A lot of great work and by your self as well fair play, Does the line of cut slabs against the house not wind you up? You could of set it out so it worked full slabs, it’s only a couple of 100mm one way or the other?
Good job 👍old stone mason should always put your tread down first and risers on top went do that should allow 20 mL overhang on the treads I'm running a drip through them be land them that the way I was taught been marble granite stone York be do this work for 40 years old school stone mason you never stop learning 👍 look really good job what done how I said 👍
Wow some effort we’ll done on your own. Had one question the threshold drain where did you drain the water to water it connected to the rainwater pipes from rood drainage or just into the ground?
Awesome job - and almost identical to what I have planned for my garden. A few questions: 1. How many tones of MOT did you put down (justa s a rough measure)? 2. Did you put a slope on the drain pipe running from the ACO to the rainwater drain - if so by how much? 3. What was the spec/description of the membrane you put under the MOT? 4. What are the black rubber?? leads on the left side of the patio steps? Did you put seals in or are they electrical wires? Thanks in advance.
H! 1.5 tonne a m.o.t per 10 sq.m Pipe running with slope, slope just for water flows, water easy goes true away. Weed membraine for driveways and patios. On the steps sides is el. Cables for future conection led ligts for every step and all around the wall. After been done by electrician lads. I just leave the cables out for conection.
to level and set each slab individually and drying time of primer and cement, there can be multiple problems with pouring a massive pad unless drylaying , 1 once the cement mix is down its a race to lay all tiles, level can be off- you will need to walk in the cement....
I hope you don't get cracks. I would have layed a slab with mesh and let it cure before laying the tile, especially if the joint is narrow. Thats a big area.
What did you use to stick the tiles to the wall? I have a small raised patio with flag on edge showing around the sides that I would like to stick porcelain to.
You’ve got cuts on two sides of it surely you could of avoided both sets of cuts with a little planning from the front, Your work looks spot on till that point and I just wonder to bother of
very well done, thanks for the visit to your project!
Brilliant the skill in setting out every part of this job before laying one porcelain slab is mind-blowing.
Amazing amount of work done by one guy
Absolute cracking job. Beautifully done and the lines are spot on. Only wish I could do this... LOL!
Your a horse of a man a serious amount of work went into that a good clean tidy job👍
Hell of a job on your own mate. I've been there and it can be soul destroying but we'll worth it in the end. We'll done buddy.
Monster of a job, end result was top work, just needs some lighting on the walls
awesome job!!!!
A lot of great work and by your self as well fair play,
Does the line of cut slabs against the house not wind you up?
You could of set it out so it worked full slabs, it’s only a couple of 100mm one way or the other?
Good job 👍old stone mason should always put your tread down first and risers on top went do that should allow 20 mL overhang on the treads I'm running a drip through them be land them that the way I was taught been marble granite stone York be do this work for 40 years old school stone mason you never stop learning 👍 look really good job what done how I said 👍
Nice job :)
Very impressive 👍
Wow some effort we’ll done on your own. Had one question the threshold drain where did you drain the water to water it connected to the rainwater pipes from rood drainage or just into the ground?
It conected to the rainwater pipes
Awesome job - and almost identical to what I have planned for my garden. A few questions: 1. How many tones of MOT did you put down (justa s a rough measure)? 2. Did you put a slope on the drain pipe running from the ACO to the rainwater drain - if so by how much? 3. What was the spec/description of the membrane you put under the MOT? 4. What are the black rubber?? leads on the left side of the patio steps? Did you put seals in or are they electrical wires? Thanks in advance.
H!
1.5 tonne a m.o.t per 10 sq.m
Pipe running with slope, slope just for water flows, water easy goes true away.
Weed membraine for driveways and patios.
On the steps sides is el. Cables for future conection led ligts for every step and all around the wall. After been done by electrician lads. I just leave the cables out for conection.
Impressive results. Why is the multiple mixes of the base mortar better than pouring a concrete slab?
to level and set each slab individually and drying time of primer and cement, there can be multiple problems with pouring a massive pad unless drylaying , 1 once the cement mix is down its a race to lay all tiles, level can be off- you will need to walk in the cement....
Wow what a great job looks superb how many sq metres was it
Around 200sq.m
I hope you don't get cracks. I would have layed a slab with mesh and let it cure before laying the tile, especially if the joint is narrow. Thats a big area.
What did you use to stick the tiles to the wall? I have a small raised patio with flag on edge showing around the sides that I would like to stick porcelain to.
External tile adhesive for porcelain
@@stanislavdidenko1811Did you do any prep work on the concrete block work before applying the wall tiles, such as using a specific primer?
@@theweltmeister69 judt in case, you can apply primer. And use external tile adhesive for porcelain.
Nice work, how long did it take you?
4weeks
Could you tell me where you got the slabs from and what they cost per meter please
Codsal stoune and paving. 36-44£ per sq.m
Do you cover West Sussex .
No
How slippery is it when wet?
Is non slipery surface.
R11 non slipery sertificate
You’ve got cuts on two sides of it surely you could of avoided both sets of cuts with a little planning from the front,
Your work looks spot on till that point and I just wonder to bother of
Do you cover essex area?
Sorry no. If
Not bad mitre cuts on ya copings. It looks better gaps in alleyway not the same gully in the middle of a flag..sorry to ne so particular
Amazing amount off work done by one greedy guy!! Thinks off no man but himself!!