Irish Rail Engineering works at Glenageary Part 1/3. 8/4/23

Поділитися
Вставка
  • Опубліковано 1 жов 2024
  • Here we see the first part of the Easter weekend engineering works at Glenageary. This first part was removing the old track on the southbound line and replacing the ballast.

КОМЕНТАРІ • 63

  • @frankanddanasnyder3272
    @frankanddanasnyder3272 Рік тому +5

    Need the guy just talking on his cell phone to push the remaining gravel out of the cars....

  • @keithfernandes7350
    @keithfernandes7350 Рік тому +8

    Cutting across inhospitable terrains yet uniting the hinterland and cities; come hell or high water the railways are truly a lifeline. Working without recognition or awards they are truly God's chosen few❤

  • @peterscandlyn
    @peterscandlyn Рік тому +17

    Interesting viewing, thanks for your time. Curious why those trucks aren't fully dumping, hands-in-their pockets boys should be on to that?

    • @martindonat3249
      @martindonat3249 Рік тому

      you mean why not dump all the trailer at once ? most likly is the Hydaulic system not up to operating more than one trailer at the time , such trailer need a lot of power to get pumped

    • @jackx4311
      @jackx4311 Рік тому +1

      @@martindonat3249 - no; he means why didn't they FINISH emptying each wagon, instead of leaving ballast in the corners which prevented the doors from closing. That could well mean the ballast wagons were out of gauge, and could hit lineside structures or Permanent Way staff.

    • @martinkearns8205
      @martinkearns8205 Рік тому

      @@jackx4311 I highly doubt they are out of gauge. Things like that monitored quite stringently

  • @northtustinsteamworks5172
    @northtustinsteamworks5172 Рік тому +4

    1 guy working and 5 guys standing around watching... 😕

    • @nelsonchinasamy9857
      @nelsonchinasamy9857 Рік тому

      That is the reason why the rest of the world cannot match the Chinese in building anything. Those people go to work to work and there are no ff... ng unions.

  • @RangieNZ
    @RangieNZ Рік тому +4

    The hi-rail dozer is pretty cool - not seen one of those before.

  • @Kapparie
    @Kapparie Рік тому +5

    Wondering why the railbed is cut so deep into the landscape.🤔 It seems the side unloaders don't work very well with ballast. A small amount remains in the sideloaders, preventing the lids from closing completely.

    • @Irishtransportspotter
      @Irishtransportspotter  Рік тому +1

      It does. In 2020 they used Hobbs wagons instead of the trucks for the last part which was better

  • @NN-iu6bh
    @NN-iu6bh Рік тому +3

    A two-way UNIMOG, great! Greetings from GAGGENAU, the home of the UNIMOG

  • @franktuckwell196
    @franktuckwell196 Рік тому +4

    Be interesting to learn who came up with the concept to retro fit diesel trucks with hydro-powered rail wheels to convert land to rail vehicles. In my twenty years on the railways i saw them many times, but still thought "Wow", when i saw them. I like the massive side tipping ballast trucks. The railways were always good at concept vehicles to do one particular job, but does it very well.

    • @Irishtransportspotter
      @Irishtransportspotter  Рік тому +2

      I am interested to. I must reasearch

    • @pearlyhumbucker9065
      @pearlyhumbucker9065 Рік тому +1

      That is a very old thing.
      Even the first cars were used as trolley cars, equipped with railway wheels.
      During the Second World War, some countries went one better and equipped trucks with interchangeable wheels - there were the wildest constructions.
      After the Second World War, someone started to install a lifting and lowering mechanism for track guidance on vehicles that could run on the rails with their rubber wheels - such as the Unimog - and could transmit drive and braking forces through the rubber wheels - and the two-way vehicle was finished.
      I think it would be difficult to find a defined "first manufacturer of road-rail vehicles". It is probably a fact that during the wars all the military administrations involved seemed to be concerned with this topic.

  • @wzbroniony663
    @wzbroniony663 Рік тому +1

    Zostało trochę kamienia i nikt tego nie wysypał leniwi ludzie

  • @johnhughes667
    @johnhughes667 Рік тому

    I have watched this excellently taken video and it is such a pity that the photographer couldn't be given proper access to the site (Health & Safety). Comments have been made about the number of orange suits standing around "doing nothing". These are supervisors hose jobs are to instruct the machine drivers, ensure that the workers are coordinated and to step in immediately to sort out problems. What you see is a very very complex operation in coordinating a large number of machines, all simultaneously doing different jobs and without getting in each others way. Space on the site is very restricted and without proper supervision chaos would result. This mechanised method of track renewal is fast and efficient. Before mechanisation, there would be around 300 manual workers digging with pick and shovel, it takes 10 men to lift a short length of rail into position on to the new sleepers which have already laid out manually. Not only that, how do you "accommodate" hundreds of men on locations usually in the countryside a miles from anywhere ? By "accommodate " I mean proper onsite facilities to modern standards such as canteens, toilets, buses to bring the men to work and to bring them back to wherever they stay the night. I hope that this puts what you see, into perspective. John Hughes.

  • @FrogandFlangeVideo
    @FrogandFlangeVideo Рік тому +2

    Very nice captures !! This is a really interesting operation to see. James.

  • @TeezerDriz
    @TeezerDriz Рік тому +3

    Great work. New safe tracks. How long will they last before next re-fit? 50 years + ?

    • @Irishtransportspotter
      @Irishtransportspotter  Рік тому +3

      I think at least 20 Max years id say unless something happens to that section of rail.and it needs to be replaced earlier.

    • @turboconqueringmegaeagle9006
      @turboconqueringmegaeagle9006 Рік тому

      @@Irishtransportspotter yes nice footage you got cheers.
      Welded continuous track has a 30+yr life with mixed traffic, can't imagine they're putting jointed track back down, lot of investment over there in railways I hear, hopefully you'll keep getting us good vids like this one.

    • @pearlyhumbucker9065
      @pearlyhumbucker9065 Рік тому

      I doubt that it will last very long. They obviously don't put any drainage in, but put the track bed in standing water. Doesn't look very durable.....

    • @perstaffanlundgren
      @perstaffanlundgren Рік тому +1

      As long as the rock ballast is free from small particles the water would
      Run out from the fill without problems .
      That there is water below doesn't madder so much if the rail bank is
      Made up of non capillary fill.
      The place they have filmed in seems to be a cut into bed rock, maybe blasting the rock again to the degree that water runs of is not practically atchivibal.
      I would think they clean the old ballast and reuse the suitable fraction s in it ,if the rock is good enough.
      There is also a possibility that there a drain pipe under the cable channel on the side. (the grey strip)

  • @trainsmachineryldegmtrains3509

    Super video! Nice captures with rail machines in action! Thumbs Up and Subscribe
    Greetings from Dublin
    Andrew

  • @joshuaW5621
    @joshuaW5621 Рік тому

    I was there watching some of the work as it was going on.

  • @Gastell0
    @Gastell0 Рік тому

    That Unimog pulling the whole train of gravel AND powering the pneumatics of these carts to tip them

  • @buster-jr5lr
    @buster-jr5lr Рік тому

    two line rail why not use another train to load and unload from ? this seems a very slow and costly way of doing things

  • @JoeyLovesTrains
    @JoeyLovesTrains Рік тому

    Interesting that it’s build upon a concrete casing

  • @jensschroder8214
    @jensschroder8214 Рік тому

    9:21 The locomotive is a Mercedes Unimog

  • @lostmoose7352
    @lostmoose7352 Рік тому

    Definately not their 1st time 👍

  • @brettt9612
    @brettt9612 Рік тому

    It's a good foundation 👍

  • @feyenwilly1683
    @feyenwilly1683 Рік тому

    hands in their pockets , thats working lol

  • @2Fast4Mellow
    @2Fast4Mellow Рік тому

    I couldn't help noticing those straight pieces of preassemblies track pieces in the bend. Is that Irish irony?

    • @Irishtransportspotter
      @Irishtransportspotter  Рік тому

      I have no clue

    • @WaylandJoe
      @WaylandJoe Рік тому

      They looked like the old track panels that had been lifted, ready for the new sleepers and CWR to go in?
      Never seen Unimogs being used before.
      This side of the Irish sea, we use Cl.66 locos and a rake of JNA wagons with roadrailers to unload ballast.
      Interesting video nonetheless.

  • @johannesdevreeze1367
    @johannesdevreeze1367 Рік тому

    Ververy interesting

  • @andydelarue9344
    @andydelarue9344 Рік тому

    Love It there was a shot there eight people just standing ,doing nothing

  • @worldcooking
    @worldcooking Рік тому +1

    How great is this Irish technology in the construction of railways!

  • @hartmutrausch
    @hartmutrausch Рік тому

    Wieso werden die Anhänger nicht restentlert?.

  • @09vrodz
    @09vrodz Рік тому

    You're ALL fired.... now why didnt you dump all 8 boxes at 1 time.... you cant fix ........

  • @serzmihlev5239
    @serzmihlev5239 Рік тому

    Отстой какойто.

  • @Kraber50
    @Kraber50 Рік тому +1

    Typisch England oder Irland. Technisch um Jahrzehnte zurück !!!

    • @jackx4311
      @jackx4311 Рік тому

      @Kraber50 - Also, sagen Sie es uns, Meistervolk; Wie kommen Sie jetzt mit der Macht voran, nachdem Sie Ihre Atomkraftwerke abgeschaltet haben und beim Gas völlig von diesem verrückten Putin abhängig sind?

  • @mikebritcom3171
    @mikebritcom3171 Рік тому

    begorrah!

    • @jackx4311
      @jackx4311 Рік тому

      @Mike Britcom - Oh, FFS . . . *NO* Irishman ever says 'Begorrah!'

  • @petrosiliuszwackelmann8857
    @petrosiliuszwackelmann8857 Рік тому +1

    19:17 "Zweiwege Unimog" rocks 🦾

    • @Irishtransportspotter
      @Irishtransportspotter  Рік тому +1

      Never seen it before and it looks great

    • @petrosiliuszwackelmann8857
      @petrosiliuszwackelmann8857 Рік тому +2

      @@Irishtransportspotter this looks greater 😅
      ua-cam.com/video/rBugtO7ZrTE/v-deo.html

    • @johnhughes667
      @johnhughes667 Рік тому

      Absolutely brilliant video !! Even MORE enjoyable when played at 2x speed. John Hughes.