Dombivli kalyan are curse towns, every project nearby are delayed. Infact a simple flyover near lodha palawa is delayed by 5 years. Sad to see this state
1.) Not entirely true. This happens in other places as well within MMR region. 2.) There are a lot of technical and law and order issues. So, you just cannot simply chop off forests and destroy settlements.
Hello Droneman, I watch your videos oftentimes and love your work. I would like to suggest you, If it is possible would you please make a detailed video on Rewas - Reddi Coastal Highway. Many of us are unaware of that project, So if it is doable please share with us.
You should have taken video of part from Kalyan shipata road to hedutane ...that work is on and retibandar to Kalyan shilpata...that work is in full swing ...just to satisfy builder lobby I guess 😊
Bahut time se aapki videos dekh raha hu. Absolutely love them & they are super informative! Just one suggestion: please also add a real time map view of the road that you're recording. This will help us visualise the shots with a map & better understand. Varna mujhe baar baar video aur map switch karna padta hai😅 Thanks for the videos brother!
Kindly cover the Kalyan SATIS projet the development of kalyan station and nearby area....5 saal ho Gaye kaam chal hi raha hai ....Mistry project hai ye bhi
Any place beyond Thane, is cursed, not a single project can be completed within 1000 years - Kalwa: Kalwa-Airoli Railway Line. Mumbra: ROB expansion next to the existing one close to Mumbra Station. Diva: ROB next to the Station. West side has no ramp built at all, so trains on all 6 railway tracks are delayed. Kopar: WDFC. Dombivli: Palava city - WDFC and Flyover skipping Palava junction, being built for 7 years ( just to compare, MTHL took 6 years to build and that was 20 km over the sea) Thakurli: An additional ramp to the existing ROB near the station. Kalyan: Expansion of the existing Patri Pul, Metro Line 5 (Bhiwandi to Kalyan stretch), Kalyan SATIS Places beyond Kalyan - adding 3rd and 4th line. Honourable Mention - Diva Platform 1A, only built for roughly 6 to 7 coaches, instead of 12.
Meanwhile it's almost impossible to touch settlements like Dharavi in Mumbai. There are several projects which have faced a lot of delays (even failure for a moment) in Mumbai as well. For eg: Mumbai Monorail.
This road and its surrounding is ideal to have a riverfront project. Nice greenary surrounding the road could be converted into gardens and parks adjoining Ulhas river. Residential areas could then be constructed on left of the road which is visible in some areas.
At a time they are either planning or working on different projects for eg. airoli-katai naka ka aage kuch nahi hua hai. sare projects are in delayed status. ise marathi mein kehte hai ‘एक ना धड भाराभर चिंध्या’
Kalyan Station bridge pe sirf 2-3 log dikhte hain hathoda marte hue, kabhi tak hoga pata nahi 5+ yrs hogaya hai. Full on traffic ho jata hai morning and evening me.
Ground work has not started yet. They will have to build a elevated station at Malad becoz of unavailability of space on west side. Constructing a elevated station will take a lot of time, if it follows the timeline of Kurla's elevated harbour line station (which is still under construction) the extension of harbour line from goregaon to borivali is easily 10 years away.
Project cost ...A Project cost ...B Almost..10 years back delay. Fast city growing city kdmc market .. Govt should work on this project . Gdp &investments &job sector will boom Never Before this game will change
Don't know why but always ulhasnagar ambernath badlapur PPL are neglected...you may check the progress of Indian railways on these side for better understanding
The various gaps in development of this road project is probably due to various landowners / parties approaching Courts for compensation and their cases are pending....It will take long time to decide those cases....
Govt of Maharashtra and KDMC ka yaha ke logo ke saath Sautela Vyavaahar bauhat puraana hai. Sadly yaha ke MLA state govt ko proper Pressurize nahi karte. Same project Navi Mumbai main hota toh State Govt and Cidco kab ka Complete kar deti project.
All infra projects in immediate outskirts of Mumbai city are either delayed or executed in a low quality way so that it will break soon. Can't Mumbai's real estate sharks increase quality of living in Mumbai instead of making government to behave so badly to outskirts? I cannot think of any other reason this is happening in cities in immediate outskirts of Mumbai alone.
Most delayed project hai yeh. Aur iske delay hone ki wajah se Mankoli-Dombiwali connector jo complete ho chuka hai wo abhi tak operational nhi ho paya.
meri shadi or uske baad mere bete ya beti ki shadi hogi tab jaakar ye project pura hoga..... after all we r talking about Kalyan Dombivali Region.........
Looks like work is intentionally left in very small patches without significant reason looking from drone. I think it is simple case of unpaid dues to construction companies. Large parts of the shown road could be completed and started in a month if political will was present
It is a criminal negligence by the authorities. Why a special team is not deployed to remove and resolve the issues. People representative from that region is sleeping I think. 😮
KDMC worst cities to stay idk why people investing here i’m staying here from last 20 years tbh this city is same no infradevelopment small roads no proper connectivity with highways .. local politicians lobby is very strong land acquisition biggest problem
Gaav vali public, gaav vaali mentality, illegal houses, corrupt corporator are curse for Kalyan Dombivli and responsible for delays in such public welfare projects.. 😡😡😡😡😡😡😡
Most bigger work force is from KDMC Region that has developed this dream city called mumbai, but government is neglecting this Region like a hell. Markets of this city are beggars of this city...begging for their own rights. Poor infrastructure, education, medical and toughest daily travels. Political parties must carry forward the fire of people's anger to parliament. That's why they are elected. Sad reality.
This project is stalled because of the people not giving their lands and have gone to the court. There should be a rule in the interest of development that government can take any land for development by paying the compensation as per market value. If the owner of tha land refuse to do so, they should be booked under anti national and should be jailed! Such people are major obstruction in the development of our country!
Amazing corruption as the designed the road to go through 2.5 kms of heavily populated area. Best course of action would be to tunnel their way through as costs will escalate, and there are always genius people who keep on holding in hope of better payout
It's pronounced as KAATAI naka bro. Not Cutai naka. Also despite the spelling, Hedutane is pronounced as Hedusan please note. It's always respectful to pronounce local names correctly.
A couple of years, and it will break SCLR's record. I remember what an absolute nightmare it was.
Dombivli kalyan are curse towns, every project nearby are delayed. Infact a simple flyover near lodha palawa is delayed by 5 years. Sad to see this state
I agree.neglected towns.
Even metro naseeb me nai hai. Places like bhiwandi have multiple bridges and metro
3 rd class cities..sorry to say ..I shifted from Nashik from job ..even people here doesn't want to improve
Useless politics and political leaders are responsible for this sad state
1.) Not entirely true. This happens in other places as well within MMR region. 2.) There are a lot of technical and law and order issues. So, you just cannot simply chop off forests and destroy settlements.
Jab ye road complete hoga tab iski 4 lane choti padengi phir widening shuru hoga 🤣
Car freaks: "Just one more lane bro".
good you're calling it out. People need to see this
Courts, land acquisition, bulldozer 💀
Ye project kabhi khatam nahi hoyega. Court ke chakkar mein phas gaya hai.
Hello Droneman, I watch your videos oftentimes and love your work. I would like to suggest you, If it is possible would you please make a detailed video on Rewas - Reddi Coastal Highway. Many of us are unaware of that project, So if it is doable please share with us.
MMRDA ne Kalyan area ko hmesha se neglect kiya h ,koi dhi jyada dhyan nhi deta is area k development k lie 😢
You should have taken video of part from Kalyan shipata road to hedutane ...that work is on and retibandar to Kalyan shilpata...that work is in full swing ...just to satisfy builder lobby I guess 😊
Editing , captioning location, plan details etc WOW 🤩
Your work is really good my friend!!
इस तरह का land Acquisition देखकर लगता है कि ये प्रोजेक्ट फेल होने वाला है
7 sal huie abhi huva time pura
China me 6month ke under hota 😂
China pasand aaya tere ko....
China Mai no issue of land acquisition
Rato rat Ghar se bahar nikal ke fek dete hai
All lands belongs to government
Forcefully garibacha ghara vr buldozer chalvla asta road cha jage sathi
@@prathmeshpawar4127 Ani so called garib jaga detana nataka kiwa kahi overpriced amount magto
@@prathmeshpawar4127fukat madhe nai chalavla jaat. Paise dile jatat samajla ka.
Bahut time se aapki videos dekh raha hu. Absolutely love them & they are super informative!
Just one suggestion: please also add a real time map view of the road that you're recording. This will help us visualise the shots with a map & better understand. Varna mujhe baar baar video aur map switch karna padta hai😅
Thanks for the videos brother!
Excellent Shoot.
Superb coverage. Hope authorities are doing this endless work
Kindly cover the Kalyan SATIS projet the development of kalyan station and nearby area....5 saal ho Gaye kaam chal hi raha hai ....Mistry project hai ye bhi
Please complete this project as soon as possible. Daily Difficult to traval Titwala.
Any place beyond Thane, is cursed, not a single project can be completed within 1000 years -
Kalwa: Kalwa-Airoli Railway Line.
Mumbra: ROB expansion next to the existing one close to Mumbra Station.
Diva: ROB next to the Station. West side has no ramp built at all, so trains on all 6 railway tracks are delayed.
Kopar: WDFC.
Dombivli: Palava city - WDFC and Flyover skipping Palava junction, being built for 7 years ( just to compare, MTHL took 6 years to build and that was 20 km over the sea)
Thakurli: An additional ramp to the existing ROB near the station.
Kalyan: Expansion of the existing Patri Pul, Metro Line 5 (Bhiwandi to Kalyan stretch), Kalyan SATIS
Places beyond Kalyan - adding 3rd and 4th line.
Honourable Mention - Diva Platform 1A, only built for roughly 6 to 7 coaches, instead of 12.
Meanwhile it's almost impossible to touch settlements like Dharavi in Mumbai. There are several projects which have faced a lot of delays (even failure for a moment) in Mumbai as well. For eg: Mumbai Monorail.
Please make a video on metro line 14 kanjurmarg badlapur and Kalyan badlapur line 3 and 4
As per my knowledge, nothing has started on this line.. even m waiting for the same desperately.
wait till 50 years
Why only 2 lanes each way?? Navi Mumbai se inspiration/planning Leni chaiye year 2000 ke time 3-4 lanes each way banaye CIDCO ne.
Unlike railway line extensions land aquisition is not easy for roads. Navi mumbai is an exception because its a semi planned township
Kindly update on status of kalyan badlapur 3rd 4th line and kalyan yard remodeling also kalyan asangaon and kalyan kasara new railway lines
This road and its surrounding is ideal to have a riverfront project. Nice greenary surrounding the road could be converted into gardens and parks adjoining Ulhas river. Residential areas could then be constructed on left of the road which is visible in some areas.
MMR area needs a massive infra upgrade. Its mumbai's backyard.
No, It will going to break mumbai Goa highway record😢
All because of land not given by locals
At a time they are either planning or working on different projects for eg. airoli-katai naka ka aage kuch nahi hua hai. sare projects are in delayed status. ise marathi mein kehte hai ‘एक ना धड भाराभर चिंध्या’
😂😂😂😂
Please cover Atal Setu to costal road connectivity progress and Plan...
kalyan station k bridge kya progress hai
Usko or 15 saal lagega
Thank you for sharing information
Titwala💀
Aab corruption ke wajese ruka hai aur kuch nahi bass sabko aapni pocket bharni hai jitna lamba project chalega utna paisey ayega corrupted logo ko
It is because of NGO putting cases on trees and NGO involving with locals and putting cases in court not giving lands
Bhai fir maine aapki sabse pehle video dekhi😅😅😅😮😮😮
Missing link update
Please do NH 66 widening Kerala update
work on the stretch from durgadi - mothagaon mankoli has started near railway yard, thakurli. Saw the cement mixers being erected some days ago
Good morning droneman🌄☕
Never ending type project category
Drone Bhai ❤
Please Make video on kalyan station redevelopment and yard remodeling
Kalyan Station bridge pe sirf 2-3 log dikhte hain hathoda marte hue, kabhi tak hoga pata nahi 5+ yrs hogaya hai. Full on traffic ho jata hai morning and evening me.
woh charsi log hn chori karte hn samaan aur raat ko nasha karte hn 🤣
😅
Waiting for harbour line goregaon to borivali progress video 😊😢
Ye to central project hai ..
@@qwerty9889 Western railway
Ground work has not started yet. They will have to build a elevated station at Malad becoz of unavailability of space on west side.
Constructing a elevated station will take a lot of time, if it follows the timeline of Kurla's elevated harbour line station (which is still under construction) the extension of harbour line from goregaon to borivali is easily 10 years away.
Facts. Dombivli Kalyan is really fucked up. About time people call the kdmc govt out
Thanks for this
Wow so much greenery in this area ! But soon it will be lost thanks to unplanned urbanization.
4:05 - road ke side me konsa residential project jaha se ROB complete huha hai,,,look really nice
Surat Chennai expressway or Samrudhi mahamarg kaha Kross hota he
Vasai Virar ringe route update please 😢
Good information.
It has been 4 years, the ROB bridge construction at Regency started in titwala and it's still not operational as other parts are not ready
Bro kaha chale jaate ho I want regular video 😢
Thoda bohot issues chal raha hai life me,, isiliye irregular ho raha hai,, 😌
Jald hi update milega ( Good Newz )
Please cover Atal Setu to costal road connectivity progress.......
Karad to kagal route please review
Project cost ...A
Project cost ...B
Almost..10 years back delay.
Fast city growing city kdmc market ..
Govt should work on this project .
Gdp &investments &job sector will boom
Never Before this game will change
Don't know why but always ulhasnagar ambernath badlapur PPL are neglected...you may check the progress of Indian railways on these side for better understanding
Meanwhile Pune-ring-road crying in the corner...
Make a video on station and bus terminal update
Please capture taloja Kharghar flyover progress
The various gaps in development of this road project is probably due to various landowners / parties approaching Courts for compensation and their cases are pending....It will take long time to decide those cases....
Thank you.
Dear DRONEMAN,kya aap chatrapati Sambhaji Nagar se ho ?
Bhai Woh Bengali hai , Powertrain ka interview nahi dekha kya?
Bengali hain per Bengal se to video nhi banata..voh Maharashtrian hain.., chatrapati Sambhaji Nagar main rehta Hain Shayad😅@@k1342alpesh
Please make video on Mulund Goregaon Link Road update
Sir again asking please please cover pune metro 3
Nilje metro station site kaha hai please make video on latest update metro Line 12
Easily the worst project of MMRDA
Govt of Maharashtra and KDMC ka yaha ke logo ke saath Sautela Vyavaahar bauhat puraana hai.
Sadly yaha ke MLA state govt ko proper Pressurize nahi karte.
Same project Navi Mumbai main hota toh State Govt and Cidco kab ka Complete kar deti project.
Any one know why near durgadi fort construction is deployed?
Mount everest ke upar se drone udao
All infra projects in immediate outskirts of Mumbai city are either delayed or executed in a low quality way so that it will break soon.
Can't Mumbai's real estate sharks increase quality of living in Mumbai instead of making government to behave so badly to outskirts?
I cannot think of any other reason this is happening in cities in immediate outskirts of Mumbai alone.
Politicians and corporators, pls have redbull.
Hey bhagwan, 30 km k liye 8 phases jinme 5 phase mei work start nahi hua, no progress jahan kaam chal rha, isko toh 10 saal aur lagenge.
This is the case in CM's district and CM's MP son's constituency. See the priority. Dombivli and Kalyan are in chaos, forever.
Jai Maharashtra . Isi liye Gujarat or Gujarati sabse aagey hai .
Most delayed project hai yeh. Aur iske delay hone ki wajah se Mankoli-Dombiwali connector jo complete ho chuka hai wo abhi tak operational nhi ho paya.
Palestine 🇵🇸 wala mamla khatam nhi hua abh tak
Missing link update
Gap he o log jagah nahi de rHe 😂
meri shadi or uske baad mere bete ya beti ki shadi hogi tab jaakar ye project pura hoga..... after all we r talking about Kalyan Dombivali Region.........
Looks like work is intentionally left in very small patches without significant reason looking from drone. I think it is simple case of unpaid dues to construction companies. Large parts of the shown road could be completed and started in a month if political will was present
It is a criminal negligence by the authorities. Why a special team is not deployed to remove and resolve the issues. People representative from that region is sleeping I think. 😮
Brother, it's not that easy to do so. Government cannot just simply build routes on houses of people.
Why there are so many ghost towers in this area?
more roads = more traffic
Agar Rajakiya iccha shakati hai to possible hai Magar kisika dhyaan hi nahi hai
KDMC worst cities to stay idk why people investing here i’m staying here from last 20 years tbh this city is same no infradevelopment small roads no proper connectivity with highways .. local politicians lobby is very strong land acquisition biggest problem
Gaav vali public, gaav vaali mentality, illegal houses, corrupt corporator are curse for Kalyan Dombivli and responsible for delays in such public welfare projects..
😡😡😡😡😡😡😡
It will take more than 10 yrs
Pichle das saal se yahi sun rahe hai 😢.
Very much sad 😔 wid the authorities
We r helpless
No one is interested in doing work
All r culprits 😢
Next 10 years tak nai hoga q ki Maharashtra government hamesha ki Tara Kalyan ko nai Dekhthi na Mmrda is se acha he project NHAI ko Dena cahaiye😅
Work has been going on since ages now, taking too long to
Most bigger work force is from KDMC Region that has developed this dream city called mumbai, but government is neglecting this Region like a hell. Markets of this city are beggars of this city...begging for their own rights. Poor infrastructure, education, medical and toughest daily travels. Political parties must carry forward the fire of people's anger to parliament. That's why they are elected. Sad reality.
After some years government will wind up this project.
This project is stalled because of the people not giving their lands and have gone to the court. There should be a rule in the interest of development that government can take any land for development by paying the compensation as per market value. If the owner of tha land refuse to do so, they should be booked under anti national and should be jailed! Such people are major obstruction in the development of our country!
Amazing corruption as the designed the road to go through 2.5 kms of heavily populated area.
Best course of action would be to tunnel their way through as costs will escalate, and there are always genius people who keep on holding in hope of better payout
And people being mislead claiming 4 phases are complete
These projects Never complete, just to show the development happening in the region,
Unclean unhygienic and lack of dust and congestion with no public transport buses
Samajh nahi aata eknath shinde maharashtra ke CM hai ya gujrat ke
It's pronounced as KAATAI naka bro. Not Cutai naka.
Also despite the spelling, Hedutane is pronounced as Hedusan please note. It's always respectful to pronounce local names correctly.
Also KDMC chutiya hai. The worst ULB when it comes to land acquisition
Also KDMC is the worst municipality when it comes to Land acquisition
@@LeCorbussyeir KDMC is worst at every possible job then can do...😂😂
It will take another 20 years
Nitin gadkari shall give instructions to his concern person proper sechdule time line .
🚩✌🌷
30 km in 7 phases 😢😅
Maharashtra needs to do something about the names lmao.