Five-Level Work Breakdown Structure

Поділитися
Вставка
  • Опубліковано 22 січ 2025

КОМЕНТАРІ • 51

  • @drutheflu
    @drutheflu 9 років тому +24

    I am a PM for Software Applications I was watching video's just to freshen up on my approach and this is the best explanation of WBS anywhere. You keep it simple which makes it easy to understand, thank you.

  • @nemonemo6285
    @nemonemo6285 2 роки тому

    I have over 20 years as a PM. You have managed to explain this topic Perfectly.

  • @ugurkilic2577
    @ugurkilic2577 9 років тому +8

    Thank you. The clearest explanation I've ever seen.

  • @imziminhas
    @imziminhas 3 роки тому

    Thank you for putting it out with simplicity. This is probably going to stick with me for a long time. Well explained.

  • @mkyrene
    @mkyrene 8 років тому +1

    The explanation is so clear and concise!! WBS is definetly understood by me!

  • @neiloconnell2120
    @neiloconnell2120 6 років тому +1

    Excellent description of a WBS including the budgeting aspect. Thank you for it.

  • @AdrianaGirdler
    @AdrianaGirdler 4 роки тому

    Great explanation of the WBS. Cheers!

  • @4x4dually
    @4x4dually 6 років тому +37

    I had to watch it twice. I spent the entire first time trying to figure out how they mirrored the video. LOL

    • @FenixDown147
      @FenixDown147 5 років тому

      Ya, is he writing mirrored?

    • @shandorcoachman945
      @shandorcoachman945 4 роки тому +2

      same here :D

    • @tusharniras
      @tusharniras 8 місяців тому

      LOL

    • @tokstochi3121
      @tokstochi3121 3 місяці тому

      probably was recorded with a camera behind a glass and the image(video) was mirrored. Just my thought.

  • @petermwesiga4761
    @petermwesiga4761 4 роки тому

    Will simply say thank you. Very good explanation. Make me fall in love with Project Management once again.

  • @yamin207eb
    @yamin207eb 5 років тому

    Thank you, young man for making life easier

  • @bmbrooklyn
    @bmbrooklyn 4 роки тому

    I want a glass board like yours. It is awesome! Thanks

  • @ernstguillaume2788
    @ernstguillaume2788 8 років тому +1

    very clear explanation. I am captured by your blackboard... great tech

    • @Mickey_vee
      @Mickey_vee 8 років тому +1

      he writes backwards like a boss !

    • @joshuadangerfield7223
      @joshuadangerfield7223 7 років тому +2

      The video is mirrored. Check out his shirt pocket and watch. It's on the opposite side. Such a cool idea!

  • @91099Babar
    @91099Babar 7 років тому +2

    You should show us how would the Budget be created in the Wbs ? How did you estimate the budget ??

  • @bztree80
    @bztree80 7 років тому +1

    How would you break down continuous tasks in to WBS? Say you’re building 100 airplanes, each plane would require assembly, testing, painting etc. You would start assembling first few and while they are being tested and painted you assemble the next few. The stages are overlapped and each with multiple instances(planes)

    • @sexmaeschine69
      @sexmaeschine69 6 років тому

      yt8019 definition of a Project is that it is unique. Are you sure that you like to plan a Project?

    • @ceeveemydeen5174
      @ceeveemydeen5174 4 місяці тому

      After the completion of first one the project will become a continuous operation /process with standard procedure, schedule, capacity of man, material, machine, market,plant
      with pre determined wbs.
      Time study, movement study, productivity etc can estimate for continuous program.

  • @alexandrecadier4779
    @alexandrecadier4779 4 роки тому +2

    This man is a very nice professor i like all his videos, can we have his name ?

  • @yutipm13
    @yutipm13 5 років тому

    Its so comprehensive. Thank you Sir.

  • @hernanperez912
    @hernanperez912 6 років тому +2

    whats first, the chicken or the egg?

  • @spbs-pk3ii
    @spbs-pk3ii 6 років тому

    He made it look so easy..

  • @fykyafet
    @fykyafet 2 роки тому

    amazing explanation

  • @Office3
    @Office3 6 років тому

    what is his name?

  • @longjefferson
    @longjefferson 8 років тому +3

    Thank you. Are you writing in reverse? How do you that?

    • @ThayerSchool
      @ThayerSchool  7 років тому +1

      Yes, exactly.

    • @rexhart203
      @rexhart203 5 років тому

      whatever it is, why bother??? Can hardly read a word!

  • @periteu
    @periteu 7 років тому

    What blackboard is that?

    • @ThayerSchool
      @ThayerSchool  7 років тому +3

      It's a transparent "whiteboard," and then the video is flipped.

    • @periteu
      @periteu 7 років тому

      Thayer School of Engineering at Dartmouth thanks :D. Very professional and great explanation of the topic.

  • @nathancourtaney5867
    @nathancourtaney5867 6 років тому

    This video was cool and all but how are the words he is writing not backwards.. Is he just good at writing backwards??

    • @rexhart203
      @rexhart203 5 років тому

      writing???? Man, that is hieroglyphics! I have seen doctors who wrote better. If you can't do it properly, don't do it. takes away from a great explanation.

  • @petermoss5341
    @petermoss5341 5 років тому +4

    I just want to know how he is writing on the back side of my monitor screen.

  • @tomrwestcott
    @tomrwestcott 7 років тому +5

    Work Package is NOT a task. Work Package is the lowest level deliverable in the WBS. It's a noun and not a verb. Work Packages contain activities.

    • @yutipm13
      @yutipm13 5 років тому

      Then what's the difference between a product-oriented and a Task WBS? This for one is a Hybrid WBS

  • @borgaonkar-actsolandassoci1171
    @borgaonkar-actsolandassoci1171 7 років тому

    May I use this video in one of my training presentation course? I will give credit to you. Kindly revert pls.

  • @oydeekoi8271
    @oydeekoi8271 7 років тому

    Smashed dat thumbs up button.

  • @jpo6444
    @jpo6444 6 років тому +1

    Tasks and activities are not Work Packages. Work Packages are made up of tasks/activities. Work Packages are deliverables, like Mech design drawings. Also, best practice is to develop an estimate from the bottom up, not top down. The goal of the WBS is to identify all of the scope of a project so that it can be monitored and controlled. That scope is then used to
    develop a schedule (activities), assign resources, and develop a budget.

  • @RPCGames
    @RPCGames 4 роки тому

    This was great, thanks, I've been looking for "what is a design proposal engineering?" for a while now, and I think this has helped. Have you ever come across - Biycarlett Astounded Builder - (should be on google have a look ) ? It is a good one of a kind product for discovering how to download thousands of business and project management templates minus the headache. Ive heard some great things about it and my co-worker got cool success with it.

  • @cornelldavis2497
    @cornelldavis2497 3 роки тому

    I think we deliver to as me singing in an see the life as we be the raise of keenon we is here wassup

  • @kgh5025
    @kgh5025 5 років тому +1

    Great Video, Great Explanation, Terrible Handwriting. Hahaha

  • @vibechecks1987
    @vibechecks1987 2 роки тому +1

    This is the worst handwriting ive ever seen in my life