Sorry this is not a Technical work. No joints for the Ramp side walls connected to Gate pillars by cutting and removing the plastering. No bricks and concrete blocks watered and cured. The wall to be constructed one day the filling can be done . No consolidation was done before pcc laying for Ramp. But no pcc laid. But the workmanship is Good and Harder. Please try to upload Best work videos.
Very useful video 👌👍👌👍👌👍👌👍 nice 👍👌👌👌
Super work bro l like it
Thanks my friend
Yes water logging should be prevented by the pipe running thru the base of the ramp ,brilliant idea hari
Thanks my friend
Concrete bed daal do aise design me.
Okay friend thanks
Super bro
Thanks my friend
V simple .....gud viedo
Thanks my friend
Thx from Brazil
Thanks my friend...from india
बहुत सुन्दर
Thanks my friend
Sorry this is not a Technical work.
No joints for the Ramp side walls connected to Gate pillars by cutting and removing the plastering.
No bricks and concrete blocks watered and cured.
The wall to be constructed one day the filling can be done .
No consolidation was done before pcc laying for Ramp.
But no pcc laid.
But the workmanship is Good and Harder.
Please try to upload Best work videos.
Okay friend thanks 👍
Next time upload best videos
Work is nice.. But a pipeline or hole should be provided for smooth flow of waste water from either side
Okay friend thanks 👍
Good 👍
Thanks my friend
🎉🎉🎉🎉🎉🎉🎉🎉
Nice work
Thanks my friend
Good technique
Thanks my friend
Very nice video
Thanks my friend
Very nice ❤❤
Thanks my friend
Super
Thanks my friend
Mera bhim bohut upar hain, isko dal kaisay banaye
Thanks my friend
goog
Thanks my friend
❤
Thanks my friend
👍
Thanks my friend
இது எந்த ஊர்
தூத்துக்குடி மாவட்டம்
Simples e eficaz
Thanks my friend
Slope jyada ha i
Thanks my friend
Ok
Thanks my friend
Saia é pra mulher 🚺 kkkk😅😅😅😅😅😅😅😂😂😂😂😂kkkk
Thanks my friend
கேவலமா இருக்கு
உண்மையாகவா bro
Thanks my friend