Hi, can you tell me the latest version of this POMI? I have the pdf of "POMI, For Works of Construction, June 1979" and still looking for the latest version.
Hello Pradipta and thank you for reaching out 🙏. I’m using the same version that you have, but even if there are more recent versions, they will not have major changes in how the BOQ looks like or how the items are measured. Hope I answered the query 👍
Many thanks for the good work of sharing your knowledge...Please let me know.. What is the significant difference between these professionals in construction works 1. Cost engineer. 2. Measurement Engineer. 3.Estimating engineer. in relation to what a Quantity surveyor does working for a contractor, for a project, As a private practicing consultant or when employed in other institution.
Thanks a lot for watching and much appreciate your valuable support 🙏. This is indeed a great video topic and sure I’ll talk about that. I have added this request to the upcoming video list
Thank you for watching 😊. Please watch this video. This is the start of the series so that you can understand it fully 👍 ua-cam.com/video/TA0URELnlnw/v-deo.html
Thank you Obaid 😊 but it can’t be made in 1 video. In this mini course I’ll go through all the BOQ divisions and if you want more detailed explanation, nothing will be better than the quantity surveying course ❤️👍
I also wish to ask you, What is the significant difference between.. a) Bill of materials made from drawings. b) Bill of materials made from A completed BOQ. c) Schedule of materials made from drawings and one made from a completed copy of BOQ. I also wish that you may find time to briefly explain ( in a video) the basic step by step process of making the two list using a BOQ referring to any standard methods of measurement. (standard methods).
Very Informative Lecture,
Thank you soooo much 🙂
Very informative
Thank you 😊 for watching and for the support 🙏
Hi, can you tell me the latest version of this POMI? I have the pdf of "POMI, For Works of Construction, June 1979" and still looking for the latest version.
Hello Pradipta and thank you for reaching out 🙏. I’m using the same version that you have, but even if there are more recent versions, they will not have major changes in how the BOQ looks like or how the items are measured. Hope I answered the query 👍
@@CEPQS Ok, Thanks for the answer!
@@pradiptanugraha6841 thank you and wish you all the best 😊
Many thanks for the good work of sharing your knowledge...Please let me know..
What is the significant difference between these professionals in construction works
1. Cost engineer.
2. Measurement Engineer.
3.Estimating engineer.
in relation to what a Quantity surveyor does working for a contractor, for a project, As a private practicing consultant or when employed in other institution.
Thanks a lot for watching and much appreciate your valuable support 🙏. This is indeed a great video topic and sure I’ll talk about that. I have added this request to the upcoming video list
you are amazing. hopefully i will be joined your QS & cost control course.
Thank you so much and appreciate your valued watching time ❤️
how i can contact you ?
Hi I really want to enrol for your course. I will like to if there is much difference for RICs and POMI. I am based in the UK. Thanks
Thank you for watching 😊. Please watch this video. This is the start of the series so that you can understand it fully 👍
ua-cam.com/video/TA0URELnlnw/v-deo.html
Thank you sir
ماشاءاللہ
Thank you so much brother 🙏, much appreciated ❤️❤️
Always informative
Well done 😍
Thank you 🙏 😊
I expected you will explain about why not use Section "I " . Anyway please answer it ?
Yeah, that would have been the most important part of the video 🙂
) @CEPQS IN POMI I & O SHALL NOT BE USED TO AVOID CONFUSIONS BETWEEN I &L O AND 0 (ZERO
Sir when do we get new course of your in udemy?
😃 you are getting now on UA-cam, the POMI
Please make a video on entire project quantities from footings to finishing in one video ❤️❤️❤️
Thank you Obaid 😊 but it can’t be made in 1 video. In this mini course I’ll go through all the BOQ divisions and if you want more detailed explanation, nothing will be better than the quantity surveying course ❤️👍
I also wish to ask you,
What is the significant difference between..
a) Bill of materials made from drawings.
b) Bill of materials made from A completed BOQ.
c) Schedule of materials made from drawings and one made from a completed copy of BOQ.
I also wish that you may find time to briefly explain ( in a video) the basic step by step process of making the two list using a BOQ referring to any standard methods of measurement. (standard methods).
Thanks for the request 😃. I’ll prepare a lot to present that 😂. Sure I’ll try my best and thank you for reaching out ❤️
👍