Schneider Acti9 RCBO and Acti9 distribution board. NO FLYLEADS!!! Plus what is an MCCB?

Поділитися
Вставка
  • Опубліковано 5 гру 2024

КОМЕНТАРІ • 22

  • @UKsystems
    @UKsystems 2 місяці тому

    these are great as the 125amp works easily with a solar inverter connected too

  • @cainzach1
    @cainzach1 2 роки тому +1

    Hi Mark
    Another great video you have produced. One your videos l watched before which was on
    Electrical testing.
    I showed this video to my 3rd year Apprentice group, they did like your video.
    I will be showing this video to them as well.
    This particular group will have to complete this year 2 three hour practical exams.
    One on fault finding the other on an installation certificate, also two theory exams.
    The board you demonstrated reminds me of consumer units when I worked in France.
    Their consumer units are all double pole. Including circuit circuit breakers or rcbo's.
    If I remember correctly there was made by Schneider . French consumer units are unique, they operate similar to the one you are showing.Brian

    • @electrician247
      @electrician247  2 роки тому

      Wow Brian that is awesome. Means a lot. Glad you and the students thought it was okay

  • @robbiedix6775
    @robbiedix6775 2 роки тому +1

    Hi Mark, how do you install a SPD in the DC (Consumer Unit) thanks.

  • @campbellcaraher1008
    @campbellcaraher1008 Рік тому +1

    Can a single phase double pole RCBO be installed to this consumer unit for an EV supply eg ?

    • @electrician247
      @electrician247  Рік тому

      I believe schneider have that in the range. Unless you mean a double module rcbo. In which case the hoards allow for configuration to accommodate that. Thanks

  • @omega1maestro
    @omega1maestro 2 роки тому +2

    How do you connect a spd?

  • @mrhudson0073
    @mrhudson0073 2 роки тому +1

    Can you help? I am an adult learner not far from you I have passed my level 2 exams but have to work under supervision of an electrician what else do I have to do to get employed in the industry? Thanks in advance

    • @electrician247
      @electrician247  2 роки тому +1

      Hi mate. Are you looking to get some site experience to build a portfolio for the NVQ? Happy to try and help

    • @mrhudson0073
      @mrhudson0073 2 роки тому

      @@electrician247 yeah the route I took is complicated but if I can build a portfolio I'm hoping that will make me more employable

  • @zjzozn
    @zjzozn 2 роки тому +2

    Nice demo 👍🎄⭐️

  • @richardcawrey
    @richardcawrey 2 роки тому +1

    Great vid

  • @effervescence5664
    @effervescence5664 2 роки тому +1

    Just need more manufacturers to follow suit and someone to do a dual neutral bar so main RCD's can be fitted for split load boards though the cost would probably be too great.

    • @electrician247
      @electrician247  2 роки тому +1

      Check out the new eaton boards mate. They do just this.

    • @effervescence5664
      @effervescence5664 2 роки тому +1

      @@electrician247 I haven't ventured onto their domestic/single phase listings in years (got a little peeved with Memshield 2/3 ranges not being compatible and Mem2 being a pain to get hold of). That said we predominately use them for 3 phase installations, if you're recommending them I'll have to take a look and consider them again.

  • @paulfarrell2840
    @paulfarrell2840 2 роки тому +1

    Nice bit of kit but to pricey