5-Gas Processing - Nitrogen Removal with Cryogenic Distillation - Aspen hysys 7.3
Вставка
- Опубліковано 30 вер 2024
- Upper west - Run this town. I do not own this song, all credit and rights goes to the band and the writers.
1-Gas Processing course with Aspen hysys 7.3 /
5-Fifth Simulation Process : (Nitrogen Rejection Unit with Cryogenic Distillation Process). (Musical Video).
Eng.Mohammed Assir
Al Neelain University - Chemical Engineering Department.
Dr-Zoling@hotmail.com