5-Gas Processing - Nitrogen Removal with Cryogenic Distillation - Aspen hysys 7.3

Поділитися
Вставка
  • Опубліковано 30 вер 2024
  • Upper west - Run this town. I do not own this song, all credit and rights goes to the band and the writers.
    1-Gas Processing course with Aspen hysys 7.3 /
    5-Fifth Simulation Process : (Nitrogen Rejection Unit with Cryogenic Distillation Process). (Musical Video).
    Eng.Mohammed Assir
    Al Neelain University - Chemical Engineering Department.
    Dr-Zoling@hotmail.com

КОМЕНТАРІ • 25