New Everton Stadium Update with full fly around, 13th November 2024

Поділитися
Вставка
  • Опубліковано 17 гру 2024

КОМЕНТАРІ • 11

  • @JaneKellie-i9y
    @JaneKellie-i9y Місяць тому +8

    As an LFC Fan. Thank-You , For The Video Footage Of
    Goodison Park Update.
    * The Blue & Red Club's,
    Together We Sway.
    It doent Matter What Colour,
    As Father's & Son's They Will Stay.
    We Are The City Of
    Liverpool.

  • @jasonhindle2900
    @jasonhindle2900 Місяць тому +4

    Yet another great video!.Slow and low close up cinematic . Its always nice when you bring us quality film.

  • @davidclason229
    @davidclason229 Місяць тому +3

    Awesome!!!
    Seen more detail in that one video than all the other drone footage I’ve been watching over the last couple of years put together!

  • @brendykabeya899
    @brendykabeya899 Місяць тому +1

    ❤ it's very clean

  • @martinlanglois7129
    @martinlanglois7129 Місяць тому +2

    brilliant footage

  • @davidbadcock2225
    @davidbadcock2225 Місяць тому +1

    As great coverage as ever. My, you flew low over the workers at times.
    Some new PoI's:
    1) @ 0:22 mins I got a surprise with the rusted and flaked spotlights before realising they're UU's.
    2) @ 1:50 mins, it looks as though contractors might be encapsulating the heritage rails. It'll be interesting to see what they look like after the work is done.
    3) @ 3:59 mins, those Panel -Cleaning Contractors are getting one heck of a work-out. I am not surprised in the later shot, one of them has stopped for a rest.
    4) @ 4:49 mins, we can see the gates that will be hung off the southernmost Gate Towers, lying on the ground, outside the new perimeter fence posts.
    5) @ 12:00 mins, as a result of the low flight, we can just see the bottom of the air exhaust panels from the Main Stadium Kitchen, at the back under the overhang, and above the doors.
    6) @ 12:09 mins, the NNw facade is still one of the best places and elevations to see the Leitch design in the brickwork.
    7) @ 12:42 mins, there is still a lot of work going on feeding cables and wiring through the conduits in the North Isolation Bridge, with contractors nearly always present at the holes at either end.
    8) @ 18:25 mins, we can see they've installed the two hinged gates, without their panels, on the SW Concourse Wind-Baffle structure.
    9) @ 18:47 mins, we can see that they have brought in shrubs for planting in the borders on the West Quayside.
    10) @ 19:16, we can see that the contractors appear to be applying the missing mesh fance panels under the balustrades.
    11) @ 19:35 mins - 21:18 mins, a conrtractor appears to be taking photos or a measurement from the middle top of each flight of double-width stairs, a prelude to fitting the handrails up the centre each of the double-width flights?
    12) @ 19:28 mins, it looks as though there are many small shrubs in pots awaiting planting along the West Quayside, parked up against the S Facade of the DNOC.
    13) @ 19:57 mins, I am guessing that the 2 floating pontoons and the blue cherry-picker are going to be used for finishing off the composite decking on the outer edge and Capping Beam for the Lower Promenade.
    14) @ 20:35 mins, we are following the contractors on their return journey from the south end of the West Concourse with the workstation trolley that we saw them pushing from the NW end earlier in the video.
    15) @ 21:32 mins, we can see that they have planted some of the low shrubs mentioned earlier up against the West Quay Balustrades. Whilst we know that plants grow in height over time, we might have expected them to be taller shrubs going in so that they'd obscure the view from the West Concourse of the future parked Pitch UV Light Arrays on the quay north of the DNOC from the start.
    16) @ 26:03 mins, on the ground at last we can see the 2 paneling frames that need to be inserted into the top of the South Stand facade under the Viewing Gallery, the one hole in view here the other at the western end.
    17) I have to wonder if the initial grass-seeding was actually done in diagonal lines as there is a clear diagonal pattern showing contrary to the 90d rectangular blocks that the stitcher applied. yesterday's videos revelaed that they were mowing in the other diagonal direction so as to cut across the diagonal ppatern seen here.

  • @jurgenvoogt1638
    @jurgenvoogt1638 Місяць тому +4

    Gorgeous footage again mate 👍

  • @KnowsleyVerminControl
    @KnowsleyVerminControl Місяць тому +1

    space outside the North stand looks a little tight compared to the other stands

    • @DuncTheBlue1878
      @DuncTheBlue1878 Місяць тому +4

      Only one gate of turnstiles on the north side is the north east corner for the away fans. Home fans won’t be walking along the north access route.