  • Опубліковано 7 вер 2024
  • This is the beginning of the conveyor deck on the site. I will have to dig in the pile 4 feet wide and almost 2 feet thick. For 1/14 machines, that is a lot of dirt. I guess it will take me 4 weekends with 2 machines to get this part done. Then I'll put a loading dock.