Design of Circular Sedimentation Tank | Settling Tank | Clarifier

Поділитися
Вставка
  • Опубліковано 25 січ 2025

КОМЕНТАРІ • 17

  • @adityasharma16270
    @adityasharma16270 Рік тому

    Respected sir,
    Sir, may I take any value of depth of sludge in circular and rectangular sedimenation tank

  • @MDDANISH-gl3rg
    @MDDANISH-gl3rg 4 роки тому +1

    Sir what will be retention time for secondary clarifier...?

    • @savenviron1524
      @savenviron1524  4 роки тому

      2.2 to 4.2 hours...

    • @savenviron1524
      @savenviron1524  4 роки тому

      Thanks 😊 keep watching 👍

    • @MDDANISH-gl3rg
      @MDDANISH-gl3rg 4 роки тому +1

      @@savenviron1524 or for primary clarifier sir.,.???

    • @savenviron1524
      @savenviron1524  4 роки тому +1

      Detention Period for primary clarifier = 1.65 to 4 hours, you can refer CPHEEO manual for more design guidelines

    • @MDDANISH-gl3rg
      @MDDANISH-gl3rg 4 роки тому +1

      How to get CHPEEO MANUAL SIR, BECAUSE DETENTION PERIOD IT SEEM TO WRONG, BECAUSE IN MANY OF MY ETP PROJECT I FOUND SECODARY CLARIFIER RETENTION TIME 8HR OR LESS FOR PRIMARY CLARIFIER....

  • @akshaypawar9881
    @akshaypawar9881 4 роки тому +1

    Excellent Solution

  • @musaib888
    @musaib888 3 роки тому +1

    Thank you bro. Aap acha samjatay ho

  • @lisojordan3042
    @lisojordan3042 4 роки тому +2

    You have assumed so many things. How are you ensuring that the values which you have assumed are correct? are you not supposed to do any checks?

    • @savenviron1524
      @savenviron1524  4 роки тому +1

      You can take check for Weir loading..
      If weir loading rate exceeds then increase diameter and choose compatible Side water Depth.
      Thanks for watching..👍