Checking and Slugging Meterbase

Поділитися
Вставка
  • Опубліковано 29 сер 2024
  • An example of one method of testing, slugging, and covering a single phase meterbase.
    Meters are temporarily slugged until the permanent watthour meters can be installed by Journey-level Meter Electricians.

КОМЕНТАРІ • 1

  • @joel-i6z
    @joel-i6z Місяць тому

    more meter videos please