    Basic Steps:
    Step 1. The host steel pipeline is subdivided into appropriate pull section lengths for HDPE liner insertion.
    Step 2. On the job site, shorter lengths of HDPE liner are thermally fused together, creating longer monolithic lengths to match the steel pipe segments.
    Step 3. A cable or Kevlar rope with a sizing plate and blow-down pig is sent through a steel pipeline section.
    Step 4. At the opposite end of the steel pipe pull section, the cable is attached to a pull-head on the matching HDPE liner.
    Step 5. The HDPE liner is pulled through a roller reduction box prior to entering the steel host pipe. The radial compression of the HDPE liner allows it to temporarily fit within the inner diameter of the steel pipe. This reduction in the HDPE liner’s outer diameter is maintained due to axial tension during the pulling process.
    Step 6. Once the HDPE liner has been pulled completely through the host pipe, the tension is released and the HDPE expands, allowing the liner to form a “friction fit” against the steel.
    Step 7. Specially machined HDPE flange “stub-ends” are used to iso- late the lined segments. Steel compression rings are utilized to ensure a leak-free connection between the HDPE gasketed steel flanges.
    Step 8. The lined segment is thoroughly tested prior to bolting up the steel flanges at which point the pipeline is ready to be placed back in service.

КОМЕНТАРІ • 18

  • @МозгЖивильник
    @МозгЖивильник 3 місяці тому +1

    Спасибо за видео: "HDPE Gauge Plating and Lining, HDPE Lining Basic Installation Steps"!

  • @nwdualsport
    @nwdualsport 3 роки тому +2

    Finally decided they wanted to pull more pipe, but waited to long, pipe began to expand back to original size in host pipe and then pulled the pulling head off and even though the pulling line is weighted, I would not have let the two workers walk out near the head of the pipe.....and then it broke...safety, safety, safety!

    • @MD-CP
      @MD-CP  2 роки тому +2

      Safety first

  • @roanthuin7880
    @roanthuin7880 9 місяців тому

    I work at AtkinsRéalis Brazil's office. I am working in a project which this technology could be the best solution in our case. Do you know any company that realize this process that I can get in touch with. So we can discuss more deeply this kind of lining? Like the restriction, bends, maximum length per section, local infrastructure...

  • @carlosmayo5411
    @carlosmayo5411 Рік тому

    Where can I buy this kind of equipment?

  • @safaashaker907
    @safaashaker907 2 роки тому +1

    السلام عليكم
    هل هذه الماكنة صناعة مصرية ، ممكن المواصفات ؟

    • @MD-CP
      @MD-CP  2 роки тому

      Canadian sub-Contractor

  • @امحازموعلي
    @امحازموعلي 2 роки тому +1

    Can you know the companies that can implement this and have similar businesses in the Middle East?

    • @MD-CP
      @MD-CP  2 роки тому

      what is your company?

  • @redaabosamra5140
    @redaabosamra5140 4 місяці тому

    معاك وصيلة تواصل للفنيين ؟

  • @SROUR222
    @SROUR222 9 місяців тому

    السلام عليكم
    لو سمحتم الشركة متواجدة في أي دولة

    • @MD-CP
      @MD-CP  9 місяців тому

      كنديه

  • @abdulazeemsyed6565
    @abdulazeemsyed6565 3 роки тому

    who is the services provider for the HDPE lining ?

    • @37omed
      @37omed 2 роки тому +1

      we can provide you in Iraq.

    • @MD-CP
      @MD-CP  2 роки тому

      Canadian Contractor

    • @arunmishra4915
      @arunmishra4915 Рік тому

      ​@@MD-CPhii

    • @MD-CP
      @MD-CP  Рік тому

      Hi arun

    • @husniyacoub
      @husniyacoub 3 місяці тому

      @@MD-CPpls what is company name? Website pls or contact details for Iraq job