SAP - How to Open closed MM period (MMPI)

Поділитися
Вставка
  • Опубліковано 10 лют 2025
  • MMPI (Initialize Period) is a standard SAP transaction code available within R/3 SAP systems depending on your version and release level.
    Please follow the following procedure, so that you can open & Close the previous period smoothly:
    1. Lock all users out of PRD system.
    2. Add User parameter MMPI_READ_NOTE with value = current date in this format YYYYMMDD
    3. Stop all processing that updates inventory values.
    4. Run t-code MMPI with the correct period after running MMPI just enter the period which you want to open.
    5. Close the period as soon as your work gets completed, because it is very risky to open the previous period for a longer time.
    Note: The MMPI can make inconsistency in material ledger record, it will affect the cost of the material so you need to work around to change the material cost manually.

КОМЕНТАРІ • 12

  • @ErizoAtomico
    @ErizoAtomico 10 місяців тому

    Thanks for the explanation. All clear!

  • @guduruthirumalesh3637
    @guduruthirumalesh3637 3 роки тому +1

    Thank you very much for this vedio Sir

  • @ankitgupta5714
    @ankitgupta5714 2 роки тому +1

    very well explained

  • @arjunvaja4419
    @arjunvaja4419 4 роки тому

    Very clear and thanks for the information

  • @rajyalakshmichithaluri6333
    @rajyalakshmichithaluri6333 3 роки тому

    It was informative, thanks for sharing

  • @ANKIT78766
    @ANKIT78766 4 роки тому

    while posting the migo in current date 26-11-2020 i am getting below error where MMPV Showing Current month 09-20 ( Dec-20). and i want to post entry in 08-20 ( Nov-20).
    how can i fix this issue?

  • @Adi-jk2ef
    @Adi-jk2ef 2 роки тому

    Thanks a lot

  • @RahulTiwari-qy8mv
    @RahulTiwari-qy8mv 4 роки тому

    Very helpfully...

  • @akshaykokate5778
    @akshaykokate5778 2 роки тому

    My current period and posting period is same ..even , prob came in migo

  • @abhinavkadam9479
    @abhinavkadam9479 2 роки тому

    Hello Sir
    I'm getting the below error in MMPV
    MMPV_DATE_CHECK: Errors occurred (see note 10828411)

    • @howtodoit619
      @howtodoit619  2 роки тому

      SAP version?
      Have you maintained the parameter in su01 in the specific sap user id?