Context on timeline: video is uploaded in May2023 but in video it says it will take a year to complete by Nov 2023. The video might have shot last year but the person viewing it has no idea of it. While editing the video you can add that context to the viewer.
@@ramkrishnan108 Wilbur Smith and Associates, commissioned in 1962 to study transportation in Mumbai, recommended construction of a 3.6 km road between Haji Ali and Nariman Point on reclaimed land and a 1.04 km tunnel under Malabar Hill up to Girgaon Chowpatty. Smith's report also proposed connectors to Walkeshwar Road and Chowpatty. However, the proposed road was not built.
2100 Electric AC Buses , 900 Electric AC Double Decker Buses , 238 AC Local train , MTHL , Costal Road , 9 to 10 Metro Lines , Worli - Sweri Connecter , Versova - Bandra Sea Link , Virar - Versova Sea Link , Alibuag - Virar Corridor , New Airports , 2 New Railway Lines , etc.. in Next Generation of India. Mumbai will Become the India's Dubai 😅
I am happy to know that costle area is going to devlope for people of area ,i thanks authority doing this .
Sanjeev Sanyal..does he own this channel? Btw fan of his writings!!!
No. This episode is a re-upload from lstv
Mumbai smart project
Fantastic. All the best.
Context on timeline: video is uploaded in May2023 but in video it says it will take a year to complete by Nov 2023. The video might have shot last year but the person viewing it has no idea of it. While editing the video you can add that context to the viewer.
Only if the bandra-versova sea-link is ready, then only the coastal road benefits will come.
Visionary Devendra fadanvis sir 👏😍🚩
And gadkari at the centre.
This project has been conceptualized well before Devendra Fadnavis
@@ramkrishnan108 Wilbur Smith and Associates, commissioned in 1962 to study transportation in Mumbai, recommended construction of a 3.6 km road between Haji Ali and Nariman Point on reclaimed land and a 1.04 km tunnel under Malabar Hill up to Girgaon Chowpatty. Smith's report also proposed connectors to Walkeshwar Road and Chowpatty. However, the proposed road was not built.
👍👍👍👍❤️❤️🎶🎶❤️🎶❤️❤️🎶
Abhi india ke kaafi youtubers china gaye hai to wo dekho pata chaljaayega ke india kaha khada hai
Or development kise kehte hai.
please add source in description
Old video hai kya rajya sabha tv wala????
Yes. It's still relevant to our audience
2100 Electric AC Buses , 900 Electric AC Double Decker Buses , 238 AC Local train , MTHL , Costal Road , 9 to 10 Metro Lines , Worli - Sweri Connecter , Versova - Bandra Sea Link , Virar - Versova Sea Link , Alibuag - Virar Corridor , New Airports , 2 New Railway Lines , etc.. in Next Generation of India. Mumbai will Become the India's Dubai 😅
Bengaluru PPR????
Ig its halted due to no funds from state govt
What did he mean when he said 2.5 railways?
Western, central and harbour ( shorter route ) ....hence 2.5
Asslamu alekum hussain bhai aapkj video kafi acchi hoti h but hindi m bnaya kro
I vote BJP 🎉🎉🎉
India couldn't see one piece of roads if a never modi a wah