Greenpeace spain headquarters - Green Solutions Awards 2019

Поділитися
Вставка
  • Опубліковано 15 вер 2024
  • Click here to discover this case study: www.constructi...
    haz clic aqui para acceder al estudio de caso en Castellano: www.constructi...
    For its headquarters, Greenpeace Spain was looking for a building corresponding to the values defended by the NGO. It was therefore essential to work on the materials used, energy efficiency, but also the comfort of the occupants. Costs also had to be kept under control.
    The result is an innovative renovation, whose design has focused on initiatives that can be easily replicated. Air conditioning is thus entrusted to an air/water exchanger system free from chlorofluorinated liquid. This solution also reduces the equipment’s power consumption to air pressure boosters alone.
    It is a passive building, whose electricity is produced by a nearby wind turbine. All heating production is therefore based on electrified solutions.
    The materials were subjected to a life cycle analysis and to an indoor air quality impact-assessment. The floor is made of cork, while the insulation is made of recycled textile and the paints are organic. Posters announcing the construction of the project have been recycled into lamp shades.
    Finally, the carbon footprint of this renovation was compensated by reforestation in Nicaragua.
    Maître d’ouvrage : sAtt Triple Balance
    Maître d’oeuvre : sAtt Triple Balance
    Architecte : sAtt Triple Balance
    Promoteur : Greenpeace España
    Bureau d’études thermiques : Alter Technica Ingenieros
    Constructeur : 3B Ingenieria y Consultoria
    Autre : Maria Gil de Montes
    Cabinet de conseils en environnement : Fundacion para la Salud Geoambiental

КОМЕНТАРІ • 1

  • @brianenel506
    @brianenel506 7 місяців тому

    Wow they use alot of electricity and oil based products