NEW POWER HAMMER! (Prep and Foundation Work) - Part 1

Поділитися
Вставка
  • Опубліковано 20 вер 2024

КОМЕНТАРІ • 13

  • @wayneheitz8390
    @wayneheitz8390 2 роки тому +1

    Looks great👏👏

  • @nine11kid
    @nine11kid 2 роки тому +1

    Well... you got your workout in for the day. Looking good guys.

  • @ValhallaIronworks
    @ValhallaIronworks 2 роки тому +2

    Tell you what, props to whoever poured the original slab. They did a good job!

    • @BakerForge
      @BakerForge  2 роки тому +1

      They sure did! It was quite solid.

  • @ivanipang5948
    @ivanipang5948 2 роки тому +1

    Hight work... good job man 😯😯😯😯👏👏👏👏

  • @MtPhillipMetalWorks
    @MtPhillipMetalWorks 2 роки тому +1

    lets gooo!!

  • @redwolfknives3174
    @redwolfknives3174 2 роки тому +1

    Love how you welded the rebar together. Most people just wire tie. Excited to see your new hammer put to work! Love seeing the red clay on the dig out. Very cool!

  • @FilthyFishinFreak
    @FilthyFishinFreak 2 роки тому +1

    Badass can’t wait to see the hammer up and running

  • @Banjoandguns
    @Banjoandguns Рік тому

    You could of just put it on the original slab maybe height was wrong but that was a good slab

    • @BakerForge
      @BakerForge  Рік тому

      A power hammer this size needs 3-4 feet of concrete under it. A 6" slab is not enough. Plus the foundation under the hammer needs to be isolated from the pad the shop sits on so it doesnt rattle the place to pieces.