DBM/BC work at Site

Поділитися
Вставка
  • Опубліковано 7 лют 2025
  • Dear Friends,
    This video is regarding DBM work in highways, including material, machinery and manpower required. Uses of Tractor compressor, paver, dumper, tandem roller, PTR( pneumatic tyre roller), water tanker, tack coat/ primer sprayer etc . Actual work at site.
    1 Expansion joint on Major Bridges
    • Expansion joint on Maj...
    2 (RMC)Concrete Batching Plant in construction industry
    • (RMC)Concrete Batching...
    3 Vertical Pile load test by Static Method
    • Vertical Pile load tes...
    4 Piling in Engineering Construction of Bridges
    • Piling in Engineering ...
    5 RE Wall Re-Construction
    • Damage RE wall ko ES t...
    6 DLC & GSB In road construction
    • DLC & GSB In National ...
    7 Railing in MNB/MJB (Footpath)
    • Railing in MNB/MJB (Fo...
    8 Precasting in Construction
    • Precasting in Construc...
    9 Construction Methodology of geocell lined slope
    • Video
    10 H.D.tower detail colour coding
    • H.D.tower detail colou...
    11 Carpentry must watch for civil engineers
    • Carpentry must watch f...
    12 Formwork, Scafolding for Structures
    • Formwork, Scafolding f...
    13 RE wall
    • RE wall
    14 RE wall geo-composite
    • RE wall geo-composite
    15 RE wall coping
    • RE wall coping
    16 RE wall (Reinforced Earth wall) part 2
    • RE wall (Reinforced Ea...
    17 RE wall construction very easy steps.
    • RE wall construction v...
    18 Sand Screening plant for construction industry..
    • Sand Screening plant f...
    19 For latest crazy tech & trending news
    thecrazeclub.c...
    20 Site Work and MMM used in DBM
    • DBM/BC work at Site

КОМЕНТАРІ • 324

  • @easyconstruction3066
    @easyconstruction3066 4 роки тому +7

    Whoever giving info is well experienced and covered all aspects

  • @gauravchaturvedi6080
    @gauravchaturvedi6080 3 роки тому +7

    1. Air compressor is used to remive dust and small interfering particles
    2. Firstly, Prime coat is applied over its previous GSB layer (Granular Sub Base) to make good bonding among Aggregates used in GSB layer and so that they don't move when Base Layer is poured over them.
    3. Then Tack Coat is used to make base layer ready for better adhesion with upcoming bitumen Surface layer (wearing surface), if needed, micro surface sheeting can also be used in areas of high annual Rainfall to prevent water going inside 🤗👌

    • @MS-qm2hj
      @MS-qm2hj 2 роки тому +1

      I think prime coat is applied over WBM or WMM layer not on GSB layer

    • @gauravchaturvedi6080
      @gauravchaturvedi6080 2 роки тому

      @@MS-qm2hj na bhai, prime Field pr GSB k upar hi apply krte h and existing surface par Tack coating for upcoming Overlay

    • @SanjayGupta-yw2jf
      @SanjayGupta-yw2jf 9 місяців тому

      Prime coat is applied over WMM to stop the moisture of WMM into BM or DBM. And the Tack coat is used as a binder between BM/DBM and SDBC/Surface . And finally seal coat is sprayed over SDBC/ final surface as waterproofing

  • @shalugautam9130
    @shalugautam9130 4 роки тому +1

    Good very nice video

  • @SurendraKumar-ke9iu
    @SurendraKumar-ke9iu 5 років тому

    सर आप बहुत ही अच्छी तरह से समझते है आप अधिक से अधिक वीडिया बनाया करे । धन्यवाद सुरेन्द कासगंज

  • @natvarsinhzala3122
    @natvarsinhzala3122 3 роки тому

    Plz sir aese or knowledgable video banao plz🥰🥰👌👌👏👏👏

  • @Krsachinlearningpoint
    @Krsachinlearningpoint 5 років тому +1

    Bahut acchi jankari mili

  • @mebinglapung3405
    @mebinglapung3405 4 роки тому

    Your explanation is crystal clear...very well explained...

  • @kianleena
    @kianleena 3 роки тому

    Keep up the best work👍👍

  • @gauranggshah7135
    @gauranggshah7135 3 роки тому

    Good initiative

  • @sunilnegi5966
    @sunilnegi5966 4 роки тому

    Very good bhai ji

  • @anindyapurohit1991
    @anindyapurohit1991 5 років тому +1

    verry good road way industry work big network of india nice 😍😍

  • @acecivil
    @acecivil 4 роки тому

    Very nice video.. Greetings from other Civil Engineering UA-cam Channel..

  • @vikrantsingh2204
    @vikrantsingh2204 4 роки тому +1

    Sir mujhe bahut achha lga aapka video dekh ke
    Sir mai btech kia hu
    Mujhe puri knowledge chahiye road ki starting se end tk ka
    Plz help me sir
    Aapki bht kripa hogi sir plz
    Meri vinti hai aapse

  • @K.Surendra-CE
    @K.Surendra-CE 3 роки тому

    This video is very useful to all of us

  • @MithleshKumar-xg3tx
    @MithleshKumar-xg3tx 4 роки тому

    Thank u so much sir for such informative video ,pls aise video bare rahiye

    • @MithleshKumar-xg3tx
      @MithleshKumar-xg3tx 4 роки тому

      Please aise videos banate rahiye sir. Aur road Ka technical term v bata dijiye

  • @thondupandrugtsang
    @thondupandrugtsang 5 років тому +1

    Excellent explanation. Really enjoyed the video. Jai Hind.

  • @anilkumarvishwakarma5145
    @anilkumarvishwakarma5145 2 роки тому +1

    Prime cot tack cote ka temperature laying time kitna hota hai

  • @rizwanmughal1912
    @rizwanmughal1912 4 роки тому

    Good information

  • @parveenjoshi6174
    @parveenjoshi6174 5 років тому +1

    Very nice video

  • @jagatrajchauhan5138
    @jagatrajchauhan5138 3 роки тому

    Nice

  • @Rahulsahu-di6ye
    @Rahulsahu-di6ye 4 роки тому +1

    Sir pls aap road construction mai kite test hote hai iska detail video bana dijiye

  • @hardikpatel8474
    @hardikpatel8474 5 років тому +3

    Sir basic ek theretical video banao Jo highway ki DPR se lekar final public ke lie open ho tab Tak ki processor...it will be help in any highway interview a lot

  • @aurosrinivas
    @aurosrinivas Рік тому

    Good job

  • @sanjeevpandey4374
    @sanjeevpandey4374 6 років тому +1

    Good job Bhai video banae raho

  • @shubhamshukla1548
    @shubhamshukla1548 5 років тому +2

    Thank you so much for this video..... Very knowledgeable

  • @R.V.Singh11
    @R.V.Singh11 2 роки тому

    Good 👍🏻

  • @mahajan..5299
    @mahajan..5299 6 років тому +2

    Good video

  • @manohardhotre7184
    @manohardhotre7184 2 роки тому +2

    Sir, DBM matereal How mach one cub. M. How mach tone

  • @subratabrahmachari7140
    @subratabrahmachari7140 5 років тому

    Very good

  • @Abhinavkmr
    @Abhinavkmr 4 роки тому +1

    nice

  • @harshrathod3580
    @harshrathod3580 4 роки тому

    Traverse jont aur longitudinal joint kese karte hai... samjavo

  • @er.thakurmanohar2591
    @er.thakurmanohar2591 6 років тому

    Bohot bohot badiya

  • @mehmasingh8874
    @mehmasingh8874 5 років тому

    Thanks sir and please upload more videos like this

  • @vankarvijay5881
    @vankarvijay5881 3 роки тому +1

    Thank you sir

  • @kianleena
    @kianleena 3 роки тому

    Thank you for the knowledgeable information 👍

  • @eng.aminul3922
    @eng.aminul3922 Рік тому +1

    Is it necessary to more thickness asphalt laying pavement? Like if our requirement 50 mm thickness asphalt after Compaction how much we have to put when we are laying pavement.

    • @DEofficial88
      @DEofficial88  Рік тому

      Good question
      15-20% of thickness
      In trial streach we decide.

  • @mjsg8476
    @mjsg8476 4 роки тому

    Trucks are doing their work fully.

  • @bmspahroo9739
    @bmspahroo9739 3 роки тому

    U r awesome ...

  • @akhandpratapsingh5641
    @akhandpratapsingh5641 3 роки тому

    Sir aap se request h ki kisi bhi 4line ki vidio 1st level se lekar last level tak ka kyo ki es line me kam karna h plz help me sir

  • @mr.perfectpraveen6243
    @mr.perfectpraveen6243 5 років тому

    Very knowlageble video sir , Thank you so much

  • @ranajitprasad2092
    @ranajitprasad2092 3 роки тому

    पहले लेयर के साथ जो vertical joints हो रहा है उसका edge कटिंग करना चाइए ya नही? यह फिर edge को blue lamp se गरम करना चाइए?

  • @bilalz4091
    @bilalz4091 4 роки тому

    DBm may kounsi metal use kartye hai sir plz bolo

  • @utpalbiswas6292
    @utpalbiswas6292 2 роки тому

    Nice...

  • @limayaden2995
    @limayaden2995 6 років тому

    Good simple commentary. Thanks.

  • @vinayjhinkwan4233
    @vinayjhinkwan4233 4 роки тому

    TOO GOOD A VIDEO

  • @devidasgaonkar2553
    @devidasgaonkar2553 3 роки тому

    Road tayyar hone ke bad kitane din ke ander pani gire to Road kharab hota hai..?

  • @PhysicWorld9847
    @PhysicWorld9847 4 роки тому +4

    HELLO SIR , PLEASE MAKE A VIDEO ON THE TOPIC ARE :- (1) HOW TO SHIFT TBM .
    (2) HOW TO SHIFT FLY TBM .
    (3) HOW CHECK THE REQUIRED EXCAVATION LEVEL BY MAIN TBM OR ALSO ANY ONE FLY TBM VALUE .
    (4) HOW TO CHECK THE TOP AND BOTTOM LEVEL OF ANY EARTHCRUST LAYER BY MAIN TBM OR ALSO BY ANY ONE FLY TBM .
    (5) HOW TO CALCULATE THE QUANTITY OF EACH AND EVERY EARTHCRUST LAYER BY USING THE OGL DATA WE ARE TAKING FROM INITIAL STAGE OR BEFORE EXCAVATION STARTS.
    (6) HOW TO MAKE EXCEL SHEET FOR THESE ALL WORKS AND CALCULATE .

  • @user-zs7ym7ev6l
    @user-zs7ym7ev6l Рік тому +1

    Sir Please give details of
    Rolling pattern &
    Joints

  • @ndtech8170
    @ndtech8170 4 роки тому

    Thank you.. Informative video

  • @004hiren
    @004hiren 4 роки тому

    Sir I have a project where v have excavated 2 ft of black cotton soil and filled it with murrum then road rolled and compacted on that wbm 100 mm layer on that again wbm 75 mm layer now for the final wat you suggest shall I clean it perfectly apply tack coat lay 1 no mettle layer and then apply tackcoat and lay grit bituminous carpet on that

  • @nareshchouhan6579
    @nareshchouhan6579 4 роки тому

    Dipp chek kese karte hai Sir Please btana

  • @manishcivil8979
    @manishcivil8979 6 років тому +2

    Nyc Bhai

  • @kiranpadiyara
    @kiranpadiyara 3 роки тому

    Super

  • @madangupta7611
    @madangupta7611 3 роки тому

    DBM or BC karne se pahle machine me senser kaise set karenge sir

  • @mdirfanansari3873
    @mdirfanansari3873 6 місяців тому +1

    Maximum Bitumen Kitna Digree Hota hai

  • @itsmukulg
    @itsmukulg 4 роки тому

    Bitumen concrete road pa video hai

  • @AshishKumar-sj8mt
    @AshishKumar-sj8mt 5 років тому

    Rod survey bataye kaise kare.

  • @e..4156
    @e..4156 5 років тому +3

    Sir
    road Geometrics and Highway alignment ke bare me bataye sir...........

    • @aspirantcivilengineers
      @aspirantcivilengineers 3 роки тому

      Road Geometry following terms are obtained.
      1) Super elevation
      2) Camber
      3) Slope/ Gradient
      4) width of carriageway
      5) formation width
      6) Sight Distance
      7) Curve Radius

  • @erdheerajjadhav6895
    @erdheerajjadhav6895 4 роки тому

    Sir sensor paver me sensor ki arrangements detail me bata sakte hai ka i mean camaber and all arrangements plzzz...

  • @rgrajesh8153
    @rgrajesh8153 5 років тому +2

    Bhayya I have a doubt
    1) there is no safety for laying traffic vehicles are coming on laying surface
    2) before laying it should be complete shoulders there is no shoulders preparation
    3)in my observation there is no edge cutting happen in center
    4) vehicles are not covered with tarpaulin so that temperature will reduce
    Awaiting for your reply
    Thank you

  • @civildna1373
    @civildna1373 5 років тому

    Sir yh payg kyse dete hai , please sir mujhe janna bhut argent hai

  • @ysh03
    @ysh03 5 років тому

    You are very helpful for us. Thank you sir

  • @arunbhuyan7843
    @arunbhuyan7843 6 років тому +4

    Sir ji thank you. Sir kitna square meter me kitna tone ya brass DBM lagega please explain kijiye sir please

  • @Agriculturebooksreview
    @Agriculturebooksreview 6 років тому +8

    बहुत ही खूबसूरत से आप ने बताया सर् बहुत बहुत धन्यवाद
    आप से निवेदन है जो सरचना आप दिखाते हो उसे बिल्कुल नेदिक से दिखये ओर सभी टेक्निकल पॉइंट पर विशेष फोकस देते हुवे बताये
    धन्यवाद

  • @yameensaifi9421
    @yameensaifi9421 2 роки тому +1

    Sir eta kese Hota hai

  • @pjvarasada
    @pjvarasada 3 роки тому

    Sar, please tel,how to fix design level of w.m.m. for sensor paver? String to be provided,on both sides?

  • @shubhamshrivas8813
    @shubhamshrivas8813 5 років тому +2

    Sir paxe pe leval dena or check krne Ka video upload kre starting se TBS se Back side lete se or leval dete tak or chack krne tak

  • @souviksaha6408
    @souviksaha6408 6 років тому +4

    Make construction video on super elevation. How to main gradient on super elevation portion

  • @ShriSneh2412
    @ShriSneh2412 4 роки тому +1

    White powder used after dbm work is what.. is it white cement of lime

  • @manikushwaha1970
    @manikushwaha1970 4 роки тому

    Sir me plant chalana sikhata hu mujhe plant ke bare me kush jankari de sakte hai

  • @VijayKumar-mb5ik
    @VijayKumar-mb5ik 3 роки тому

    Praemcot ke upar taigcot spending ak sath y leayr by leayr hota hai

  • @shubhamdahiphale555
    @shubhamdahiphale555 5 років тому

    sir jo joint rahta h voh kaise karte h aur ek baat bituminous road ki aur detail mein vido kab banane wale ho

  • @noone-vn9kv
    @noone-vn9kv 5 років тому

    Bhai vo DAS hai kya paver me jo baitha rahta hai paver technician

  • @sreeramv9248
    @sreeramv9248 4 роки тому

    Pl give one plan and road section to understand better pl mention thickness.

  • @shindesuraj5017
    @shindesuraj5017 3 роки тому

    If one layer is layed at one side , then another side can be layed by using bed sensor , then why to use the string rods ( peg), at another side. Plz reply.

  • @allmixvideoschannel8108
    @allmixvideoschannel8108 4 роки тому

    Sir ji bc me Kia Kia materiyel hotata h or dbm me Kia Kia materiyel hotata h batao plzz

  • @ashishkatkade7782
    @ashishkatkade7782 4 роки тому +2

    1)What is exact difference between primer prime coat and tack coat ...??
    2) if Temperature is less then is possible that finishing may not achieved

    • @1414gp
      @1414gp 4 роки тому

      primer is a less viscous than tack coat. Primer fills the pores of granular surface whereas tackcoat is layed over prime coat or old bituminous surface to give bond between old bituminous/granular and new construction

    • @آرشآریا-ب3ت
      @آرشآریا-ب3ت 4 роки тому

      Primecoat is the first layer after basecourse which joint basecourse to firstlayer of asphalt and takcoat is joints to layer of asphalt.primecoat is low temprature than takcoat.and the perecentage of oil is less in takcoat

  • @shrikantchaudhari7134
    @shrikantchaudhari7134 5 років тому

    Good evening sir survey ke bare me bataye ke wire par lavel kaise dete hai

  • @MaheshYadav-qq7ln
    @MaheshYadav-qq7ln 4 роки тому

    plz add a video on Construction of plain cement concrete pavement and RCC pavement with joints construction details

  • @bikashgurung1665
    @bikashgurung1665 4 роки тому +1

    Sir i need defenation to prime coat n tack coat

  • @nabamsanju3661
    @nabamsanju3661 5 років тому

    how to check on tickness of aggregates

  • @ramlalsharma6548
    @ramlalsharma6548 4 роки тому

    Please deffrence between BC and DBM

  • @amlanhota9325
    @amlanhota9325 3 роки тому

    Itna thickness me mene ka v bitumen ka road nehi dekha tha sir.

  • @HarshitKS1618
    @HarshitKS1618 5 років тому +1

    Sir, is project ka Equipment schedule share kar sakte hain kya? Road construction main use hone wale equipments ka time cycle and resource allocation kaise karte hain.

  • @hiteshkapruwan9616
    @hiteshkapruwan9616 5 років тому +1

    Sir as a fresher building construction m jyada scope h ya highway construction m ..plz reply ..boht confuse hun🙏

  • @anirudhrana4665
    @anirudhrana4665 5 років тому

    Ek video sensor paver k baare mai bi bnao

  • @ankitsingh-px6lt
    @ankitsingh-px6lt 3 роки тому

    Sir 1 din mein kitna bm bicha sakte hain?

  • @pankajrathore-zh5xe
    @pankajrathore-zh5xe 6 років тому

    sir pag par level kese check karte h ki level ka yhi point dekhna h

  • @yogeshkumar-zy2vs
    @yogeshkumar-zy2vs 3 роки тому

    Technical information bataiye
    Jo side par jee sdo puchhte hai

  • @Sunilkumar-il6it
    @Sunilkumar-il6it 4 роки тому

    Sir
    Please send vidio stablity&flow

  • @atifsheikh8433
    @atifsheikh8433 6 років тому

    Good

  • @maheshvasave2741
    @maheshvasave2741 5 років тому

    Road keyse bonate he aur road ke process ky he

  • @joshibhuwan29
    @joshibhuwan29 5 років тому +1

    Is tack coat required between bituminous macadam and bituminous concrete or semi dense bituminous concrete

    • @DEofficial88
      @DEofficial88  5 років тому +1

      Yes ...if older than 1day
      If freshly laid within some hours then not required...

    • @joshibhuwan29
      @joshibhuwan29 5 років тому +1

      @@DEofficial88 is it written anywhere in irc or any other cide

  • @ranjansharma2754
    @ranjansharma2754 6 років тому

    Marvellous video sir
    Sir ye kon se company ka work h or kaha ka work h jagah kon si h

  • @RakeshKumar-ss9qm
    @RakeshKumar-ss9qm 2 роки тому +2

    Road work is quite difficult, compare to the building work.

  • @rsramesh4447
    @rsramesh4447 3 роки тому

    What's the loose of dBm BC

  • @PradeepKumar-il1gi
    @PradeepKumar-il1gi 5 років тому

    Sir wmm Ka level kaise dete hai esper ek videos bana dijiye calculation kaise karte hai aur stop ki reading ko kaise set karte hai sir please.............sir

  • @Amir4590.
    @Amir4590. 3 роки тому

    What is VTS

  • @ndtech8170
    @ndtech8170 4 роки тому

    What is the per square limit of bitumen spray?? Please tall.

  • @souviksaha6408
    @souviksaha6408 6 років тому +2

    Very good. But sir when mention different types of material also mention the related IS CODE. And also make a video on how to maintain slope in various layer.

    • @DEofficial88
      @DEofficial88  6 років тому

      Ok dear

    • @appasahebshelake5616
      @appasahebshelake5616 4 роки тому +1

      Very good vedio for knowlde.
      1 How many ROLLING pass for BC and DBM.how calculate.
      2.when become segregation how remove it..