Bill of Quantities in accordance with POMI - Contents of the Bill of Quantities

Поділитися
Вставка
  • Опубліковано 24 гру 2024

КОМЕНТАРІ •

  • @sofrianosarita5168
    @sofrianosarita5168 3 роки тому +1

    Very Informative Lecture,

    • @CEPQS
      @CEPQS  3 роки тому

      Thank you soooo much 🙂

  • @amirwaziramirwazir
    @amirwaziramirwazir 2 роки тому +1

    Very informative

    • @CEPQS
      @CEPQS  2 роки тому

      Thank you 😊 for watching and for the support 🙏

  • @pradiptanugraha6841
    @pradiptanugraha6841 2 роки тому +1

    Hi, can you tell me the latest version of this POMI? I have the pdf of "POMI, For Works of Construction, June 1979" and still looking for the latest version.

    • @CEPQS
      @CEPQS  2 роки тому

      Hello Pradipta and thank you for reaching out 🙏. I’m using the same version that you have, but even if there are more recent versions, they will not have major changes in how the BOQ looks like or how the items are measured. Hope I answered the query 👍

    • @pradiptanugraha6841
      @pradiptanugraha6841 2 роки тому +1

      @@CEPQS Ok, Thanks for the answer!

    • @CEPQS
      @CEPQS  2 роки тому

      @@pradiptanugraha6841 thank you and wish you all the best 😊

  • @hanningtonopondo8907
    @hanningtonopondo8907 2 роки тому +1

    Many thanks for the good work of sharing your knowledge...Please let me know..
    What is the significant difference between these professionals in construction works
    1. Cost engineer.
    2. Measurement Engineer.
    3.Estimating engineer.
    in relation to what a Quantity surveyor does working for a contractor, for a project, As a private practicing consultant or when employed in other institution.

    • @CEPQS
      @CEPQS  2 роки тому

      Thanks a lot for watching and much appreciate your valuable support 🙏. This is indeed a great video topic and sure I’ll talk about that. I have added this request to the upcoming video list

  • @sachithgunathunga1642
    @sachithgunathunga1642 2 роки тому +1

    you are amazing. hopefully i will be joined your QS & cost control course.

    • @CEPQS
      @CEPQS  2 роки тому

      Thank you so much and appreciate your valued watching time ❤️

    • @sachithgunathunga1642
      @sachithgunathunga1642 2 роки тому

      how i can contact you ?

  • @evansaddo7431
    @evansaddo7431 2 роки тому +1

    Hi I really want to enrol for your course. I will like to if there is much difference for RICs and POMI. I am based in the UK. Thanks

    • @CEPQS
      @CEPQS  2 роки тому

      Thank you for watching 😊. Please watch this video. This is the start of the series so that you can understand it fully 👍
      ua-cam.com/video/TA0URELnlnw/v-deo.html

  • @amirwaziramirwazir
    @amirwaziramirwazir 2 роки тому +1

    Thank you sir

  • @faisaldilshad6765
    @faisaldilshad6765 3 роки тому +1

    ماشاءاللہ

    • @CEPQS
      @CEPQS  3 роки тому

      Thank you so much brother 🙏, much appreciated ❤️❤️

  • @faisaldilshad6765
    @faisaldilshad6765 3 роки тому +1

    Always informative

  • @akarqadir
    @akarqadir 3 роки тому +1

    Well done 😍

    • @CEPQS
      @CEPQS  3 роки тому

      Thank you 🙏 😊

  • @sheedyasarahamed2470
    @sheedyasarahamed2470 2 роки тому +1

    I expected you will explain about why not use Section "I " . Anyway please answer it ?

    • @CEPQS
      @CEPQS  2 роки тому

      Yeah, that would have been the most important part of the video 🙂

    • @svsuresh1
      @svsuresh1 Рік тому

      ) @CEPQS IN POMI I & O SHALL NOT BE USED TO AVOID CONFUSIONS BETWEEN I &L O AND 0 (ZERO

  • @kawsarkhan8764
    @kawsarkhan8764 2 роки тому +1

    Sir when do we get new course of your in udemy?

    • @CEPQS
      @CEPQS  2 роки тому

      😃 you are getting now on UA-cam, the POMI

  • @ubaidshaik2774
    @ubaidshaik2774 2 роки тому +1

    Please make a video on entire project quantities from footings to finishing in one video ❤️❤️❤️

    • @CEPQS
      @CEPQS  2 роки тому +1

      Thank you Obaid 😊 but it can’t be made in 1 video. In this mini course I’ll go through all the BOQ divisions and if you want more detailed explanation, nothing will be better than the quantity surveying course ❤️👍

  • @hanningtonopondo8907
    @hanningtonopondo8907 2 роки тому +1

    I also wish to ask you,
    What is the significant difference between..
    a) Bill of materials made from drawings.
    b) Bill of materials made from A completed BOQ.
    c) Schedule of materials made from drawings and one made from a completed copy of BOQ.
    I also wish that you may find time to briefly explain ( in a video) the basic step by step process of making the two list using a BOQ referring to any standard methods of measurement. (standard methods).

    • @CEPQS
      @CEPQS  2 роки тому

      Thanks for the request 😃. I’ll prepare a lot to present that 😂. Sure I’ll try my best and thank you for reaching out ❤️

  • @shimakrocks3
    @shimakrocks3 Рік тому