SAIT PLUMBING WATER SIZING PART 1

Поділитися
Вставка
  • Опубліковано 26 лис 2024

КОМЕНТАРІ • 21

  • @alanmena8370
    @alanmena8370 2 роки тому

    Crazy helpful video guys. Thank you this helped us a lot down here in Lethbridge

  • @caylewerstroh
    @caylewerstroh 9 років тому +1

    Thanks for posting these videos used them to help me brush up before my ip. I am in sask. Thanks bud!!!! Have good day.

  • @rolandosantiago7179
    @rolandosantiago7179 2 роки тому

    James taylor hits

  • @vishnurajendran5928
    @vishnurajendran5928 9 років тому +2

    Awesome video..thanks a lot for the info

  • @RJMAalex
    @RJMAalex 7 років тому

    thank you so much for making this and taking time !!!!!

  • @killkountgaming
    @killkountgaming 4 роки тому

    Don't you have to take off pressure for the water meter as well? I thought 35 kPa had to be removed from your adjusted pressure as well for the water meter?

    • @notooshaby
      @notooshaby  4 роки тому +1

      We take off pressure for the water meter and back flow prevention devices ( A2.6.3.2.F pressure loss table) in 4th yr. This video is the small commercial method used for 3rd year water supply.

    • @killkountgaming
      @killkountgaming 4 роки тому

      @@notooshaby funny, I JUST wrote my 3rd block and every water line sizing we did we had to account for the water meter, and any prv devices.

    • @notooshaby
      @notooshaby  4 роки тому

      killkount1639 gaming Once again we only do in 4th yr in Calgary. And the pressure loss thru those devices are already taken care of in the question. When using what I nickname table F in the appendix , (pres loss method) it’s simple it’s similar to table 2.6.3.4. The simplified method in 2nd yr, except it’s 4th yr commercial pres loss method. Where did you write your exam?

    • @notooshaby
      @notooshaby  4 роки тому

      I will have to do a video for the 4th yr method as well, it’s too difficult to explain texting, other than me teaching it in class. You are asking questions that refer to the old 3rd yr method.

    • @notooshaby
      @notooshaby  4 роки тому +1

      Once again, what school or province did you write your 3rd year block in, because that will make a difference

  • @juancruces7944
    @juancruces7944 4 роки тому

    Where can I find the tables used in the video?

    • @notooshaby
      @notooshaby  4 роки тому

      in your Canadian National Code book 2010 or 2015 version as explained in the video

  • @Cryptoguy89
    @Cryptoguy89 7 років тому

    Hi
    my 3 villas of same height (g.for and 1st floor) are 135m far from underground Water tank (depth 6.7m)...I planned to place centralized pump over water storage tank. Each villa has 10 bathroom (shower, wc,urinal, washbasin and 1 kitchen and 1 jacuzzi....What's flow and head ? How to choose right pump?

  • @antonymwengi
    @antonymwengi 8 років тому

    How are you getting 25.5 FU's? got it.

  • @GlenGatin
    @GlenGatin 8 років тому

    Just checking out the 2015 code. Looks like a lot of changes to this section.

    • @notooshaby
      @notooshaby  7 років тому +1

      No changes in water supply in 2015..😎

  • @EvendimataE
    @EvendimataE 11 років тому

    sait is a school in Calgary alberta canada

  • @sally5363
    @sally5363 9 років тому

    OH its canadian, NO wonder it sounds all french to me.