3199
      @daveosland3199  2 роки тому +1

      Good question! We'll use as much as possible in the subfloor framing, joisting, rafters ,blocking etc...
      I've a subfloor framing video showing the reuse of the form boards.. Dave
      ua-cam.com/video/4xMSep0uiRs/v-deo.html

  • @patriccrigler7981
    @patriccrigler7981 3 роки тому

    Trying to find out what a foundation like this cost per ft

    • @daveosland3199
      @daveosland3199  3 роки тому

      Good question!! Around $15/sq.ft. but that can widely vary depending on layout, lot slope, engineering, etc...

    • @patriccrigler7981
      @patriccrigler7981 3 роки тому

      @@daveosland3199 thank you, if you dont mind, is it 15 x total of house sq ft or wall

    • @daveosland3199
      @daveosland3199  3 роки тому

      @@patriccrigler7981 1500 sq ft home x15$/ft-
      But there are so many variables that can effect cost...
      People always ask- "So you're a contractor- How much does a house cost per sq. ft"?
      I answer- "Are you talking a Ford Escort or a Mercedes 500SL???"

  • @xyrushex7118
    @xyrushex7118 3 роки тому +1

    does the concrete not need to cure?

    • @daveosland3199
      @daveosland3199  3 роки тому +1

      Concrete starts"curing" the minute it's poured.
      in warmer weather it can set hard in a short time.
      Learning how to "read" the setting/curing time comes with experience. There's a relatively short period in which concrete can be "worked"- troweled smooth, necessary stakes pulled, etc..
      Concrete poured in Hoover Dam decades ago is still curing!!- slowly getting harder with age!!
      Most concrete is considered to have reached it's "working" strength in 28 days after pouring..
      Dave

    • @xyrushex7118
      @xyrushex7118 3 роки тому

      @@daveosland3199 Wow that's crazy!!! thx for the info!!!

  • @candisbrendel7396
    @candisbrendel7396 6 років тому

    that is going to be one little house!! HELL THE GARGE IS LIKE HALF the space, well euro's say AMERICANS love there cars guess they are right!!

    • @davidosland1440
      @davidosland1440 6 років тому

      it's a 2 story- 1500' conditioned space + the garage....

  • @yanhu2011
    @yanhu2011 5 років тому

    Great video. We are installing a 350 sq ft foundation with stemwall/crawl space to support a 2 story addition. Plans are approved. Looking for a masonry contractor to help us to get foundation done. Do you have a contact?

  • @alfmuss3
    @alfmuss3 3 роки тому

    Why not just punch 12" pier holes for your grade beams 6' o.c. We built subdivisions this way in Fremont, Ca. for Citation Homes and Golden State Framers.

    • @daveosland3199
      @daveosland3199  3 роки тому

      Hi "John"-
      Depends on the soil and your engineer.
      I've done em' both. The pier and grade beam type has been more money.
      One less subcontractor/supplier to wait on-
      the rebar supplier that forms and ties the spiral cages, etc..The engineers I've used go crazy with the amount of rebar.
      I'm sure you found ways to streamline the process if you did them repeatedly!
      Dave

  • @robertobarrera245
    @robertobarrera245 4 роки тому +3

    How do I fix a 10 by 12 broken fence

    • @yahirc2470
      @yahirc2470 4 роки тому

      dis foo 😂 I thought you spun around

    • @yefrym1638
      @yefrym1638 4 роки тому

      Ayy I had the same question, maybe Dave can help us

  • @jesseteick891
    @jesseteick891 5 років тому

    That's a garage and a house?

    • @daveosland3199
      @daveosland3199  4 роки тому

      Yes, attached garage w/ 2 story house.
      Dave

  • @n.elosangeleskennels9062
    @n.elosangeleskennels9062 4 роки тому

    How much did you charge

    • @daveosland3199
      @daveosland3199  4 роки тому

      Costs vary on site, layout complexity, engineering involved, etc..
      There's no set formula I've found you can accurately get out of a book...
      Dave

    • @Steven-wm9vu
      @Steven-wm9vu 3 роки тому

      @@daveosland3199 They asked how much you charged for THIS job though. You can def tell us how much you charged for THIS JOB... I'm betting around 10-12k..

  • @QuickFamily8144
    @QuickFamily8144 4 роки тому

    Hoping you are still monitoring comments. I live in Iowa, and am getting ready to build a new garage, and want to get it up in the air a bit. My garage is going to be 24x28. Code here calls for a 4 inch floating slab with a 6x6" thickened edge. What I want to do is pour a "6 W x 20" H wall and then come back and pour a 4" floating slab, leaving 10" of the wall exposed from top of slab. I will build the garage on the wall. Reason I ask if that sounds reasonable is because I have had 3 contractors out to bid, and three different opinions, and they all have 10-30 years of experience. One wants to pour monolithically, all in one. One wants to pour slab with 1/2" rebar sticking up, then form and pour stem wall on edge of slab, the other one agrees with me. So....I turn to UA-cam, naturally. :-)

    • @daveosland3199
      @daveosland3199  4 роки тому +1

      Hi Ryan-
      Like they say, more than 1 way to skin a cat...
      A monolith pour 20" off grade is a lot of form/fill work to get that high in one shot.
      Myself, I would pour a 12" x 12" footing- code minimum for a single story building, either incorporating the stem wall as a monolith pour, OR
      pour the 12x12" footing with #4 rebar sticking up every, say 24"o.c., followed by a 8-8-16 CMU block (I love "speedblock" which requires no end buttering with mortar) stem wall.
      Once the block is concrete filled/poured, back fill the garage area with compactible fill, lay a grid of rebar and pour the slab.
      I recently posted this design after questions just about this method- This is a way to get an elevated slab.
      ua-cam.com/video/9gC9BwwVjo4/v-deo.html
      You can also get a glimpse of the monolith poured footing/stemwall followed by back fill and a slab in another posted build-
      minute 1:50 on-
      ua-cam.com/video/FbYrGaoWIec/v-deo.html
      Let us know what you end up doing!
      Dave

    • @QuickFamily8144
      @QuickFamily8144 4 роки тому

      @@daveosland3199 thank you. 4th guy came today. 30 years of experience, and wants to pour the slab with a 6"x6" thickened edge so 10" overall, with rebar sticking up, and lateral 1/2 reinforcement, then come back and pour the wall which will be formed on top of the slab. Second guy to recommend that, so think that we'll do that.

    • @daveosland3199
      @daveosland3199  4 роки тому +1

      @@QuickFamily8144 Sounds good!
      Dave

    • @QuickFamily8144
      @QuickFamily8144 4 роки тому

      Is there a way to protect against wall seeping where the slab and separately poured stem wall meet?

    • @daveosland3199
      @daveosland3199  4 роки тому

      @@QuickFamily8144 Hi Ryan
      If the slab is elevated to 20" above the footing, it shouldn't be an issue.
      When pouring 20 foot high concrete tanks, we've sandblasted between 4' lifts to ensure a clean bonding surface to prevent leakage, but that would be unnecessary in your case.
      Dave

  • @jamieofalltrades536
    @jamieofalltrades536 4 роки тому

    You can stagger all you want, but unless you place a stake at the seams of your forms they are still a weak point, just saying ;)

  • @OgedayKhan
    @OgedayKhan 3 роки тому

    Woods is very expensive in my Country, because there not like a North America industrial forests,, Economically good profits woods importing from Russia and China,, You guys so likely has Alaska and getting Amazon forest also easily all America is lucky about woods as per to middle eastern market... If I am in USA I can play from woods to the make my house ,,

    • @daveosland3199
      @daveosland3199  3 роки тому +1

      Hi Ertugrul-
      Here in the U.S., though we import some woods, we also have many forests.
      Thank you for watching the video! Dave

  • @faridboucetta9419
    @faridboucetta9419 2 роки тому

    TU PARLE TROP AU LUI QUE TU TRAVAIL LES CHINOIS ET LES VIETNAMIEN MIEUX QUE TOI

  • @AllAccessConstruction
    @AllAccessConstruction Рік тому

    Excellent job