@M Daud 10:38 That looks like 8+ feet free fall to me, assuming the guy standing is at least 5 and half feet. I am a structural engineer and personally I wouldnt allow this in my projects under my supervision. I generally allow only 3 to 5 feet.
@@Rocky.7707 Segregation is the problem. The heavier gravel particles will separate from the slurry during free fall. You can read about it in any concrete related books.
why the fuck did I watch a robot tell me about stuff I dont care about? All i learned is that they have no harness for being elevated 10+feet in the air. No way they are surviving a fall from those heights!
More on:
Foundation- ua-cam.com/video/W5G2TwDWSnU/v-deo.html
Erection- ua-cam.com/video/vrDC-Dfnnhw/v-deo.html
Under Ground Cable- ua-cam.com/video/armLWFEi8tk/v-deo.html
OPGW- ua-cam.com/video/armLWFEi8tk/v-deo.html
Pile Load Test- ua-cam.com/video/trnrUBUCXGo/v-deo.html
Scaffolding- ua-cam.com/video/5wLxlq6JE40/v-deo.html
Erection- ua-cam.com/video/C-QhkGbxryQ/v-deo.html
Stringing- ua-cam.com/video/4Lje07848bE/v-deo.html
Conductor Sagging- ua-cam.com/video/UsmXO7KNBlc/v-deo.html
Tower Testing- ua-cam.com/video/m0LtgEh5JIc/v-deo.html
GIS Termination- ua-cam.com/video/2fkxS39egdg/v-deo.html
Shotcrete- ua-cam.com/video/lNb8Y4Sux1w/v-deo.html
Subscribe:
ua-cam.com/users/PritamSingharoy
Enjoy Watching!
thankyou.so far helpful
Hi Pritam, Could u please help in knowing how the foundation forces are calculated for Transmission Line Towers ?
This is more useful than any power system book.
Keep making these sorts of videos they're really useful
Excellent work dear. Please keep it up. A great contribution.
very useful and practical for me who is an english translator in the transmission line project.
A lot of hard work. Thanks for sharing.
PARABÉNS ÓTIMO TRABALHO. 🇧🇷
Thanks you !!
Is it advisable to discharge concrete from that height ? Why not use chutes? Pouring concrete and placing concrete are two different things .
Bhut badhiya 👌
Thank you
thank you for this very nice video
Excellent
Good job Pritam..
excellent, very strong
Wonderful Work
Trial mix design it is good for make the quality of the foundation transmission
Yes design mix helps you to control the quality as per standards....
Nice video. keep up the good work
Thank you!
谢谢
Is concrete allowed to free fall from that height? Really surprising to me how engineer-in-charge accepted this. Easy but not right i think.
@M Daud 10:38 That looks like 8+ feet free fall to me, assuming the guy standing is at least 5 and half feet. I am a structural engineer and personally I wouldnt allow this in my projects under my supervision. I generally allow only 3 to 5 feet.
What would happen? Is there anything wrong if it is poured from that height? Just curious.
@@Rocky.7707 Segregation is the problem. The heavier gravel particles will separate from the slurry during free fall. You can read about it in any concrete related books.
@@narayananjayachandran831 I see, thank you for taking your time to explain.
@@Rocky.7707 Welcome
Please make videos on pit marking in details
Useful video
Subscribed.
Thank you
Thank you sir
Hello sir can i ask for a copy on your foundation plan?
This is a copyright content
good
Great
awesome
Good
Mantap
Concrete falling not more than 1meter
Cover block missing under reinforcement after that backfill curring? 😜😜😜
👍🏿👍🏿👍🏿👍🏿
CONCRETE FREEFALL
👍🏿🤘🏿
Prob setting ataa hein bhai @pritam singha roy
Development length too short.
why the fuck did I watch a robot tell me about stuff I dont care about? All i learned is that they have no harness for being elevated 10+feet in the air. No way they are surviving a fall from those heights!
Hi
What about earthing?
Depending on the soil resistivity, there are two types of earthing generally used in transmission line
1. Pipe Type Earthing
2. Counter-poise Earthing
Thank you