Panvel Karjat Suburban Railway Line | November 2024 Update | Panvel Karjat Rail Line

Поділитися
Вставка
  • Опубліковано 19 січ 2025

КОМЕНТАРІ • 119

  • @hiteshj2110
    @hiteshj2110 2 місяці тому +17

    It's a great opportunity for city planners and landscapers to develop highly planned and sustainable cities along the lines of Japanese, Korean cities since majority of the land is empty, so much space for greenfield development. Authorities shouldn't fall for builders lobby. This corridor looks one of the most promising ones in whole MMR region for high potential and growth factoring close proximity to Navi Mumbai Airport, MTHL, JNPT and closer to Pune as well. They should invite MNCs, Educational Institutes, Health and Research Institutes, etc. They should also invite foreign architects to design proper town planing for this corridor.

  • @advocated.m.shuklgarje1257
    @advocated.m.shuklgarje1257 2 місяці тому +7

    Well-done Jaideep Bandhu. Ram Ram.🙏

  • @swapnilsawant1331
    @swapnilsawant1331 2 місяці тому +34

    Boriwali to Virar 5 to 6 lines update please

    • @prasannask8320
      @prasannask8320 2 місяці тому +5

      5th and 6th line will be a waste of money if done before the 3rd and 4th line between virar and dahanu are completed.
      only then will the 5th and 6th line make any sense.

    • @prasannask8320
      @prasannask8320 2 місяці тому +6

      also until the missing section of 5th line between khar and Mahim is not completed, it wont make any difference.
      if the 5th line gets completed first, a lot of outstation trains can be shifted onto the 5th track ( in both directions as that line is bi-directional with bypass at Borivali, Andheri, Dadar existing and need to create at Bandra.
      that would really be a game changer in Mumbai railways .

    • @omkar2810sarvajanik
      @omkar2810sarvajanik 2 місяці тому +3

      Yes dada

  • @gautamsvaidya
    @gautamsvaidya 2 місяці тому +5

    Most awaited & most delayed project.
    Will be welcome if completes in stipulated time.
    Wish the best to all concerned 👍

  • @ShamerFleet
    @ShamerFleet 2 місяці тому +2

    Nice shooting, nice editing, nice progress ❤❤

  • @paradoxsolitary3362
    @paradoxsolitary3362 2 місяці тому +28

    8:55 Few trains from Khopoli should run through this route -> Khopoli-Karjat-Panvel-HarbourLine-CSMT. For that, provisions should be made to connect the old existing routes to this new route.

    • @prasannask8320
      @prasannask8320 2 місяці тому +4

      i think, ,most of the khopoli trains will be diverted to this route after the panvel karjat tracks gets built. it will save a lot of time for those living in karjat -khopoli region.

    • @pranit77299
      @pranit77299 2 місяці тому +5

      Harbour line me fast local ke liye additional tracks nhi he ise Jada fayda nhi hoga panvel se Thane/kurla ke liye 50 min ke aspas lagte he aur csmt ke liye ek ghante se upar jabtak csmt-panvel fast line nhi hoti tab tak koi fayda nhi

    • @sachinnewaskar1000
      @sachinnewaskar1000 2 місяці тому +3

      The only problem would be karjat panvel belapur kurla cstm corridor will remain as slow train corridor because of 2 lines whereas whereas cstm kakyan karjat corridor will have fast suburban trains. Also kakyan badalaour 3rd and 4th line will extend fast trains till badalaour. Which means the time taken to reach to karjat by both the corridors will remain almost same because of fast line corridor of main line. However frequency of cstm karjat trains would be much higher on panvel karjat corridor compared with mainline kalyan karjat corridor. Cstm karjat distance via panvel is 78 kms whereas as cstm karjat via kalyan is 100 kms.. 22 kms shorter

    • @prasannask8320
      @prasannask8320 2 місяці тому +2

      Kalyan Badlapur section can easily work with just a single bidirectional line to take the load off the current two track section.
      it would be faster and economical to create a bidirectional single line till karjat than to simply have two more lines till just badlapur.
      same goes for Kalyan Kasara section. a single bi directional 3rd line between kalyan and kasara would go a long long way in easing the load from the current two track section.
      same is in use on the western railway from Mumbai central to Borivali. but it is stalled from being fully effective due to a missing section between Khar and Matunga. once that gets built, almost all long distance trains can be diverted to the 5th line ( and 6th line from khar onwards) leaving more slots for fast trains on the fast tracks.

    • @shiva9575
      @shiva9575 Місяць тому +1

      Anyone any idea when there will be fast corridor on harbour line?

  • @jopez1478
    @jopez1478 2 місяці тому +1

    Good video .. n thankyou for the subtitles 👍🏾👍🏾

  • @abubakarshaikh1638
    @abubakarshaikh1638 2 місяці тому +2

    Very nicely explained using arrow and sub titles. Thanks.

  • @pralhadshivalkar2581
    @pralhadshivalkar2581 2 місяці тому +3

    This video is awiting since long period

  • @bhagwankarande680
    @bhagwankarande680 2 місяці тому +5

    I think it will be operational in mid- 2027 😊.....nice videography 📷😍

  • @rameshharer4444
    @rameshharer4444 2 місяці тому +2

    खूप छान माहिती..... 👍

  • @sachinnewaskar1000
    @sachinnewaskar1000 2 місяці тому +1

    Superb presentation, superb drone shots. Really appreciable. The only thing could not be understood is why kalyan yard redevelopment project cannot be presented with the same technique.. Its very important project from the persepective of reducing the suburban travel time on main line

  • @VaibhavBajirao
    @VaibhavBajirao Місяць тому

    One of the best channel

  • @akinomato
    @akinomato 2 місяці тому

    "I've been waiting for this video for a long time.

  • @sandeeppatwardhan1212
    @sandeeppatwardhan1212 2 місяці тому +1

    Good update report!
    After the rainy season, the work has picked up pace, but it is lots of work. I think it will be completed by December 2027 !

  • @IndianRailwaysjourneys
    @IndianRailwaysjourneys 2 місяці тому +1

    Jaideep ji, good update..

  • @Royalgamer7090
    @Royalgamer7090 2 місяці тому +5

    जयदीप काणे साहेब मराठीत विडिओ बनवा हीच नम्र विनंती आहे 🙏😊

  • @arindammahapatra5651
    @arindammahapatra5651 2 місяці тому +5

    0:15 and 0:20 arre mai hu yaha 🤩🤩🤩🤩🤩

  • @suhassphatak2486
    @suhassphatak2486 2 місяці тому

    Very informative vidio.
    Thanks a lot

  • @rahmanfoundation6852
    @rahmanfoundation6852 2 місяці тому

    Best video with ground report

  • @hariprasath7756
    @hariprasath7756 2 місяці тому

    Thank you brother your information.Hat Prasath, Thanjavur City, Tamil Nadu.

  • @sandeshp5300
    @sandeshp5300 2 місяці тому +1

    Nice video dada❤️

  • @sunilmohandas912
    @sunilmohandas912 2 місяці тому +4

    Why Centre not supporting CSMT-Panvel elevated fast corridor ?

    • @Ronakdham
      @Ronakdham 17 днів тому

      Same here Ji we waiting for that Good news brother

  • @pandeyblog1986
    @pandeyblog1986 2 місяці тому

    Very nice information bhai

  • @SSgobtc
    @SSgobtc 2 місяці тому +3

    Needs 2,3 lines in Konkan railway 🚂

  • @girdharadvani2999
    @girdharadvani2999 2 місяці тому +2

    Very good project by railway but we want direct trains between Pune and mumbai in which these ghats must be avoided so that journey becomes fast and less time also passenger train must be started also sahyadri express must be restarted thanks

  • @hardeeppelia2127
    @hardeeppelia2127 2 місяці тому +3

    Will Panvel station be developed in a 13floor building ?

  • @Chordekar
    @Chordekar 2 місяці тому +3

    Virar Panvel local corridor ke bare mein video bnao

  • @chidanandnazirkar7587
    @chidanandnazirkar7587 Місяць тому +1

    Please demand Passenger train to kokan starting from Karjat

  • @sandeshk007
    @sandeshk007 2 місяці тому +4

    December 25

  • @yuvrajsheler337
    @yuvrajsheler337 2 місяці тому +2

    Kalyan asangoan 3rd and 4th line, asangoan kasara 3rd pr video banav

  • @karankoli8740
    @karankoli8740 2 місяці тому +2

    Please make video on Mankhurd metro progress

  • @pratikgawale7973
    @pratikgawale7973 Місяць тому

    Khup chan detail study karun sagli mahiti dili aahe te pn purn route cha drone shots dakhvun

  • @ashwinisawant8655
    @ashwinisawant8655 16 днів тому

    २०२७ पर्यंत हा प्रोजेक्ट पूर्ण होईल काम बघुन तरी वाटत आह😂😊

  • @bhatkantiwithindianrailway9145
    @bhatkantiwithindianrailway9145 2 місяці тому +1

    Please prepare video on updates about Manmad -Indore Railway project..

  • @irfanbargir3207
    @irfanbargir3207 Місяць тому +1

    Akheer main line se kyun nahi Joda gaya subarban stetion banane ki kya zaroorat thi 🤔

  • @suhassphatak2486
    @suhassphatak2486 2 місяці тому +1

    Would like to see video of khar to borivali 5th and 6 th lane work.
    If the vidio is already done please give link to the same

  • @sachinnewaskar1000
    @sachinnewaskar1000 2 місяці тому +1

    Please try to make a vlog on status of 3rd and 4th line work between kalyan and kasara. Its in progress from kasara end

  • @ampm1005
    @ampm1005 2 місяці тому +1

    Jaideep ji how do you pick up these aerial shorts?

  • @skp7772
    @skp7772 2 місяці тому +1

    महायुती आयी तो दो साल में ये रेल लाईन शुरु हो जायेगी

  • @SkylinesConstruction
    @SkylinesConstruction 2 місяці тому +2

    Can you please make a video on how will be the final layout of karjat suburban terminus station!!

    • @yogesh.r
      @yogesh.r 27 днів тому

      I think it'll be serving on Harbour Line trains the CR mainline trains may continue to use the existing stn.

  • @ShivamLifeAnnu
    @ShivamLifeAnnu Місяць тому

    Kya isme 2 new lines ka work chal rha eksath ?

  • @pramodvishwkarma4929
    @pramodvishwkarma4929 2 місяці тому +1

    2027 tak hone ki ummeed hai

  • @niheerthakur1608
    @niheerthakur1608 2 місяці тому +2

    Panvel🚉 karjat new railway line🚊. Panvel railway station is changing and railway connecting. Local rail nazdik single rail karjat. Karjat suburban railway station platform no 1 to 3 new karjat suburban train parking🅿 railway line 3 tunnels and mumbai pune satara highway expressway down panvel karjat up railway crossing. How to change and railway connecting ?

  • @sunilmohandas912
    @sunilmohandas912 Місяць тому

    Make Panvel Terminus a futuristic landmark...

  • @meenamore462
    @meenamore462 Місяць тому

    बदलापूर कासगाव जवळ पडेल का

  • @swastiklad1738
    @swastiklad1738 2 місяці тому +2

    Suburban Terminal? Is it for only local train or for Mail express?

    • @yogesh.r
      @yogesh.r 27 днів тому +1

      Only local trains, hopefully not only for harbour line😂

  • @prashantagarwallbmumbai2016
    @prashantagarwallbmumbai2016 2 місяці тому +2

    Total 3 years more

  • @deepakshinde8985
    @deepakshinde8985 2 місяці тому

    Khopoli railway track to be extend upto sudhagadh Pali.

  • @akshayballal6683
    @akshayballal6683 2 місяці тому +1

    Jyane pan current Karjat station samor property ghetli asel samjun ki local travelling time kami hoil, tyancha motha popat honar ahe in next 2 years.

  • @durveshshinde8006
    @durveshshinde8006 27 днів тому +1

    पनवेल-कर्जत 3. 0 mumbai

  • @APK81
    @APK81 2 місяці тому +1

    December 25 looks doable

  • @akleshjaiswar6132
    @akleshjaiswar6132 2 місяці тому +1

    This project complete in 2028 panvel to karjat line Corridor🎉. Many work is not complete. 🎉

  • @DevendraRawool-o6j
    @DevendraRawool-o6j 2 місяці тому

    any update on will there be any link between old and new terminals at karjat?

  • @shyamsundarwawdane907
    @shyamsundarwawdane907 2 місяці тому +1

    What about Kalyan panvel ?

    • @prasannaiyer4030
      @prasannaiyer4030 17 днів тому

      its lying in dust ...a project of 450 cr was projected woth the viaduct turn over at kalwa to join the trans harbour line .now after 5 yrs no breakthrough ....obviously now the cost muat hv be tripled..this is how govt works 😢

  • @natarajank9789
    @natarajank9789 Місяць тому

    This will be single track or two tracks?

    • @sachinnewaskar1000
      @sachinnewaskar1000 Місяць тому +1

      @@natarajank9789 this new panvel karjat corridor will be of double track. The existing panvel karjat track would be for mail express and goods trains. So there would be total 3 tracks between panvel and karjat

  • @UsmanPatel-iv4yh
    @UsmanPatel-iv4yh 2 місяці тому +5

    दिवा ते कर्जत लोकल चालु केली तर खुप लोकाना सोयीसकर होईल

  • @n2201
    @n2201 13 годин тому

    What is estimated completion date?
    will it connect Pune to Konkan
    and Pune to Churchgate?

    • @n2201
      @n2201 13 годин тому

      Sorry, Pune to western line

  • @Dadaronaik
    @Dadaronaik 2 місяці тому

    Nice

  • @KetanSalakre
    @KetanSalakre 2 місяці тому

    दोन हजार एकोणतीस च्या वेळी जे असेल ते सरकार इलेक्शन च्या आधी तीन महीने ढोल ताशे वाजवत उद्घाटन होईल असे आंम्हाला वाटते ❤

  • @PrakashShinde-f9y
    @PrakashShinde-f9y 2 місяці тому +1

    Lonavala to karjat seva jhali pahije

  • @abdulrahim6544
    @abdulrahim6544 2 місяці тому +1

    Aisa lagta hai Inaugration ke pehle kaam poora ho hi jayega.😊

  • @nishikantvedak5286
    @nishikantvedak5286 Місяць тому

    Goregaon to borivili extension update please

  • @sandeepkadam7982
    @sandeepkadam7982 2 місяці тому

    Sir request you to cover the new Konkan green field expressway with its total alignments

  • @ashokbadekar6538
    @ashokbadekar6538 2 місяці тому

    Aapla Karjat 😌

  • @asifshaikh5574
    @asifshaikh5574 Місяць тому +1

    Project will be complete till 2032.....

  • @shubhampawara781
    @shubhampawara781 2 місяці тому +1

    Karajat suburban line par express train pn chalnar ka ? Js ki karajat badlapur line vr emu aani expp doni pn chalta as

    • @JaideepKane
      @JaideepKane  2 місяці тому +3

      Te ajun confirm samajle nahi. But Sadhya cha single line ahe tyamule tyavarun mail/express janar or donhi route use karu shaktat

    • @hrid22
      @hrid22 2 місяці тому +1

      ​@@JaideepKane kalyan kasara 3rd line update pls

    • @shubhampawara781
      @shubhampawara781 2 місяці тому +1

      @@JaideepKane ok thank you ☺️

  • @tarique17
    @tarique17 2 місяці тому +1

    Will finish @ 2026

  • @ManishKannanM
    @ManishKannanM 2 місяці тому

    Can you do a video on vattapara viaduct on nh 66
    It is estimated to be largest viaduct in India,with a height of approximately 27 to 30m

  • @omkarpatil3943
    @omkarpatil3943 2 місяці тому

    8:57 sir you have made a mistake while saying
    Its not 800-900 km it's 800-900 m

    • @JaideepKane
      @JaideepKane  2 місяці тому

      I have said ‘meter’ not kilo meter

    • @omkarpatil3943
      @omkarpatil3943 2 місяці тому

      @@JaideepKane Ok sorry
      I was having misunderstanding in listening

  • @sumitghodeswar7668
    @sumitghodeswar7668 Місяць тому

    Kasar kalyan 3 to 4 lines update please

  • @kamaldadlani3972
    @kamaldadlani3972 2 місяці тому

    May be operational after 2027

  • @shardulbirari
    @shardulbirari Місяць тому

    Kalyan badlapur 3 rd 4 th line update please

  • @sujitkhaire5848
    @sujitkhaire5848 2 місяці тому

    Konkan railway kolad to ratnagiri new railway station apdat .. ❤❤

  • @sanatani__raj_
    @sanatani__raj_ 2 місяці тому +1

    Virar dahanu 3rd and 4th line update 😢

  • @koustubgupta4960
    @koustubgupta4960 2 місяці тому

    2027 mae complet hoga

  • @ashutoshMishra-yb8md
    @ashutoshMishra-yb8md 2 місяці тому

    👍👍👍👍👍👍👍👍

  • @abhishekmhamunkar4189
    @abhishekmhamunkar4189 2 місяці тому

    मराठी व्हिडिओ बनवा. 🙏🏻

  • @user-j7y9wIl
    @user-j7y9wIl 2 місяці тому +2

    Watch I-LEAGUE & Watch ISL ⚽⚽⚽
    support Indian football and help to make AIFF richest ⚽ Federation of the world 🌎 🌍 🌏 and make Indians proud like BCCI 🏏🙏🙏🚩vv

  • @mr.mangesh4280
    @mr.mangesh4280 2 місяці тому

    Video Kaise banate hai

  • @girdharadvani2999
    @girdharadvani2999 2 місяці тому

    This project will take another 3 to 4 years

  • @deepakdeepak2938
    @deepakdeepak2938 2 місяці тому

    Dec 2026

  • @samirmali6042
    @samirmali6042 Місяць тому +1

    दांडफटा stop 🛑 hona chahiye

  • @ATUL_JANGAM
    @ATUL_JANGAM 2 місяці тому +5

    Project will be completed till 2028

  • @viralshiyarwala1156
    @viralshiyarwala1156 Місяць тому

    10 sal aur lagega

  • @pallabdas1134
    @pallabdas1134 2 місяці тому

    Aur 3 saal lagega pura kaam honey mein.

  • @inociant
    @inociant Місяць тому

    2-3 sal jayage or bante bante

  • @bharatichaudhari
    @bharatichaudhari 2 місяці тому

    Hum school me the tab se shuru ho raha hai, 23 sal se bhi jyada hogaye hai janta ko bevkuf samjate hai aur kuch bhi nahi, ye kyu nahi hone diya ye bhi janata achhe se janati hai

  • @mehtapramod23
    @mehtapramod23 2 місяці тому +1

    ALL FUTURE RAIL SHOULD BE HIGH SPEED IF WE WANT TO BE SUPER POWER UP TO 2047

  • @AmitTemkar-u6q
    @AmitTemkar-u6q Місяць тому

    December 2026 End

  • @ajay9760
    @ajay9760 2 місяці тому

    We are lossing our maharashtra land and its natural beauty of nature people from all over india will come and we loose our Maharashtrian culture, land, nature, the current govt has nothing do with the nature they just want to expand cities leaving no villages, no forest, no agriculture lands nothing will be left, this current govt of Maharashtra cannot make rule like modi's gujarat if land has sell to Maharashtrian farmers only or to Maharashtrian people other state in india can make rules can save there lands then why cant the Maharashtrian people specially this neta log even if they have power they are like businessman servants no love for the state.

  • @prasannaiyer4030
    @prasannaiyer4030 17 днів тому

    next 5 years project ....no wonder people die to get a govt job ..bcoz hardly they work n hardly complete one project in their lifetime ...horrendous job 😏😏

  • @puranjansafui7846
    @puranjansafui7846 Місяць тому

    Kavivi kisi k kaan k piche jakar ha ha ha ha ha ha aise haso matttttttttt 😡, Taklif hoti hai 🤬

  • @Daughter_of_hades_
    @Daughter_of_hades_ 2 місяці тому

    India should give infrastructure work to Chinese company. We can not remain in race with this type speed of work.

  • @satyam1529
    @satyam1529 2 місяці тому

    Jaideep saheb - what about Old Sri Sai Baba mandir near to railway station? It is still there or will be move somewhere else.
    Also want to know the redevelopment of old Railway station, is happening or not.

  • @satyam1529
    @satyam1529 2 місяці тому +2

    If Railway increase the speed of constructions, than will be by end of December 2025 or may extend to March 2026. Because many places construction of station is pending.
    I think, Railway should merge this Panvel - Karjat line with Old station only. It would have been easy for people to catch local train easily. Other thing is that those who want to catch Express from Karjat station, would also be easy to get at old station and catch the express.

  • @durveshshinde8006
    @durveshshinde8006 10 днів тому

    Dec 2026